Sorry I don't have one. This has never been required. The city form we were instructed to use has nothing about this either.
This ahj has not done this in the past. He also had some other comments that were unusual. When we called about these, his answer was "I'm the ahj. I require it my way. You will comply or no permit." At that point you know you are going to lose every battle. Travis Mack, SET MFP Design, LLC "Follow" us on Facebook: https://www.facebook.com/pages/MFP-Design-LLC/92218417692 Send large files to MFP Design via: https://www.hightail.com/u/MFPDesign Sent from my iPhone > On May 8, 2017, at 5:47 AM, Triolo, Joe <[email protected]> wrote: > > I think it’s a good idea, Travis do you have a copy you could send me? > Thanks > > Joe Triolo > > From: Sprinklerforum [mailto:[email protected]] > On Behalf Of Pete Schwab > Sent: Monday, May 08, 2017 8:32 AM > To: [email protected] > Subject: RE: special inspections > > Travis > I wish more AHJ’s would require this. Then we might see GC’s opt to go with > Interstitial Sprinklers instead. > Pete > > Peter Schwab > VP of Purchasing and Engineering technologies > > Wayne Automatic Fire Sprinklers Inc. > 222 Capitol Court > Ocoee, Fl 34761 > > Mobile: (407) 468-8248 > Direct: (407) 877-5570 > Fax: (407) 656-8026 > > www.waynefire.com > > <image001.jpg> > > I sleep in a sprinklered home, do you? > > > > From: Sprinklerforum [mailto:[email protected]] > On Behalf Of Travis Mack, SET > Sent: Wednesday, May 03, 2017 5:09 PM > To: [email protected] > Subject: special inspections > > Has anyone run into a case where the AHJ requires a special inspection form > filled for when the interstitial space is filled entirely with > non-combustible insulation? > > It is fairly common in this area for Type V construction multi-family > projects to have the interstitial spaces, and sometimes flat attic spaces, to > be filled entirely with non-combustible insulation in lieu of providing fire > sprinklers in the area. However, we have one local AHJ that is mandating > this is a condition that requires a special inspection form. It's a done > deal because he flat out stated that it is our way and this is how it will > be. I just wonder if anyone else has run into this. We are in the process > of investigating what all is required. It seems that we will need a > professional engineer to go out and sign off that all insulation is filling > the cavity entirely. > > > > -- > Travis Mack, SET > MFP Design, LLC > 2508 E Lodgepole Drive > Gilbert, AZ 85298 > 480-505-9271 > fax: 866-430-6107 > email:[email protected] > > http://www.mfpdesign.com > https://www.facebook.com/pages/MFP-Design-LLC/92218417692 > Send large files to us via: https://www.hightail.com/u/MFPDesign > LinkedIn: https://www.linkedin.com/in/travismack > > > > This email has been checked for viruses by AVG antivirus software. > www.avg.com > > > > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
