EMI Contract Position Chelmsford. MA

2003-01-15 Thread Joe Finlayson
Group, This guy mentioned it's about a 3 month job if anyone's interested. I don't know anything about this so please reference the contact info below if you are interested. Thx, Joe EMI Design consultant: Provide concise design feedback on existing product designs, including

RE: Temp chamber

2003-02-20 Thread Joe Finlayson
*** Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel: (508) 804-8212 Fax: (508) 480-0922 Email: jfinlay...@telica.com From: Dave Wilson [mailto:davewilson...@yahoo.com] Sent: Thursday, February 20, 2003 2:11 PM To: emc-p

RE: EMC-Related Functional Safety

2003-02-13 Thread Joe Finlayson
Daniel, I'm not exactly sure how that comment pertains to this discussion or any discussion on this forum. Would you please elaborate. Thx, Joe From: Daniel Forrest [mailto:daniel.forr...@at.flextronics.com] Sent: Thursday, February 13, 2003 1:21 AM To: 'Richard Hughes'; 'Stone,

NEBS Server

2003-03-25 Thread Joe Finlayson
-list. Thx, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 804-8212 Fax:(508) 480-0922 Email: jfinlay...@telica.com Web:www.telica.com This message is from the IEEE EMC

RE: D of C again

2003-04-29 Thread Joe Finlayson
the files in a central location and minimize copying. Thx, Joe * Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel: (508) 804-8212 Fax: (508) 480-0922 Email: jfinlay...@telica.com From

RE: D of C again

2003-04-29 Thread Joe Finlayson
in the EU. As I am moving forward with this position in mind, any comments would be greatly appreciated as well. Thx, Joe * Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel: (508) 804

RE: Thermocouple glue

2003-04-28 Thread Joe Finlayson
Why? From: Brian O'Connell [mailto:boconn...@t-yuden.com] Sent: Monday, April 28, 2003 12:55 PM To: emc-p...@majordomo.ieee.org Subject: RE: Thermocouple glue My use of thermal grease was discontinued several years ago by request of various agency engineers reviewing test data/technique. And

C.O. Battery Voltages - EVERYWHERE

2003-04-08 Thread Joe Finlayson
. If there are references that are country specific or carrier specific, that would be valuable information as well. Any charts/spreadsheets out there similar to the mains supply charts I've seen would be excellent. Thx, Joe * Joe Finlayson Manager, Compliance Engineering Telica

RE: Italian Homologation process

2003-04-02 Thread Joe Finlayson
, satisfy the EMCD and LVD. You need to request the test requirements from your customer and consult with your local test lab with the specifics of your product. OK, have at me. Thx, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street

RE: ESD failure

2003-05-13 Thread Joe Finlayson
Hi Ravinder, Might you have a suppression device installed that triggers above 3KV? Thx, Joe * Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel: (508) 804-8212 Fax: (508) 804

Malaysian Requirements for C.O. Equipment

2003-05-08 Thread Joe Finlayson
to the PSTN and does not provide connections to outside plant, only internal to the Central office. The more details, the better - Certification agencies, contact info, lead time, cost, etc. Thx, Joe * Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734

RE: US Central Office power source

2003-07-15 Thread Joe Finlayson
Anil, I am not aware of any CO's in North America running at -60VDC. I believe your assumption to be correct. Thx, Joe From: owner-emc-p...@majordomo.ieee.org [mailto:owner-emc-p...@majordomo.ieee.org] On Behalf Of Anil Allamaneni Sent: Tuesday, July 15, 2003 6:07 PM To:

RE: ESD - time between successive discharges

2001-08-02 Thread Joe Finlayson
Amund, My experience has been that the labs would prefer to perform the ESD tests at a rate of 1 pulse/second (pps) for the sake of efficiency. If the product passes then it was completed in the least amount of time and everyone's happy. If the product fails at 1 pps, then you are

RE: GR 1089 Intrabuilding Surges (2)

2001-03-28 Thread Joe Finlayson
It has to do with the limited protection of the carbon blocks at the point of entry. I'm not sure without looking through the docs, but I believe the carbon blocks clamp voltages above 600V or something. -Original Message- From: Martin Lindquist [mailto:mlind...@cisco.com]

RE: Air Flow Meters

2001-02-23 Thread Joe Finlayson
it to a modular plug in card, thus sealing the chassis. My goal is to measure air flow rates in each of 21 slots while the cards are installed (thus sealing the chassis for realistic air flow). Thx, Joe -Original Message- From: Joe Finlayson Sent: Friday, February 23, 2001 8:41 AM

