RE: Calibration supplier for signal generator with pulse modulation

2010-08-16 Thread emc-p...@ieee.org
I have used the same antenna calibration lab for over ten years, and they
always send me a full frequency range package of VSWR data as well as the Gain
and Antenna Factor data. I had never really thought about the usefulness of
the VSWR data until I talked with Ken a few years ago about antenna
calibrations.

 

Of course, measuring the VSWR on a typical horn antenna is complicated by
reflections inside your lab, so, if I have a question, I usually go outside to
the company parking lot and point my horn vertically into the sky. Maybe
someday the Google satellite will catch me in the act.

 

 

Ed Price

ed.pr...@cubic.com blocked::mailto:ed.pr...@cubic.com  WB6WSN

NARTE Certified EMC Engineer

Electromagnetic Compatibility Lab

Cubic Defense Applications

San Diego, CA  USA

858-505-2780

Military  Avionics EMC Is Our Specialty

 

From: Ken Javor [mailto:ken.ja...@emccompliance.com] 
Sent: Tuesday, August 17, 2010 12:37 AM
To: Derek Walton; Price, Edward
Cc: emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

For some reason, the list server is rejecting the following message I posted
in response to Ed’s:

“One answer to that for the bigger horns is to do a visual, and for the
smaller horns (all horns actually) a vswr check will suffice to indicate
whether the coax to waveguide adapter is sound.  Someone else pointed that
out, and they are correct.  I normally shy away from that sort of measurement
at microwave frequencies, because it is touchy, but it is still more accurate
than an ARP 958 or other radiated measurement.”
  
Ken Javor
Phone: (256) 650-5261





From: lfresea...@aol.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Mon, 16 Aug 2010 10:14:13 -0400
To: ken.ja...@emccompliance.com
Subject: Re: Calibration supplier for signal generator with pulse modulation


 He has a good point about adapters
 
 

From: Price, Edward ed.pr...@cubic.com
To: emc-p...@ieee.org
Sent: Mon, Aug 16, 2010 9:00 am
Subject: RE: Calibration supplier for signal generator with pulse modulation


From: emc-p...@ieee.org [mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org?
mailto:emc-p...@ieee.org?  ] On Behalf Of Ken Javor
Sent: Thursday, August 12, 2010 6:31 AM
To: Untitled
Subject: Re: Calibration supplier for signal generator with pulse modulation

And similarly, not because of MU but because of 17025 or perhaps ISO 9000,
I’ve seen test equipment that could easily have been calibrated in house,
such as current probes, LISNs and a 41 inch rod antenna have to be sent to the
calibration lab.  This is totally unproductive, except for the calibration
lab.  And I would argue further that it is detrimental to the discipline,
because if you do your own calibration, you understand better how things work.

Oh, and my favorite, the calibration of microwave horn antennas, whose
properties are entirely set by their linear dimensions. The measurement or
verification that their dimensions have not changed since their original
acquisition is so much more accurate than the direct measurement of their
gain.  In fact any passive antenna used in the EMI measurement business can be
easily checked visually for dimensional abnormalities, and those with a balun,
such as a dipole, biconical or logperiodic can be checked for vswr using a
directional coupler; no need for expensive and time consuming annual or
semi-annual trips to a calibration facility.  If it isn’t physically
damaged, and the vswr meets original specs, meaning the balun is good, the
antenna is good.
 
Ken Javor

Phone: (256) 650-5261

Ken:
 
I completely agree, except….
 
I have seen a few strange and nasty things happen with horn antennas.
1.  Many horn antennas have a coupling pin in the throat of the waveguide to
provide for coupling of the RF wave from the waveguide end of the antenna
throat to the 50-Ohm coaxial system. This “pin” is often a precision
machined and positioned extension of the center pin of a female type N coax
connector. The efficiency and VSWR of the antenna is very sensitive to the
positioning of that pin, but all is normally fine unless you do something dumb
like poke something down the throat of the antenna. But consider what happens
if you connect an improperly built coax cable to that antenna connector. In
the case where the coax cable center pin extends too far out the end of the
cable connector, you can wind up displacing the female connector center pin
(and that critical launcher pin inside the antenna).
2.  If you use that antenna for both transmit and receive, it’s possible for
high RF power (and/or very bad reflections) to create arcing at that launcher
pin. You can also soften the dielectric of the antenna connector. Both of
these will lead to changes in the antenna efficiency.
 
