You seem to be saying that it is not found in the “revised” or edited version? There is an edited version of the report, in which details like this are removed. Rothwell, no doubt, would chose to only read the edited version.
From: Blaze Spinnaker
Care to share where you saw this?
The dummy reactor was switched on at 12:20 PM of 24 February
2014 by Andrea Rossi who gradually brought it to the power level requested
by us. Rossi later intervened to switch off the dummy, and in the following
subsequent operations on the E-Cat: charge insertion, reactor startup,
reactor shutdown and powder charge extraction. Throughout the test, no
further intervention or interference on his part occurred; moreover, all
phases of the test were monitored directly by the collaboration
They did not calibrate above 450 C and this was not done ON
ORDERS FROM ROSSI
JR: It does not say that anywhere.
<<attachment: winmail.dat>>

