Hi Peter,

On 13/06/16 19:31, Peter Knapp wrote:
Did you order an upgrade or a new cct to perform a cease and reprovide?

And are you moving from a gig or below to a 10 gig. Ie moving from a
simplex/bx delivery to a duplex?

No, this is not an upgrade. Its a brand new unrelated EAD 100 circuit which happens to have one end in the same rack that already has some EAD 100 and EAD 1000 circuits in it, and they are claiming ECC for that end. My understanding is that even though new fibre is needed for the new circuit, there should not be ECC charges for installing new fibre to a rack that already has existing fibre into it as this counts as increasing existing network capacity. However, they have quoted ECC for both ends of the new circuit.

In the past, whenever we have filled up a tube to any given location we have always had an additional fibre tube installed for free when we next ordered to that location, but its been a while since we were last in this situation. I was wondering if a change to the rules might have been sneaked in when the £ 2800 exemption was brought in recently (and if so they forgot to update the FAQ).

Regards,
Ben.


--
Ben McKeegan
Netservers Limited
01223 446000 ext 8103


Reply via email to