I guess we could go back to yester-year:
1/2" and 3/4" SSU and SSP. Pipe Scheduled Trees. No Backflow.
Is Sway Bracing required? No matter where it is, if it is an Essential
Facility, yes, if not, no.

Were there a lot of failures way back when?, before you had to have a PHD in
Philosophy and a Law Degree? 

-----Original Message-----
From: Roland Huggins [mailto:[email protected]] 
Sent: Wednesday, November 06, 2013 9:13 AM
To: [email protected]
Subject: Re: NFPA25 scope

ACtually this issue is much broader than NFPA 25.  NFPA is asking the
question, what if anything that it do to reduce the number of failures of
the sprinkler system to control the fire (due to changes of contents changes
in the water supply, etc where the water discharge is not enough to control
the fire).  One of the question is should verifying the adequacy of the
sprinkler system be part of an NFPA 25 inspection or some other NFPA
document?

That is the starting point for this thread.  What do you gals and guys
think?

Roland

Roland Huggins, PE - VP Engineering
American Fire Sprinkler Assn.       ---      Fire Sprinklers Saves Lives
Dallas, TX
http://www.firesprinkler.org





On Nov 5, 2013, at 10:09 PM, "Douglas Hicks" <[email protected]> wrote:

>
http://www.nfpa.org/newsandpublications/nfpa-journal/2013/november-december-
2013/features/closer-look?order_src=C246
> 
> More on 25 and the scope of 25.
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
>
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to