I read it rather like Axil. That is to say no matter that the regular E-Cat 1 MW plant performed successfully the E-Cat X is the future and the statement was to prepare us for further delays. Industrial Heat have been keen on a long term demo before going to market and this probably means a test for the E-Cat X.

Reply via email to