Sometimes, you may use a very basic horn antenna that ends with simply a
waveguide flange. Not much can

RE: Calibration supplier for signal generator with pulse modulation

2010-08-16 Thread emc-p...@ieee.org
 

From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
Sent: Thursday, August 12, 2010 6:31 AM
To: Untitled
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

And similarly, not because of MU but because of 17025 or perhaps ISO 9000, I’ve 
seen test equipment that could easily have been calibrated in house, such as 
current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

Oh, and my favorite, the calibration of microwave horn antennas, whose 
properties are entirely set by their linear dimensions. The measurement or 
verification that their dimensions have not changed since their original 
acquisition is so much more accurate than the direct measurement of their gain. 
 In fact any passive antenna used in the EMI measurement business can be easily 
checked visually for dimensional abnormalities, and those with a balun, such as 
a dipole, biconical or logperiodic can be checked for vswr using a directional 
coupler; no need for expensive and time consuming annual or semi-annual trips 
to a calibration facility.  If it isn’t physically damaged, and the vswr meets 
original specs, meaning the balun is good, the antenna is good.
 
Ken Javor

Phone: (256) 650-5261



Ken:

 

I completely agree, except….

 

I have seen a few strange and nasty things happen with horn antennas.

1.  Many horn antennas have a coupling pin in the throat of the waveguide to 
provide for coupling of the RF wave from the waveguide end of the antenna 
throat to the 50-Ohm coaxial system. This “pin” is often a precision machined 
and positioned extension of the center pin of a female type N coax connector. 
The efficiency and VSWR of the antenna is very sensitive to the positioning of 
that pin, but all is normally fine unless you do something dumb like poke 
something down the throat of the antenna. But consider what happens if you 
connect an improperly built coax cable to that antenna connector. In the case 
where the coax cable center pin extends too far out the end of the cable 
connector, you can wind up displacing the female connector center pin (and that 
critical launcher pin inside the antenna).

2.  If you use that antenna for both transmit and receive, it’s possible for 
high RF power (and/or very bad reflections) to create arcing at that launcher 
pin. You can also soften the dielectric of the antenna connector. Both of these 
will lead to changes in the antenna efficiency.

 

Sometimes, you may use a very basic horn antenna that ends with simply a 
waveguide flange. Not much can go wrong with the antenna, but almost everyone 
will use this antenna with a waveguide-to-coax adapter. Again, all the things I 
said above now apply to your adapter. I make a practice of sending my flanged 
horn antennas (at least the ones below 18 GHz) out for calibration with a 
permanently mated coax adapter mounted on them. That way, my cal data includes 
the adapter.

 

A good object lesson hit me just a few weeks ago. When I sent my 12 GHz to 18 
GHz flanged horn antenna out to my cal lab, I put a brand new female-female SMA 
adapter on the waveguide adapter (that adapter is odd; it has an SMA male coax 
connector). Later, my cal lab called me to ask how long I had been using that 
adapter. Turns out that the beautiful gold plated brand new adapter had a 
faulty center pin, and the VSWR and loss went completely wild (a bad resonance) 
at around 15 GHz.

 

Ed Price

ed.pr...@cubic.com blocked::mailto:ed.pr...@cubic.com  WB6WSN

NARTE Certified EMC Engineer

Electromagnetic Compatibility Lab

Cubic Defense Applications

San Diego, CA  USA

858-505-2780

Military  Avionics EMC Is Our Specialty

 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at 
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-13 Thread emc-p...@ieee.org
Is 20 dB acceptable to me? Absolutely not. But then I don't use MU to cover up 
my inadequacies

:-)


Low hanging fruit?  How about we start with:

EUT construction repeatability, including parts substitution in manufacturing

EUT operation conditions, and interfaces being exercised

EUT placement/configuration for anything other than a PC

Influence of support table/system

Arrangement of cables and manipulation

Testing at a distance NOT consistent with it's use

Not detecting emanations with an antenna likely to be the susceptible one in 
practice


Only testing the emissions detected with receive height of 1 to 4 metres @ 10 
metres away ignoring emissions above and below EUT

A good start there, how about we continue..

Operator, or software interpretation of where to QP

Behavior of measuring instrument to out of band, and even measuring range 
signals or spurious

Evaluation against a limit that doesn't reflect sensitivity of likely receivers

Notice nothing here is in the MU list of things in CISPR, but from experience 
almost every one of these would swamp any error accounted for from MU in CISPR 
16-4-2 or LAB 34.

Anyways, enough for now, there's a Boddingtons with my name on it...

Good night,

Derek.



