We need to decide how the "Fix Version" property is handled when resolving an
issue. A description of this property at:
http://www.atlassian.com/software/jira/docs/v3.11/projects.html#versions
Fix Version(s) - this is the version(s) in which the issue was (or will be)
fixed. For instance, the bug affecting versions 1.1 and 1.2 might be fixed in
version 2.0. Note that issues which do not have a Fix Version are classified as
'Unscheduled', as shown in the screenshot above.
I'm thinking this property would always be set to the next unreleased version
but I'm confused because the property can be multivalued. What does everyone
think of leaving this set to "Unknown" when a developer resolves an issue. When
the issue is tested before a version is released, the tester can set the "Fix
Version".
-Andy