Occupancy shift mid stream? Put it back to arch team let them direct? Sent on the Sprint® Now Network from my BlackBerry®
-----Original Message----- From: Tom Duross <[email protected]> Date: Thu, 25 Mar 2010 20:00:01 To: [email protected]<[email protected]> Subject: 13D Question Got a SFD 13D system I designed and almost ready for installation. The Owner, a psyche has decided to move his practice home and make the Basement his Office. I'm a little concerned about the big open waiting area he wants to make, 5 heads to cover. It was all cut up before, no more than 2 heads per room, finished. It's clearly out of 13D criteria and I can't support even 4 heads, I tried, even with minimum spacing. Plus, the service is already in so I can't ask to have it increased. I did tell him tamper switches were required and some real sort of fire alarm (we were just putting in a bell and interconnecting the smokes plus his security system to the flow switch). I've told him we have a problem so he wants to do it later. I need to write him a letter to posture and protect myself because we're going forward with the family room, in-law bedroom and toilet, and storage rooms as drawn. Anybody done this? Thanks Campers! Tom Go Red Sox!! (opening night with the spankees and no beer served at fenway) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
