Hi Steven,
Thank you very much for the response.

Did you prepare something on that? Any rules how to distribute the time
constraints for 100s of similar generators?

Best Regards

On Tue, Mar 17, 2020 at 1:54 PM Steven G <[email protected]> wrote:

> I recently asked similar questions to the Texas A&M folks, they pointed me
> to one of their publications:
> [1]
> T. Xu, A. B. Birchfield, K. M. Gegner, K. S. Shetye, and T. J. Overbye,
> “Application of large-scale synthetic power system models for energy
> economic studies,” in *Proceedings of the 50th Hawaii International
> Conference on System Sciences*, 2017.
>
> It provides a table of reasonable ranges for these parameters you are
> looking for.
>
> On Tue, Mar 17, 2020 at 2:40 PM Hasan Fouad <[email protected]>
> wrote:
>
>> Thank you very much Jubeyer. I will work on that.
>>
>> Best Regards
>> Fouad hasan
>>
>> On Tue, Mar 17, 2020 at 1:28 PM Jubeyer Rahman <[email protected]>
>> wrote:
>>
>>> Hi,
>>>
>>> The information you're looking for aren't in the pwb (power world binary
>>> file); you need to take a look at the paper published by Adam Birchfield
>>> (look at page 5);
>>> https://scholarspace.manoa.hawaii.edu/bitstream/10125/41535/paper0386.pdf
>>>
>>>
>>> And you will not get these information directly (suitable to the
>>> capacity of your generator) and in many cases you have to assume, that's
>>> why the DISPA-SET dataset might give you some workable data.
>>>
>>>
>>> https://github.com/energy-modelling-toolkit/Dispa-SET/tree/master/Database/PowerPlants
>>>
>>>
>>> Hope this helps.
>>>
>>> Regards,
>>> Jubeyer
>>>
>>>
>>>
>>> On Tue, Mar 17, 2020 at 12:49 PM Meraj Fouad <[email protected]> wrote:
>>>
>>>> Hi Jubayer.
>>>> Thank you for the response.
>>>>
>>>> Would you kindly provide a link to that data set. I have found the
>>>> following link for TEXAS 2000 bus system. But It does not contain the
>>>> Minimum on/off time constraints of the generators. Any idea about this
>>>> Minimum on/off time constraints?
>>>>
>>>> Best Regards
>>>>
>>>> https://electricgrids.engr.tamu.edu/electric-grid-test-cases/
>>>>
>>>> On Tue, Mar 17, 2020 at 12:15 PM Jubeyer Rahman <[email protected]>
>>>> wrote:
>>>>
>>>>>
>>>>> Hi Fouad,
>>>>> You can take a look at the Texas-2000 bus system data repository.
>>>>>
>>>>> Another one could be the DISPA-SET repository.
>>>>>
>>>>> Regards,
>>>>> Jubeyer
>>>>>
>>>>>
>>>>>
>>>>> On Tue, Mar 17, 2020 at 10:42 AM Meraj Fouad <[email protected]>
>>>>> wrote:
>>>>>
>>>>>> Dear MATPOWER Community,
>>>>>>
>>>>>> I want to run Unit commitment (SCUC) for larger system(>1000). Does
>>>>>> anyone have data set for this purpose. I need a system with Min on/off
>>>>>> times, Ramp up/down limit and cost function.
>>>>>>
>>>>>> Best Regards
>>>>>> Fouad Hasan
>>>>>>
>>>>>

Reply via email to