Jim, I believe you are correct, especially for the tests according to EN
61000-4-2 and EN 61000-4-5, (ESD & Surge).  The tests should be done at
lower voltages.  We have always done it that way at TUV Rheinland.  By the
way, for the surge tests, following the standards and doing all the lower
voltages at a 1 per minute rep rate and 0,90 & 270 degrees of the AC wave
takes over 3 hours to perform.  I say this because we have been told we
take too long to do a surge test!


Bruce Fagley