Date -   14/08/08
Day -  Thursday
Start -  0800
End -  1430

Harnser's present position  http://tinyurl.com/Harnser-s-route

We had a briefing meeting last night to run through todays activities.
It was agreed to start at our own times so after chatting with the boat
opposite we decided to push off at 8 am together.
So at 8 this morning we backed up through the bridge and winded in the
BW basin before heading off together to the Wryley and Essington Canal,
often refereed to as the Curly whirly. There were still 4 boats to leave
after we went, the rest had set off at 6am. The travelling was quite good
but it wasn't long before we caught up with 2 boats who had their far
share of weed hatch visits, one of them did draw 3 feet, as we ticked
along behind them a couple of the others caught us up. We passed them on
one of their many visits down the hatch so I was now front boat of the
late starters. The weather was kind to us and so was the rubbish and I
didn't need to do a visit down the hatch until after we moored for the
night at the end of the Cannock Extension. Clover the old coal boat
manage to pick up a sleeping bag and spent over an hour getting it off
so it was just as well they started early. A couple of the boats went
down the Extension, but we didn't bother having done it last time we
were this way.

-- 
Brian <[EMAIL PROTECTED]>

Join SOW and help save our waterways
http://www.saveourwaterways.org

 

Reply via email to