Air Flow Meters

2001-02-23 Thread Joe Finlayson
previous place of employment that measured air flow. Any knowledge of this type of product would be greatly appreciated as well. Thx, Joe * ... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel

RE: Product Marking

2001-01-25 Thread Joe Finlayson
just went through all that work!! My apologies if I misinterpreted the intent of the original question. Thx, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480

RE: Product Marking

2001-01-24 Thread Joe Finlayson
My understanding of the NRTL marking is that if you don't mark it, it is not considered Listed. It doesn't matter if it has been tested or not. I believe the issue is that if the NRTL is performing a factory audit, they will only review marked product. Therefore, if you do not mark

RE: UL 3111-1 vs. UL 3101-1

2001-01-18 Thread Joe Finlayson
...right from UL's web site: http://ulstandardsinfonet.ul.com/scopes/311101.html -Original Message- From: Veit, Andy [mailto:andy.v...@mts.com] Sent: Wednesday, January 17, 2001 6:45 PM To: emc-p...@majordomo.ieee.org Subject: UL 3111-1 vs. UL 3101-1 Folks- Can

RE: F-Squared Labs

2001-01-10 Thread Joe Finlayson
Anyone can get a list of all email addresses on this forum by simply requesting it. I doubt that happened in this instance as I never received the solicitation. -Original Message- From: Naftali Shani [mailto:nsh...@catena.com] Sent: Wednesday, January 10, 2001 9:24 AM To: 'John

Thermocouple issues

2000-12-15 Thread Joe Finlayson
. Thx, Joe * ... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480-0922 Email: jfinlay...@telica.com Web:www.telica.com

RE: DC circuits /+60 V

2000-10-13 Thread Joe Finlayson
testing. Thx, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Foster Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480-0922 Email: jfinlay...@telica.com -Original Message- From

RE: NEBS: GR-63 Altitude Test Profile

2000-09-26 Thread Joe Finlayson
, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Foster Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480-0922 Email: jfinlay...@telica.com -Original Message- From: JIM WIESE

RE: NEBS: GR-63 Altitude Test Profile

2000-09-25 Thread Joe Finlayson
David, This particular test profile is one which I have recently tried to shed some light on as well. I am curious where you come to the conclusion that the application of the criteria for altitude references Table 4.5. The requirement (R4-8 anyway) states, All equipment shall be

Career Opportunities - delete if not interested

2000-09-20 Thread Joe Finlayson
* ... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480-0922 Email: jfinlay...@telica.com Web:www.telica.com Component Engineer Job description

RE: Equipment Rental

2000-07-10 Thread Joe Finlayson
that (same as monthly price). Good Luck, Joe Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Foster Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480-0922 Email: jfinlay...@telica.com

Temperature Meters

2000-06-22 Thread Joe Finlayson
with pro's and cons would be greatly appreciated. Could someone also explain the differences between the options of glass braid and teflon thermocouple wire. The only difference shown on the web site was the max temperature supported. Thx, Joe * ... Joe

RE: modest proposal

2000-03-29 Thread Joe Finlayson
Am I the only one receiving posts in duplicate? It seems that this has happened at least a dozen times. Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Foster Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480

RE: Sizes for Power, Control and Signal Cords/Cables/Wires

2000-03-23 Thread Joe Finlayson
I've received 4-5 with a subject but no content in the message body as well. Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Foster Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 480-0909 x212 Fax:(508) 480

Lightning Surge Equipment

2000-03-23 Thread Joe Finlayson
for equipment whose functionality is limited to this test?). Any input on used equipment would also be helpful. I am initially interested in pre-test if that makes a difference. Any input would be greatly appreciated. Thx, Joe * ... Joe Finlayson Manager

RE: Correction factor for power supply cords.

