My son and I started on the bathroom and utility room floor yesterday.
Today we're taking off for worship, but my body needs a break too.  Standing
up from a crouch is a bit difficult this morning.
We pulled up the top floor all around where the toilet was.  The sub floor
looked pretty good, so we left that, and laid in a piece of plywood, with
shims to bring it up the the level of the floor around.
The bathroom is off the kitchen, and there is another door that goes off
from the bathroom into the utility room
We are going to lay a continuous sheet of vinyl floor through the door so it
is seamless between the rooms.
We have fitted underlayment into the bathorrm and through the door into the
utility room.  That took lots of measuring and fitting.  The rest of the
underlayment should go easier, so maybe Monday afternoon we will put the
vinyl in place.
Blessings,
Tom


[Non-text portions of this message have been removed]

Reply via email to