Good question Bill, and to the point as usual :o)
I haven't done nearly as much as I would have liked, but I did manage to lay
about 10 feet of track and a couple of turnouts. Relative to Danny Click's
post, I'm about 12 feet of code 70 flex track away from having a complete loop
on my upper level. I also have to adjust the gauge on 5 turnouts.
As an aside, I've been mounting Caboose Industries 204S high level switch
throws. They've been giving me some trouble due to their long (.190) throw.
They bottom out in both directions stressing the throw quite a bit. I've
switched to 218S grownd throws (.165 throw) and they work perfectly. I think
this is a tribute to Tomalco's nice turnouts.
Ed Kozlowsky
Sanford, Maine
I have been skimming over the latest dead horse getting bludgeoned.. ..
What HAVE you modeled?
Thank You,
Bill Lane
[Non-text portions of this message have been removed]
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/S-Scale/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/S-Scale/join
(Yahoo! ID required)
<*> To change settings via email:
mailto:[EMAIL PROTECTED]
mailto:[EMAIL PROTECTED]
<*> To unsubscribe from this group, send an email to:
[EMAIL PROTECTED]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/