Care to share where you saw this? The dummy reactor was switched on at 12:20 PM of 24 February 2014 by Andrea Rossi who gradually brought it to the power level requested by us. Rossi later intervened to switch off the dummy, and in the following subsequent operations on the E-Cat: charge insertion, reactor startup, reactor shutdown and powder charge extraction. Throughout the test, no further intervention or interference on his part occurred; moreover, all phases of the test were monitored directly by the collaboration.
On Mon, Oct 13, 2014 at 8:19 AM, Jones Beene <[email protected]> wrote: > *From:* Jed Rothwell > > > > 2) They did not calibrate above 450 C and this was not done ON ORDERS > FROM ROSSI > > > > JR: It does not say that anywhere. > > > > Please read the report carefully before making silly rationalizations. > > > > >