I didn't ask for automated controls here -- human controls are fine.

I have already said I am -1 on two concurrent issue trackers. If developers want to evaluate them, that's fine.

On 2/14/18 10:12 PM, Christopher wrote:
I don't think we have the ability to lock out non-committers from creating
new GH issues if we enable them, nor do I think it would make sense to do
so, since that's a valuable use case to consider during any trial period
before shutting off JIRA.

As for switching immediately to GH issues for non-primary repo (-website,
-examples, -docker, etc...) I think that makes sense since those are
already confusing when filed in the JIRA mixed in with the main repo's
issues.

On Wed, Feb 14, 2018 at 9:25 PM Josh Elser <els...@apache.org> wrote:

I am OK with committers ONLY using GH issues on all repos (with clear
guidance as to what the heck the project is doing) or doing a
full-switch on the other repos.

On 2/14/18 7:00 PM, Mike Miller wrote:
We could do a trial period of GitHub issues for the accumulo sub-repos
(accumulo-website, accumulo-examples...) then after a month or two decide
to switch or not.  That way we won't have duplicate issues or the
confusion
of having 2 trackers for one repository.

On Wed, Feb 14, 2018 at 6:12 PM, Mike Walch <mwa...@apache.org> wrote:

+1 I think it makes sense to try out GitHub before shutting off JIRA.
This
period could be limited to a month or two.

On Wed, Feb 14, 2018 at 5:59 PM, Christopher <ctubb...@apache.org>
wrote:

What if we had an interim transition period, tentatively using GitHub
to
determine it's suitability for our workflows, and shut off JIRA later?

On Wed, Feb 14, 2018 at 5:51 PM Josh Elser <els...@apache.org> wrote:

I disagree with Mike in that I don't find JIRA to be so painful that
it
necessitates us changing, but I wouldn't block a move to GH issues if
we
turn off our JIRA use.

On 2/14/18 4:29 PM, Mike Drob wrote:
@josh - How do you feel about move from JIRA to GH Issues completely?

On Wed, Feb 14, 2018 at 3:26 PM, Josh Elser <els...@apache.org>
wrote:

I believe I already stated -1 the last time this was brought up.

Using two issue trackers is silly.


On 2/14/18 3:30 PM, Mike Walch wrote:

I want to enable GitHub issues for Accumulo's repos. This is not to
replace
JIRA but to give contributors more options for issue tracking.
Unless
there
are objections, I will create an infra ticket this week.









Reply via email to