From: Deniz Demirci deniz.demi...@ntscorp.com
To: lfresea...@aol.com; b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 9:17 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation


Hi Derek,
 
So,  we all are comfortable with 20 dB differences on round robins J No need to 
improve anything
Please enlighten us about the “Low hanging fruits”
 
Regards,
 
Deniz
 
From: lfresea...@aol.com [mailto:lfresea...@aol.com 
mailto:lfresea...@aol.com? ] 
Sent: Thursday, August 12, 2010 7:34 PM
To: Deniz Demirci; b...@toprudder.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation
 
Hi Deniz,

what entity is going to do something of little value unless forced to? Of 
course MU is done for auditing reasons. Very few tests require it in EMC.. 
Please do not bring up radio tests, I'm referring to EMC.

Clause 5.4.1 states...  .and, where appropriate, an estimation of the 
measurement uncertainty as well as statistical techniques for analysis of test 
and/or calibration data.

If you are ASKED to do MU outside of this it's either because your assessing 
body is over zealous, or your assessor is uneducated. You must push back and 
say NO! Failure to do this is punishing your client, and more important the 
consumer, which includes me and I'm taxed enough already! 

I wouldn't consider myself a novice in MU, or EMC testing, but I can learn. 
That said, I have yet to see a genuine advantage for MU improving measurement. 
What does calculating MU have to do with quantifying accuracy? All it does is 
put windows about what you might be measuring.

Now, here's a chance to back a stance by a fellow assessor who has campaigned 
for ( and I support his idea ) that ISO 17025 should be split into two 
documents: one for test, the other for calibration. I wholeheartedly support 
the addressing of MU in the calibration document, and there being NO mention in 
the test document. ( Dan, if your reading, these are my words not yours... )

Cheers,

Derek.
 
 

From: Deniz Demirci deniz.demi...@ntscorp.com
To: lfresea...@aol.com; b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 7:59 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation
If MU is only for audit purpose, it won’t help at all.
If you are using MU for your benefit, there are always some improvement 
opportunities in your test setup.
If you can’t quantify how inaccurate you are, how do you improve anything? 
 
quote I'm amused to read you make adjustments for your MU being larger. Keep 
in mind were kind of measuring jello.../quote
Uncertainty and measurement errors are different. Systematic error can only be 
compensated, not MU
You should not make any adjustments based on MU. It is an uncertainty not a 
correction factor (don’t get amused)
 
Plain EMC may be still measuring a jello. But more accuracy is necessary in 
“Radio” certifications. It will be really odd if your measurements are +/- 4 dB 
off for the radiated power J
MU is a nice tool if you know/want how to use it
 
OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com mailto:deniz.demi...@ntscorp.com 
web: http://www.ntscorp.com/about/locations 
http://www.ntscorp.com/about/locations 
  
 
 
From: lfresea...@aol.com mailto:lfresea...@aol.com  
[mailto:lfresea...@aol.com mailto:lfresea...@aol.com? ] 
Sent: Thursday, August 12, 2010 5:43 PM
To: Deniz Demirci; b...@toprudder.com mailto:b...@toprudder.com ; 
emc-p...@ieee.org mailto:emc-p...@ieee.org 
Subject: Re: Calibration supplier for signal generator with pulse modulation
 
Again, how do you guarantee

RE: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
Hi Derek,

 

So,  we all are comfortable with 20 dB differences on round robins J No need to 
improve anything

Please enlighten us about the “Low hanging fruits”

 

Regards,

 

Deniz

 

From: lfresea...@aol.com [mailto:lfresea...@aol.com] 
Sent: Thursday, August 12, 2010 7:34 PM
To: Deniz Demirci; b...@toprudder.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

Hi Deniz,

what entity is going to do something of little value unless forced to? Of 
course MU is done for auditing reasons. Very few tests require it in EMC.. 
Please do not bring up radio tests, I'm referring to EMC.

Clause 5.4.1 states...  .and, where appropriate, an estimation of the 
measurement uncertainty as well as statistical techniques for analysis of test 
and/or calibration data.

If you are ASKED to do MU outside of this it's either because your assessing 
body is over zealous, or your assessor is uneducated. You must push back and 
say NO! Failure to do this is punishing your client, and more important the 
consumer, which includes me and I'm taxed enough already! 

I wouldn't consider myself a novice in MU, or EMC testing, but I can learn. 
That said, I have yet to see a genuine advantage for MU improving measurement. 
What does calculating MU have to do with quantifying accuracy? All it does is 
put windows about what you might be measuring.

Now, here's a chance to back a stance by a fellow assessor who has campaigned 
for ( and I support his idea ) that ISO 17025 should be split into two 
documents: one for test, the other for calibration. I wholeheartedly support 
the addressing of MU in the calibration document, and there being NO mention in 
the test document. ( Dan, if your reading, these are my words not yours... )


Cheers,

Derek.

 

 


From: Deniz Demirci deniz.demi...@ntscorp.com
To: lfresea...@aol.com; b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 7:59 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation

If MU is only for audit purpose, it won’t help at all.

