Hi Jubayer.
Thank you for the response.

Would you kindly provide a link to that data set. I have found the
following link for TEXAS 2000 bus system. But It does not contain the
Minimum on/off time constraints of the generators. Any idea about this
Minimum on/off time constraints?

Best Regards

https://electricgrids.engr.tamu.edu/electric-grid-test-cases/

On Tue, Mar 17, 2020 at 12:15 PM Jubeyer Rahman <[email protected]> wrote:

>
> Hi Fouad,
> You can take a look at the Texas-2000 bus system data repository.
>
> Another one could be the DISPA-SET repository.
>
> Regards,
> Jubeyer
>
>
>
> On Tue, Mar 17, 2020 at 10:42 AM Meraj Fouad <[email protected]> wrote:
>
>> Dear MATPOWER Community,
>>
>> I want to run Unit commitment (SCUC) for larger system(>1000). Does
>> anyone have data set for this purpose. I need a system with Min on/off
>> times, Ramp up/down limit and cost function.
>>
>> Best Regards
>> Fouad Hasan
>>
>