San Jose and most other cities in California require a building permit before
installing any charging station for a EV. Building permits are not available
if the equipment does NOT have a UL listing due to code requirements. This
is important should there be a fire as a result of a failure of some type.
Installation with out a permit can be very difficult to defend should the
house be rented or put on the market to be sold. Additionally, should a
inspector see the illegal installation of the devise during a unrelated
inspection, he is required to report his findings. IT IS NOT WORTH TAKING A
CHANCE.



--
View this message in context: 
http://electric-vehicle-discussion-list.413529.n4.nabble.com/EVLN-Comparing-JuiceBox-OpenEVSE-and-EVSEUpgrade-tp4664666p4664672.html
Sent from the Electric Vehicle Discussion List mailing list archive at 
Nabble.com.
_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
For EV drag racing discussion, please use NEDRA 
(http://groups.yahoo.com/group/NEDRA)

Reply via email to