As I soon (4 to 8 weeks) will hopefully be doing my own calorimeter
measurements, Robert will you please assist my learning curve by
pointing how the 6 Oct E-Cat thermocouple input and output heat
exchanger measuring points were incorrect and how they should have been
done properly so I don't make a similar mistake.
AG
On 11/9/2011 12:50 AM, Robert Leguillon wrote:
By assuming that all of the water pumped in was evaporated. Unfortunately, it
was fed into the steam condensers and back into the E-Cat in a closed loop.
This us why the October 6th test was so important. It stood the chance to
produce viable calorimetry. Unfortunately, the placement of the secondary
thermocouples bring the results into question