If you are using MU for your benefit, there are always some improvement 
opportunities in your test setup.

If you can’t quantify how inaccurate you are, how do you improve anything? 

 

quote I'm amused to read you make adjustments for your MU being larger. Keep 
in mind were kind of measuring jello.../quote

Uncertainty and measurement errors are different. Systematic error can only be 
compensated, not MU

You should not make any adjustments based on MU. It is an uncertainty not a 
correction factor (don’t get amused)

 

Plain EMC may be still measuring a jello. But more accuracy is necessary in 
“Radio” certifications. It will be really odd if your measurements are +/- 4 dB 
off for the radiated power J

MU is a nice tool if you know/want how to use it

 

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com mailto:deniz.demi...@ntscorp.com 
web: http://www.ntscorp.com/about/locations 
http://www.ntscorp.com/about/locations 

  

 

 

From: lfresea...@aol.com mailto:lfresea...@aol.com  
[mailto:lfresea...@aol.com mailto:lfresea...@aol.com? ] 
Sent: Thursday, August 12, 2010 5:43 PM
To: Deniz Demirci; b...@toprudder.com mailto:b...@toprudder.com ; 
emc-p...@ieee.org mailto:emc-p...@ieee.org 
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I don't see how MU helps improve any measurement. How does it? Does it make the 
instrument magically more accurate? Does VSWR magically get lower? etc etc 
etc...

No, it doesn't, nor will it ever. I'm amused to read you make adjustments for 
your MU being larger. Keep in mind were kind of measuring jello...

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories 

 

Ironically, the studies... round robins etc  that reported differences of 20 
dB and up, included acredited labs, with MU budgets... So much for that.

Quite simply, the only way for good consistent results is a good test 
technique, a competent operator, and good equipment. Please notice, MU is not 
mentioned here...

Now, just for the record, I'm not being flippant. I prefer to focus where its 
worth the effort. I keep going back to measuring some limit, which I still 
maintain is somewhat arbitrary. If you fail by a few dB, so what... In real 
life you should be held accountable for your products performance. If you get 
calls because it malfunctions, then you don't have a good design. If you never 
get a call, then it's probably fine.

We need to forget about MU and address the other low hanging fruit first...

Sincerely,

Derek Walton

 


From: Deniz Demirci deniz.demi

Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
Hi Deniz,

what entity is going to do something of little value unless forced to? Of 
course MU is done for auditing reasons. Very few tests require it in EMC.. 
Please do not bring up radio tests, I'm referring to EMC.

Clause 5.4.1 states...  .and, where appropriate, an estimation of the 
measurement uncertainty as well as statistical techniques for analysis of test 
and/or calibration data.

If you are ASKED to do MU outside of this it's either because your assessing 
body is over zealous, or your assessor is uneducated. You must push back and 
say NO! Failure to do this is punishing your client, and more important the 
consumer, which includes me and I'm taxed enough already! 

I wouldn't consider myself a novice in MU, or EMC testing, but I can learn. 
That said, I have yet to see a genuine advantage for MU improving measurement. 
What does calculating MU have to do with quantifying accuracy? All it does is 
put windows about what you might be measuring.

Now, here's a chance to back a stance by a fellow assessor who has campaigned 
for ( and I support his idea ) that ISO 17025 should be split into two 
documents: one for test, the other for calibration. I wholeheartedly support 
the addressing of MU in the calibration document, and there being NO mention in 
the test document. ( Dan, if your reading, these are my words not yours... )


Cheers,

Derek.




From: Deniz Demirci deniz.demi...@ntscorp.com
To: lfresea...@aol.com; b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 7:59 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation


If MU is only for audit purpose, it won’t help at all.
If you are using MU for your benefit, there are always some improvement 
opportunities in your test setup.
If you can’t quantify how inaccurate you are, how do you improve anything? 
 
quote I'm amused to read you make adjustments for your MU being larger. Keep 
in mind were kind of measuring jello.../quote
Uncertainty and measurement errors are different. Systematic error can only be 
compensated, not MU
You should not make any adjustments based on MU. It is an uncertainty not a 
correction factor (don’t get amused)
 
Plain EMC may be still measuring a jello. But more accuracy is necessary in 
“Radio” certifications. It will be really odd if your measurements are +/- 4 dB 
off for the radiated power J
MU is a nice tool if you know/want how to use it
 
OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com mailto:deniz.demi...@ntscorp.com 
web: http://www.ntscorp.com/about/locations 
http://www.ntscorp.com/about/locations 
  
 
 
From: lfresea...@aol.com [mailto:lfresea...@aol.com 
mailto:lfresea...@aol.com? ] 
Sent: Thursday, August 12, 2010 5:43 PM
To: Deniz Demirci; b...@toprudder.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation
 
Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I don't see how MU helps improve any measurement. How does it? Does it make the 
instrument magically more accurate? Does VSWR magically get lower? etc etc 
etc...

