Am 05.03.2011 17:37 schrieb Michael Pedersen:
Since we'll be on the latest Trac version, we an use it as is while we
clean up 1.1, 1.5, 2.0.4, and 2.1.1. After each release of each version,
we can re-evaluate the current status. If we can move to Allure easily
at that point, we set Trac to read only and move. If we're not able to
easily move yet, we continue using Trac.

What do you think? Is it worth the effort (I think it's even less effort
than your current plan, personally), or would you prefer to make the
switch now?

My point is that if we start with a clean slate, there is nothing to *move* i.e. we can start using Allura right now. It's probably not even desirable to move all the closed tickets to Allura, even if that will be possible later. Interesting for us are primarily the active tickets, and triaging them and re-entering on Allura where necessary can easily be managed by us in one or two weeks. Heck, I am willing to do this alone in one day if nobody helps, just to end this drama. We need to screen the active tickets anyway. After that, we can move the closed Trac tickets to a read-only instance, just as an archive. Making it a read-only archive also has the advantage that we don't need to set up and care about authentication, spam protection etc. for the Trac.

-- Christoph

--
You received this message because you are subscribed to the Google Groups 
"TurboGears Trunk" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/turbogears-trunk?hl=en.

Reply via email to