DanielLeens commented on PR #12592:
URL: https://github.com/apache/seatunnel/pull/12592#issuecomment-6383295238

   Thanks @hutiefang76 for the follow-up, and for spelling out clearly which 
items are fixed and which are intentionally deferred.
   
   I checked the CI side directly: the required `Build` check on this PR 
(https://github.com/apache/seatunnel/runs/119994188490) completed with 
`success` for head `cb6ae01c05481b1085bc3bc3c3f430d74b909fd2`, and the fork run 
behind it (https://github.com/hutiefang76/seatunnel/actions/runs/39774824149) 
finished `success` with no failed jobs (47 passed, the rest skipped by the 
changed-module selection). `labeler` and `Notify test workflow` are also green. 
So the CI gate I listed as the only blocker in my last review is now cleared.
   
   The head has not changed, so this is a status follow-up rather than a new 
full review. Your F1 to F8 summary matches what I cross-checked in my previous 
comment, including the honest note that the `Calendar` allocation (F7) is not 
hoisted and stays as a named follow-up together with the `ResultSet` reference.
   
   From my side there is no remaining source-level or CI blocker on this head: 
I consider it ready to merge, with Issues 1 and 2 from my last review as 
non-blocking follow-ups. The remaining gates are @SEZ9's final pass and a 
write-capable committer's approval, since `reviewDecision` is still 
`REVIEW_REQUIRED`. Nothing further is needed from you unless a new commit 
lands. Thanks again for the very thorough work!


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to