In my opinion, this cannot be done. In my shop, HSM, performs all SMS managed functions, followed by all non-SMS managed functions
There is a further separation in the non-SMS managed functions. All "stacked" functions are performed before "non-stacked" functions. HTH, <snip> On z/OS 1.11, the HSM manual says a stacked dump tape can contain dumps from both SMS and non-SMS packs. However, with STACK(99), every test case I have run results in SMS packs first going to one 3592 tape (genned as 3590-1) and then non-SMS packs going to a second tape. I have tried with 1, 2, and 3 SMS packs of different sizes and HSM always changes tapes after processing all the SMS packs in the dump class. Has anyone else run into this and how did you solve it? </snip> ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
