Apart from the planned six month test by the scientists that tested the E-Cat for Elforsk May 2013, it seems there will be another six month test in the US.

1.
   Andrea Rossi
   September 4th, 2013 at 6:30 PM
   <http://www.journal-of-nuclear-physics.com/?p=816&cpage=8#comment-788897>


   Frank Acland:
   As we said, a 6 months long validation test had to be made, and I
   repeated that validation of the E-Cat is in course. As always, I
   will not give any specific information regarding the validation test
   in course, with exception of the fact that this test will last more
   than 6 months. The results will be published after the test will
   have been completed, whatever the results, positive or negative.
   I do not know where the publication will be made, because it does
   not depend on me. Also this long run test is being performed by an
   indipendent commettee, financed by institutions totally indipendent
   from us. Obviously the location in which the test is in course will
   be disclosed in the publication that will be made. I can only say
   that it is in the USA factory of a Customer. The E-Cats under test
   have been manufactured completely in the USA, in the factory of the
   US Manufacturer, indipendently from me: therefore also the
   manufacturing has been made by an indipendent- from- me party.
   Warm Regards,
   A.R.

Reply via email to