At lenr-forum, me356 is quoted from somewhere:

"I can only tell, that the test was conducted in the condition that was
very far from ready from my side. This mean that I was not prepared for
testing with the current reactor at all. But this is the only one with a
cover - thus nothing else can't be tested in this way. I didn't knew that
the test will occur at this time as I was informed just few days before,
but I dont want to waste money and time that was spent for already bought
tickets and accommodation. So I have nothing to loose whatever it will work
or not."


This is outrageous. me356 and everyone else knew weeks ago that the test
was scheduled. He was not informed "just days before." This is a lie. And
he does have something to "loose" (lose): he credibility. Apparently, he
does not care about that.

This, along with the excuse that he has family responsibilities and cannot
work today, makes me suspicious. If he refuses to allow one or two members
of the MFMP to stay past Monday, I will conclude that he is a fake.

- Jed

Reply via email to