No, it doesn't, nor will it ever. I'm amused to read you make adjustments for 
your MU being larger. Keep in mind were kind of measuring jello...

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories 
 
Ironically, the studies... round robins etc  that reported differences of 20 
dB and up, included acredited labs, with MU budgets... So much for that.

Quite simply, the only way for good consistent results is a good test 
technique, a competent operator, and good equipment. Please notice, MU is not 
mentioned here...

Now, just for the record, I'm not being flippant. I prefer to focus where its 
worth the effort. I keep going back to measuring some limit, which I still 
maintain is somewhat arbitrary. If you fail by a few dB, so what... In real 
life you should be held accountable for your products performance. If you get 
calls because it malfunctions, then you don't have a good design. If you never 
get a call, then it's probably fine.

We need to forget about MU and address the other low hanging fruit first...

Sincerely,

Derek Walton
 

From: Deniz Demirci deniz.demi...@ntscorp.com
To: Bob Richards b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 2:51 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation
I've been performing in-house calibrations of LNA's, LISN's, CDN's, Current 
clamps and they have been accepted by the auditors. There is no restriction in 
terms of 17025 if you follow the requirements such as dedicated calibration 
instrumentation and MEASUREMENT UNCERTAINTY assessment.
I admit my MU figure for calibration is larger than a calibration

RE: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
If MU is only for audit purpose, it won’t help at all.

If you are using MU for your benefit, there are always some improvement 
opportunities in your test setup.

If you can’t quantify how inaccurate you are, how do you improve anything? 

 

quote I'm amused to read you make adjustments for your MU being larger. Keep 
in mind were kind of measuring jello.../quote

Uncertainty and measurement errors are different. Systematic error can only be 
compensated, not MU

You should not make any adjustments based on MU. It is an uncertainty not a 
correction factor (don’t get amused)

 

Plain EMC may be still measuring a jello. But more accuracy is necessary in 
“Radio” certifications. It will be really odd if your measurements are +/- 4 dB 
off for the radiated power J

MU is a nice tool if you know/want how to use it

 

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com mailto:deniz.demi...@ntscorp.com 
web: http://www.ntscorp.com/about/locations 
http://www.ntscorp.com/about/locations 

  

 

 

From: lfresea...@aol.com [mailto:lfresea...@aol.com] 
Sent: Thursday, August 12, 2010 5:43 PM
To: Deniz Demirci; b...@toprudder.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I don't see how MU helps improve any measurement. How does it? Does it make the 
instrument magically more accurate? Does VSWR magically get lower? etc etc 
etc...

No, it doesn't, nor will it ever. I'm amused to read you make adjustments for 
your MU being larger. Keep in mind were kind of measuring jello...

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories 

 

Ironically, the studies... round robins etc  that reported differences of 20 
dB and up, included acredited labs, with MU budgets... So much for that.

Quite simply, the only way for good consistent results is a good test 
technique, a competent operator, and good equipment. Please notice, MU is not 
mentioned here...

Now, just for the record, I'm not being flippant. I prefer to focus where its 
worth the effort. I keep going back to measuring some limit, which I still 
maintain is somewhat arbitrary. If you fail by a few dB, so what... In real 
life you should be held accountable for your products performance. If you get 
calls because it malfunctions, then you don't have a good design. If you never 
get a call, then it's probably fine.

We need to forget about MU and address the other low hanging fruit first...

Sincerely,

Derek Walton

 


From: Deniz Demirci deniz.demi...@ntscorp.com
To: Bob Richards b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 2:51 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation

I've been performing in-house calibrations of LNA's, LISN's, CDN's, Current 
clamps and they have been accepted by the auditors. There is no restriction in 
terms of 17025 if you follow the requirements such as dedicated calibration 
instrumentation and MEASUREMENT UNCERTAINTY assessment.
I admit my MU figure for calibration is larger than a calibration laboratory 
and it is accounted in EMC measurements.
Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations



From: emc-p...@ieee.org on behalf of Bob Richards
Sent: Thu 8/12/2010 7:51 AM
To: emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


--- On Thu, 8/12/10, Ken Javor ken.ja...@emccompliance.com wrote:


And similarly, not because of MU but because of 17025 or perhaps ISO 9000, I've 
seen test equipment that could easily have been calibrated in house, such as 
current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

 
This is a subject near to my heart. I've performed in-house calibrations of 
cables, LISNs, CDNs, current probes etc, and I agree 100% with what you said. 
Knowing the procedure helps to understand how things work and, just as 
important, gives a person the knowledge of how to perform quick verifications 
of a test setup in case there is ever any question

Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I don't see how MU helps improve any measurement. How does it? Does it make the 
instrument magically more accurate? Does VSWR magically get lower? etc etc 
etc...

