Care to share where you saw this?

The dummy reactor was switched on at 12:20 PM of 24 February 2014 by Andrea
Rossi who gradually
brought it to the power level requested by us. Rossi later intervened to
switch off the dummy, and in the
following subsequent operations on the E-Cat: charge insertion, reactor
startup, reactor shutdown and
powder charge extraction. Throughout the test, no further intervention or
interference on his part occurred;
moreover, all phases of the test were monitored directly by the
collaboration.


On Mon, Oct 13, 2014 at 8:19 AM, Jones Beene <[email protected]> wrote:

>   *From:* Jed Rothwell
>
>
>
> 2)    They did not calibrate above 450 C and this was not done ON ORDERS
> FROM ROSSI
>
>
>
> JR: It does not say that anywhere.
>
>
>
> Please read the report carefully  before making silly rationalizations.
>
>
>
>
>

Reply via email to