2000-03-10 Thread Joe Finlayson
into consideration during the evaluation aside from being rated for 12A minimum. If UL had a documented interpretation of this requirement, perhaps in their PAG's, I would have needed components rated minimum 15A between the wall and power supply. Joe Finlayson

RE: Static Switch

2000-03-01 Thread Joe Finlayson
home page (www.ul.com) for the announcement. snip If this is true, the job of verifying UL Listed and Recognized components, etc. would be much easier. Let's see how it turns out. Thx, Joe Joe Finlayson Manager

Enforcement of NRTL Mark on Telecom equipment

1997-04-11 Thread Joe Finlayson
My understanding is that it is a requirement in the US/Canada that any equipment intended to connect to the telephone network must have an NRTL Mark. Can anyone advise where this requirement is called out (NEC??) and how it is enforced? Thx,

RE: T1/E1 compliance requirements

2002-01-15 Thread Joe Finlayson
Bob, You'll need to comply with the Intrabuilding Lightning requirements of GR-1089. I'm not sure about the 12 mil question. Thx, Joe -Original Message- From: Bob Patel [mailto:whizpla...@yahoo.com] Sent: Tuesday, January 15, 2002 11:57 AM To: emc-p...@majordomo.ieee.org

RE: Industry Canada CS-03

2002-01-15 Thread Joe Finlayson
Jim, You may want to post this question on TREG forum if you receive minimal responses as you'll find a larger audience of telecom types to help you out. I believe the email address to post a message is t...@world.std.com. Thx, Joe -Original Message- From: Lyons, Jim

RE: Grounding architectures for COs

2002-09-10 Thread Joe Finlayson
Radojicic [mailto:marko.radoji...@mapleoptical.com] Sent: Tuesday, September 10, 2002 2:22 PM To: 'Joe Finlayson'; 'John Juhasz'; 'Dorin' Cc: 'EMC-PSTC - forum' Subject: Grounding architectures for COs Greetings, Bonding of the different system grounds is, surprisingly, a very involved topic

RE: Inrush and EN61000-3-3

2002-09-10 Thread Joe Finlayson
John Dorin, Please clarify as I am not aware of a requirement to isolate Signal Ground from Frame Ground. Please reference GR-1089-CORE, Section 9.6.2 as well. Thx, Joe -Original Message- From: John Juhasz [mailto:john.juh...@ge-interlogix.com] Sent: Tuesday, September 10,

Int'l Requirements for Lab Trials and Shipments - C.O. EQUIPMENT

2002-09-23 Thread Joe Finlayson
repost due to list server outage. -Original Message- From: Joe Finlayson Sent: Friday, September 20, 2002 1:52 PM To: 'EMC PSTC'; 'NEBS Newsgroup'; 'TREG Newsgroup' Subject: Int'l Requirements for Lab Trials and Shipments - C.O. EQUIPMENT

Int'l Requirements for Lab Trials and Shipments - C.O. EQUIPMENT

2002-09-20 Thread Joe Finlayson
* ...OLE_Obj... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 804-8212 Fax:(508) 480-0922 Email: jfinlay...@telica.com Web:www.telica.com

RE: [URGENT] Need some information about NEBS..

2002-02-15 Thread Joe Finlayson
[mailto:peter.tar...@sanmina-sci.com] Sent: Friday, February 15, 2002 11:32 AM To: emc-p...@majordomo.ieee.org Cc: Joe Finlayson; 'Peter Merguerian'; 'Tania Grant'; Michelle Cho / INT Compliance Subject: RE: [URGENT] Need some information about NEBS.. Joe - Your statement is not in all cases. Please

RE: [URGENT] Need some information about NEBS..

2002-02-15 Thread Joe Finlayson
Peter, NRTL Listing is not a requirement for CO equipment per GR-1089 although every one of our customers (CO's) requires it. You'd meet the requirements of the standards but you'd have a tough time selling it. Thx, Joe -Original Message- From: Peter Merguerian

RE: 48/60 Vdc Centralized Office Equipment

2002-10-21 Thread Joe Finlayson
, Joe -Original Message- From: Peter L. Tarver [mailto:peter.tar...@sanmina-sci.com] Sent: Monday, October 21, 2002 10:30 AM To: Joe Finlayson; EMC-PSTC (E-mail) Subject: RE: 48/60 Vdc Centralized Office Equipment Joe - When the nominal CO supply voltage is 60Vdc and batteries

RE: 48/60 Vdc Centralized Office Equipment

2002-10-17 Thread Joe Finlayson
David, I agree that one should take into account a tolerance although I am not convinced that IEC 60950 actually addresses this (clearly anyway). Please correct me if I am mistaken as I have not investigated this situation. I see section 1.4.5 addressing the determination of the

ESD Gun

2002-10-04 Thread Joe Finlayson
as the ability to set the pulse frequency to 0.5 Hz (2 pps) or less. Any leads would be appreciated. Any solicitation is encouraged to be done off line. Thx, Joe *** Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-01 Thread Joe Finlayson
Peter, As this product does not connect to the PSTN and is destined for the Central Office only, I would say the RTTE Directive does not apply as the scope does not include Network Equipment. Thx, Joe -Original Message- From: Peter Merguerian [mailto:pmerguer...@itl.co.il]

