Hi from Montreal Question: For a product (flight simulator) which would seem to be in the "light industrial" category, does EMC (CE) certification through the TECHNICAL CONSTRUCTION FILE path require NOTIFIED BODY or COMPETENT BODY involvement?
Thanks Ed Janzen EMC Engineer CAE Electronics Montreal, Canada E-mail: [email protected]
