Apart from the planned six month test by the scientists that tested the
E-Cat for Elforsk May 2013, it seems there will be another six month
test in the US.
1.
Andrea Rossi
September 4th, 2013 at 6:30 PM
<http://www.journal-of-nuclear-physics.com/?p=816&cpage=8#comment-788897>
Frank Acland:
As we said, a 6 months long validation test had to be made, and I
repeated that validation of the E-Cat is in course. As always, I
will not give any specific information regarding the validation test
in course, with exception of the fact that this test will last more
than 6 months. The results will be published after the test will
have been completed, whatever the results, positive or negative.
I do not know where the publication will be made, because it does
not depend on me. Also this long run test is being performed by an
indipendent commettee, financed by institutions totally indipendent
from us. Obviously the location in which the test is in course will
be disclosed in the publication that will be made. I can only say
that it is in the USA factory of a Customer. The E-Cats under test
have been manufactured completely in the USA, in the factory of the
US Manufacturer, indipendently from me: therefore also the
manufacturing has been made by an indipendent- from- me party.
Warm Regards,
A.R.