No, it doesn't, nor will it ever. I'm amused to read you make adjustments for 
your MU being larger. Keep in mind were kind of measuring jello...

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories 

Ironically, the studies... round robins etc  that reported differences of 20 
dB and up, included acredited labs, with MU budgets... So much for that.

Quite simply, the only way for good consistent results is a good test 
technique, a competent operator, and good equipment. Please notice, MU is not 
mentioned here...

Now, just for the record, I'm not being flippant. I prefer to focus where its 
worth the effort. I keep going back to measuring some limit, which I still 
maintain is somewhat arbitrary. If you fail by a few dB, so what... In real 
life you should be held accountable for your products performance. If you get 
calls because it malfunctions, then you don't have a good design. If you never 
get a call, then it's probably fine.

We need to forget about MU and address the other low hanging fruit first...

Sincerely,

Derek Walton



From: Deniz Demirci deniz.demi...@ntscorp.com
To: Bob Richards b...@toprudder.com; emc-p...@ieee.org
Sent: Thu, Aug 12, 2010 2:51 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation


I've been performing in-house calibrations of LNA's, LISN's, CDN's, Current 
clamps and they have been accepted by the auditors. There is no restriction in 
terms of 17025 if you follow the requirements such as dedicated calibration 
instrumentation and MEASUREMENT UNCERTAINTY assessment.
I admit my MU figure for calibration is larger than a calibration laboratory 
and it is accounted in EMC measurements.
Again, how do you guarantee / justify what you are doing if you don't care 
about the MU.

I am strongly disagree with the “I did it and it is correct” attitude in EMC 
discipline. Maybe it explains the overall situation and measurement deviations 
between the laboratories

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations



From: emc-p...@ieee.org on behalf of Bob Richards
Sent: Thu 8/12/2010 7:51 AM
To: emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


--- On Thu, 8/12/10, Ken Javor ken.ja...@emccompliance.com wrote:


And similarly, not because of MU but because of 17025 or perhaps ISO 9000, I've 
seen test equipment that could easily have been calibrated in house, such as 
current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

 
This is a subject near to my heart. I've performed in-house calibrations of 
cables, LISNs, CDNs, current probes etc, and I agree 100% with what you said. 
Knowing the procedure helps to understand how things work and, just as 
important, gives a person the knowledge of how to perform quick verifications 
of a test setup in case there is ever any question as to the proper operation 
of that equipment.
 
Every so often, a conversation comes up in the lab about whether we should do 
in-house calibrations. The issue is never about MU, cost or validity of data, 
it usually hinges around 17025 and what auditors will say.
 
IMHO, shipping LISNs and/or CDNs to have calibrations performed by a cal lab is 
less reliable than in-house calibrations. This has little to do with the cal 
lab's ability, but from the possibility of damage during shipping. I've had 
CDNs come back with stuff rattling around inside (possibly chips off of 
ferrites?). If I can't perform an impedance verification in house, then what 
should I do to insure it is not damaged - send it back to the cal lab?
 
Bob R.
 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy

RE: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
I've been performing in-house calibrations of LNA's, LISN's, CDN's, Current
clamps and they have been accepted by the auditors. There is no restriction in
terms of 17025 if you follow the requirements such as dedicated calibration
instrumentation and MEASUREMENT UNCERTAINTY assessment.
I admit my MU figure for calibration is larger than a calibration laboratory
and it is accounted in EMC measurements.
Again, how do you guarantee / justify what you are doing if you don't care
about the MU.

I am strongly disagree with the “I did it and it is correct” attitude in EMC
discipline. Maybe it explains the overall situation and measurement deviations
between the laboratories

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations



From: emc-p...@ieee.org on behalf of Bob Richards
Sent: Thu 8/12/2010 7:51 AM
To: emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


--- On Thu, 8/12/10, Ken Javor ken.ja...@emccompliance.com wrote:


And similarly, not because of MU but because of 17025 or perhaps ISO 9000,
I've seen test equipment that could easily have been calibrated in house, such
as current probes, LISNs and a 41 inch rod antenna have to be sent to the
calibration lab.  This is totally unproductive, except for the calibration
lab.  And I would argue further that it is detrimental to the discipline,
because if you do your own calibration, you understand better how things work.

