I recently asked similar questions to the Texas A&M folks, they pointed me
to one of their publications:
[1]
T. Xu, A. B. Birchfield, K. M. Gegner, K. S. Shetye, and T. J. Overbye,
“Application of large-scale synthetic power system models for energy
economic studies,” in *Proceedings of the 50th Hawaii International
Conference on System Sciences*, 2017.

It provides a table of reasonable ranges for these parameters you are
looking for.

On Tue, Mar 17, 2020 at 2:40 PM Hasan Fouad <[email protected]> wrote:

> Thank you very much Jubeyer. I will work on that.
>
> Best Regards
> Fouad hasan
>
> On Tue, Mar 17, 2020 at 1:28 PM Jubeyer Rahman <[email protected]> wrote:
>
>> Hi,
>>
>> The information you're looking for aren't in the pwb (power world binary
>> file); you need to take a look at the paper published by Adam Birchfield
>> (look at page 5);
>> https://scholarspace.manoa.hawaii.edu/bitstream/10125/41535/paper0386.pdf
>>
>>
>> And you will not get these information directly (suitable to the capacity
>> of your generator) and in many cases you have to assume, that's why the
>> DISPA-SET dataset might give you some workable data.
>>
>>
>> https://github.com/energy-modelling-toolkit/Dispa-SET/tree/master/Database/PowerPlants
>>
>>
>> Hope this helps.
>>
>> Regards,
>> Jubeyer
>>
>>
>>
>> On Tue, Mar 17, 2020 at 12:49 PM Meraj Fouad <[email protected]> wrote:
>>
>>> Hi Jubayer.
>>> Thank you for the response.
>>>
>>> Would you kindly provide a link to that data set. I have found the
>>> following link for TEXAS 2000 bus system. But It does not contain the
>>> Minimum on/off time constraints of the generators. Any idea about this
>>> Minimum on/off time constraints?
>>>
>>> Best Regards
>>>
>>> https://electricgrids.engr.tamu.edu/electric-grid-test-cases/
>>>
>>> On Tue, Mar 17, 2020 at 12:15 PM Jubeyer Rahman <[email protected]>
>>> wrote:
>>>
>>>>
>>>> Hi Fouad,
>>>> You can take a look at the Texas-2000 bus system data repository.
>>>>
>>>> Another one could be the DISPA-SET repository.
>>>>
>>>> Regards,
>>>> Jubeyer
>>>>
>>>>
>>>>
>>>> On Tue, Mar 17, 2020 at 10:42 AM Meraj Fouad <[email protected]>
>>>> wrote:
>>>>
>>>>> Dear MATPOWER Community,
>>>>>
>>>>> I want to run Unit commitment (SCUC) for larger system(>1000). Does
>>>>> anyone have data set for this purpose. I need a system with Min on/off
>>>>> times, Ramp up/down limit and cost function.
>>>>>
>>>>> Best Regards
>>>>> Fouad Hasan
>>>>>
>>>>

Reply via email to