Of course, Rothwell may be trying to distinguish between Rossi actually
doing it himself of giving the order to do it.

Hmm… flashback a few years …. "It depends on what the meaning of the word
'is' is.”  I would hope that we are above that kind of double-talk on
vortex, but of course we are not.

                _____________________________________________
                From: Jones Beene 
                
                You seem to be saying that it is not found in the “revised”
or edited version? There is an edited version of the report, in which
details like this are removed. Rothwell, no doubt, would chose to only read
the edited version.

                                From: Blaze Spinnaker 
                
                                Care to share where you saw this?
                                
                                The dummy reactor was switched on at 12:20
PM of 24 February 2014 by Andrea Rossi who gradually brought it to the power
level requested by us. Rossi later intervened to switch off the dummy, and
in the following subsequent operations on the E-Cat: charge insertion,
reactor startup, reactor shutdown and  powder charge extraction. Throughout
the test, no further intervention or interference on his part occurred;
moreover, all phases of the test were monitored directly by the
collaboration
                

                                They did not calibrate above 450 C and this
was not done ON ORDERS FROM ROSSI
                
                                JR: It does not say that anywhere.
                                

<<attachment: winmail.dat>>

Reply via email to