Hey Wolfang, Unfortunately the ASF removes attachments from emails sent to mailing lists.
Best regards, Pierre Smits Apache Trafodion <https://trafodion.apache.org>, Vice President Apache Directory <https://directory.apache.org>, PMC Member Apache Incubator <https://incubator.apache.org>, committer Apache OFBiz <https://ofbiz.apache.org>, contributor since 2008 Apache Steve <https://steve.apache.org>, committer On Thu, May 24, 2018 at 9:25 AM, Wolfgang Paul Rauchholz < [email protected]> wrote: > Attached a simplified process description of the scenario to be > implemented: > Important is: > (1) Company controls cost of out-sourced production > (2) Company retains title of ownership of raw material @ sub-contractor > site > > To make this process as automatic as possible, it would be helpful if a PO > is created automatically when work order (WO) is released and that WO is > closed once that PO was received. > Is this possible? > > Wolfgang > > > > > On Wed, May 23, 2018 at 9:37 PM, Pierre Smits <[email protected]> > wrote: > >> Are we addressing here the supply chain involving an OEM (see [1]) where >> one manucaturer produces parts (or even the entire product) for a >> 'manufacturer' that incorporates it into its product (think Foxconn >> producing for Apple)? >> >> Or are we addressing the issue of having people participating in the >> manufacturing process? >> >> If it is the latter case, then this becomes like a 'hiring a temp' >> business >> case handled between HRM and the Purchasing Department (establishing >> service agreements) to raise the correct 'service' P.O. >> >> If it is the first case (supply chain) then it is way more complex. >> >> Looking at this from the the viewpoint of the Manufacturing Manager of >> internal company (the party using OFBiz) and the OEM providing parts to >> the >> production run at the right moment in time (JIT), a task to produce the >> part would - for some -make sense. But if we're talking JIT delivery, then >> it is actually not a production step, but rather the delivery of the part >> to the warehouse just before the ProductionRun (or even a task therein) is >> started. Making it more an issue of setting correct facility and order >> thresholds for the component in the catalog app. When the ProductionRun is >> confirmed (in the Manufacturing component, by the Manufacturing Manager) , >> the ATP should be checked and if it doesn't meet the ProductionRun >> requirements it should trigger the creation of the P.O. >> >> Entity-wise everything is in place. SECA-wise there might be some gaps. >> >> All in all there is more to this (more details - business analysis- >> required than outlined outlined in the various postings in this thread. >> >> >> [1] https://en.wikipedia.org/wiki/Original_equipment_manufacturer >> >> Best regards, >> >> Pierre Smits >> >> Apache Trafodion <https://trafodion.apache.org>, Vice President >> Apache Directory <https://directory.apache.org>, PMC Member >> Apache Incubator <https://incubator.apache.org>, committer >> Apache OFBiz <https://ofbiz.apache.org>, contributor since 2008 >> Apache Steve <https://steve.apache.org>, committer >> >> On Wed, May 23, 2018 at 2:40 PM, [email protected] < >> [email protected]> wrote: >> >> > >> > Following up on you discussion of sub-contracting. I am testing too. >> > I defined the BOM and routing task with type Subcontracting. This >> routing >> > task was assigned a routing and all components that go to the >> subcontractor >> > were added using 'EDIT ROUTING PRODUCT LINK'. >> > When releasing a work order, the system does not seem to create a PO >> > automatically. >> > This PO should have the components attached and move the material from >> > their inventory to the sub-contractor facility. By receiving the PO >> back, >> > the task in work order should close too. >> > Am I missing something or does this functionality not exist? >> > >> > How do I do a BOM / routing cost roll-up over the standard BOM/routing >> to >> > set the standard cost? >> > >> > Thanks, Wolfgang >> > >> > >> > >> > > > > -- > > Wolfgang Rauchholz > > > >