 
This is a subject near to my heart. I've performed in-house calibrations of
cables, LISNs, CDNs, current probes etc, and I agree 100% with what you said.
Knowing the procedure helps to understand how things work and, just as
important, gives a person the knowledge of how to perform quick verifications
of a test setup in case there is ever any question as to the proper operation
of that equipment.
 
Every so often, a conversation comes up in the lab about whether we should do
in-house calibrations. The issue is never about MU, cost or validity of data,
it usually hinges around 17025 and what auditors will say.
 
IMHO, shipping LISNs and/or CDNs to have calibrations performed by a cal lab
is less reliable than in-house calibrations. This has little to do with the
cal lab's ability, but from the possibility of damage during shipping. I've
had CDNs come back with stuff rattling around inside (possibly chips off of
ferrites?). If I can't perform an impedance verification in house, then what
should I do to insure it is not damaged - send it back to the cal lab?
 
Bob R.
 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com



-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org

--- On Thu, 8/12/10, Ken Javor ken.ja...@emccompliance.com wrote:


And similarly, not because of MU but because of 17025 or perhaps ISO 
9000, I’ve seen test equipment that could easily have been calibrated in house, 
such as current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

 

This is a subject near to my heart. I've performed in-house calibrations of 
cables, LISNs, CDNs, current probes etc, and I agree 100% with what you said. 
Knowing the procedure helps to understand how things work and, just as 
important, gives a person the knowledge of how to perform quick verifications 
of a test setup in case there is ever any question as to the proper operation 
of that equipment.
 
Every so often, a conversation comes up in the lab about whether we should do 
in-house calibrations. The issue is never about MU, cost or validity of data, 
it usually hinges around 17025 and what auditors will say. 
 
IMHO, shipping LISNs and/or CDNs to have calibrations performed by a cal lab is 
less reliable than in-house calibrations. This has little to do with the cal 
lab's ability, but from the possibility of damage during shipping. I've had 
CDNs come back with stuff rattling around inside (possibly chips off of 
ferrites?). If I can't perform an impedance verification in house, then what 
should I do to insure it is not damaged - send it back to the cal lab?
 
Bob R.
 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at 
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
Well said Ken.  A check of VSWR to check that the antenna's not been damaged 
(including horn antennas I guess) should be good enough to check for any 
overstress or mechanical damage (I have come across loose screws in bicon 
antennas).  If it hasn't changed, then the antenna factor hasn't changed.
 
In fact, if this was allowed as a calibration - I'm sure it would get done more 
often than the off-site calibration.
 
Luke Turnbull

 On 12/08/2010 at 14:30, in message 
 c88961b2.8480c%ken.ja...@emccompliance.com, Ken Javor 
 ken.ja...@emccompliance.com wrote:

And similarly, not because of MU but because of 17025 or perhaps ISO 9000, I’ve 
seen test equipment that could easily have been calibrated in house, such as 
current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

Oh, and my favorite, the calibration of microwave horn antennas, whose 
properties are entirely set by their linear dimensions. The measurement or 
verification that their dimensions have not changed since their original 
acquisition is so much more accurate than the direct measurement of their gain. 
 In fact any passive antenna used in the EMI measurement business can be easily 
checked visually for dimensional abnormalities, and those with a balun, such as 
a dipole, biconical or logperiodic can be checked for vswr using a directional 
coupler; no need for expensive and time consuming annual or semi-annual trips 
to a calibration facility.  If it isn’t physically damaged, and the vswr meets 
original specs, meaning the balun is good, the antenna is good.
 
Ken Javor

Phone: (256) 650-5261





From: Cortland Richmond k...@earthlink.net
Reply-To: k...@earthlink.net
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Thu, 12 Aug 2010 07:24:17 -0400
To: emc-pstc emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

A tangential issue: those who rely on that algorithmic process often don't know 
why certain things are required and  others left unsaid.  I've see a manager 
forbid using a high-pass filter during CE testing because it appeared nowhere 
in a standard's setup drawings. Demonstration was required!
 
 
Cortland
KA5S
 
 


- Original Message - 
From: Ken Javor mailto:ken.ja...@emccompliance.com 
mailto:ken.ja...@emccompliance.com   
To: Untitled mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org  
Sent: 8/11/2010 1:04:51 PM 
Subject: Re: Calibration supplier for signal generator with pulse 
modulation

Bingo.  Clearly another driver for inserting MU where it doesn't belong 
is a desire to replace the need for competent personnel with an algorithmic 
process that works for any personnel.  But the same personnel who don‚t know 
how to properly perform the test will also not know how to run the algorithm. 
Hence Mr. Walton‚s observations on how poorly MU is executed in reality.
 