RE: subcontracted parts - compliance with EN's

2002-09-27 Thread Joe Finlayson
snip Anyway, we were only interested in CE marking (not UL/CSA) so we simply had the design reviewed and tested with our product. As for continuation, it was a custom part; so we added the compliance requirements to the part specifications. Yes, I know this doesn't give us complete control;

Philippines Certs

2002-11-12 Thread Joe Finlayson
* ...OLE_Obj... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel:(508) 804-8212 Fax:(508) 480-0922 Email: jfinlay...@telica.com Web:www.telica.com

FW: RTTE or LVD for Equipment with E1 SELV interface

2002-10-03 Thread Joe Finlayson
*** Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA 01752 Tel: (508) 804-8212 Fax: (508) 480-0922 Email: jfinlay...@telica.com -Original Message- From: Roger Magnuson [mailto:ro...@tgc.se] Sent

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-03 Thread Joe Finlayson
to ETSI TBR's although we would rather delay project until it is necessary. Thx, Joe -Original Message- From: Paul Didcott [mailto:pdidc...@ktl.com] Sent: Thursday, October 03, 2002 4:34 AM To: 'Joe Finlayson' Cc: TREG Newsgroup; 'EMC PSTC'; 'NEBS Newsgroup' Subject: RE: RTTE or LVD

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-02 Thread Joe Finlayson
Roger, Thanks for the contact. I will do just that and post the response from Mr. Bogers. Anyone want to bet a beer on this one?? ;-) Thx, Joe -Original Message- From: Roger Magnuson [mailto:ro...@tgc.se] Sent: Wednesday, October 02, 2002 2:07 PM To: Joe Finlayson

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-02 Thread Joe Finlayson
-LDC009 [mailto:dave.clem...@motorola.com] Sent: Wednesday, October 02, 2002 11:47 AM To: 'Joe Finlayson'; TREG Newsgroup; 'EMC PSTC'; 'NEBS Newsgroup' Subject: RE: RTTE or LVD for Equipment with E1 SELV interface Joe, Maybe I have missed something here but how does the TNV-X vs SELV from a safety

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-02 Thread Joe Finlayson
...@motorola.com] Sent: Wednesday, October 02, 2002 9:05 AM To: 'Joe Finlayson'; TREG Newsgroup Subject: RE: RTTE or LVD for Equipment with E1 SELV interface This whole discussion is some what of a moot point. Under the RTTE directive there are no mandatory telecom standards anyway. Dave Clement

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-02 Thread Joe Finlayson
. Thx, Joe -Original Message- From: Paul Didcott [mailto:pdidc...@ktl.com] Sent: Wednesday, October 02, 2002 3:59 AM To: 'Joe Finlayson' Cc: 'Richard Hughes'; 'EMC PSTC'; 'NEBS Newsgroup'; 'TREG Newsgroup' Subject: RE: RTTE or LVD for Equipment with E1 SELV interface Guys

RE: RTTE or LVD for Equipment with E1 SELV interface

2002-10-01 Thread Joe Finlayson
...@nortelnetworks.com] Sent: Tuesday, October 01, 2002 5:57 PM To: 'Joe Finlayson'; EMC-PSTC (E-mail) Subject: RE: RTTE or LVD for Equipment with E1 SELV interface Joe, The RTTED applies to the following types of equipment: 1) Radio equipment 2) Terminal equipment. The Directive also contains

RE: NEBS/ETSI Equivalents for PAC RIM

2002-09-06 Thread Joe Finlayson
, are certain requirements that may apply to commercial products waived if the product is only destined for the central office? Thx, Joe -Original Message- From: Berkley [mailto:berk...@attbi.com] Sent: Friday, September 06, 2002 2:15 PM To: Joe Finlayson; 'NEBS Newsgroup'; 'EMC PSTC

NEBS/ETSI Equivalents for PAC RIM

2002-09-06 Thread Joe Finlayson
China Australia/NZ Korea Any and all input, feedback, links, etc. would be greatly appreciated. Thx, Joe * ...OLE_Obj... Joe Finlayson Manager, Compliance Engineering Telica, Inc. 734 Forest Street, Bldg. G, Suite 100 Marlboro, MA