Out here in CT (and central MA), it varies all over the lot. 
Typically if I hear anything it is 1 year. To some extent, it also 
depends on the location. Some areas go longer because it is difficult 
to get a flow test. Of course, in other areas, you could submit a 
flow test from the 1870s and it would be accepted, provided there was 
a PE stamp on the drawing. But 1 year is pretty typical.


At 01:02 PM 5/12/2009, you wrote:
>We are reviewing our policy as to the length of time for use of 
>hydrant flow test data.
>
>We have heard ranges from as short as 6 months to 18 months.
>
>If the forum members would be willing to share thoughts as to how 
>old of a test is accepted by the AHJ's you deal with it can help 
>guide our revised policy.
>
>Thanks in advance,
>
>Rich Richardson
>Seattle Fire Department
>
>
>
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to: [email protected]
>
>To Unsubscribe, send an email to:[email protected]
>(Put the word unsubscribe in the subject field)

Todd G. Williams, PE
Fire Protection Design/Consulting
Stonington, Connecticut
www.fpdc.com
860.535.2080  
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to