Just out of curiosity, what is the rational behind upping the number of core sponsors for feature freeze exception to 3 if only two +2 are required to merge? In Icehouse, IIRC, two core sponsors was deemed sufficient.

Dan

On 09/02/2014 02:16 PM, Michael Still wrote:
Hi.

We're soon to hit feature freeze, as discussed in Thierry's recent
email. I'd like to outline the process for requesting a freeze
exception:

     * your code must already be up for review
     * your blueprint must have an approved spec
     * you need three (3) sponsoring cores for an exception to be granted
     * exceptions must be granted before midnight, Friday this week
(September 5) UTC
     * the exception is valid until midnight Friday next week
(September 12) UTC when all exceptions expire

For reference, our rc1 drops on approximately 25 September, so the
exception period needs to be short to maximise stabilization time.

John Garbutt and I will both be granting exceptions, to maximise our
timezone coverage. We will grant exceptions as they come in and gather
the required number of cores, although I have also carved some time
out in the nova IRC meeting this week for people to discuss specific
exception requests.

Michael



Attachment: smime.p7s
Description: S/MIME Cryptographic Signature

_______________________________________________
OpenStack-dev mailing list
OpenStack-dev@lists.openstack.org
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev

Reply via email to