Ken Javor

Phone: (256) 650-5261





From: Dennis Ward dw...@atcb.com
Reply-To: dw...@atcb.com
Date: Wed, 11 Aug 2010 09:50:21 -0700
To: lfresea...@aol.com, deniz.demi...@ntscorp.com, 
emc-p...@ieee.org
Subject: RE: Calibration supplier for signal generator with pulse 
modulation

I think I would only add that while measurement uncertainties for EMC 
is nebulous at best, at the same time we do not want to get into the habit of a 
slam dunk mentality of Œoh, just a number, it doesn‚t matter.‰  
 
That is why Derek‚s statement of „What‚s really needed is a competent 
individual with adequate equipment‰ is so important.  Where electromagnetic 
compatibility is concerned, competence of the engineers doing the measurement 
is probably much more importa! nt than uncertainties. I know that one of the 
biggest benefits to testing in the radio approvals industry is competence of 
test personnel.
 
Compliance does matter and the best way to keep unneeded uncertainties 
out of the EMC measurement industry, is to keep competence of test personnel in.



 
Dennis Ward 
Director of Engineering
American TCB 
Certification Resource for the Wireless Industry www.atcb.com 
http://www.atcb.com/ http://www.atcb.com/  
703-847-4700 fax 703-847-6888 
direct - 703-880-4841 




 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings

Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
And similarly, not because of MU but because of 17025 or perhaps ISO 9000, I’ve 
seen test equipment that could easily have been calibrated in house, such as 
current probes, LISNs and a 41 inch rod antenna have to be sent to the 
calibration lab.  This is totally unproductive, except for the calibration lab. 
 And I would argue further that it is detrimental to the discipline, because if 
you do your own calibration, you understand better how things work.

Oh, and my favorite, the calibration of microwave horn antennas, whose 
properties are entirely set by their linear dimensions. The measurement or 
verification that their dimensions have not changed since their original 
acquisition is so much more accurate than the direct measurement of their gain. 
 In fact any passive antenna used in the EMI measurement business can be easily 
checked visually for dimensional abnormalities, and those with a balun, such as 
a dipole, biconical or logperiodic can be checked for vswr using a directional 
coupler; no need for expensive and time consuming annual or semi-annual trips 
to a calibration facility.  If it isn’t physically damaged, and the vswr meets 
original specs, meaning the balun is good, the antenna is good.
 
Ken Javor

Phone: (256) 650-5261





From: Cortland Richmond k...@earthlink.net
Reply-To: k...@earthlink.net
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Thu, 12 Aug 2010 07:24:17 -0400
To: emc-pstc emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

A tangential issue: those who rely on that algorithmic process often don't know 
why certain things are required and  others left unsaid.  I've see a manager 
forbid using a high-pass filter during CE testing because it appeared nowhere 
in a standard's setup drawings. Demonstration was required!
 
 
Cortland
KA5S
 
 


- Original Message - 
From: Ken Javor mailto:ken.ja...@emccompliance.com 
mailto:ken.ja...@emccompliance.com   
To: Untitled mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org  
Sent: 8/11/2010 1:04:51 PM 
Subject: Re: Calibration supplier for signal generator with pulse 
modulation

Bingo.  Clearly another driver for inserting MU where it doesn't belong 
is a desire to replace the need for competent personnel with an algorithmic 
process that works for any personnel.  But the same personnel who don‚t know 
how to properly perform the test will also not know how to run the algorithm. 
Hence Mr. Walton‚s observations on how poorly MU is executed in reality.
 
Ken Javor

Phone: (256) 650-5261





From: Dennis Ward dw...@atcb.com
Reply-To: dw...@atcb.com
Date: Wed, 11 Aug 2010 09:50:21 -0700
To: lfresea...@aol.com, deniz.demi...@ntscorp.com, 
emc-p...@ieee.org
Subject: RE: Calibration supplier for signal generator with pulse 
modulation

I think I would only add that while measurement uncertainties for EMC 
is nebulous at best, at the same time we do not want to get into the habit of a 
slam dunk mentality of Œoh, just a number, it doesn‚t matter.‰  
 
That is why Derek‚s statement of „What‚s really needed is a competent 
individual with adequate equipment‰ is so important.  Where electromagnetic 
compatibility is concerned, competence of the engineers doing the measurement 
is probably much more importa! nt than uncertainties. I know that one of the 
biggest benefits to testing in the radio approvals industry is competence of 
test personnel.
 
Compliance does matter and the best way to keep unneeded uncertainties 
out of the EMC measurement industry, is to keep competence of test personnel in.



 
Dennis Ward 
Director of Engineering
American TCB 
Certification Resource for the Wireless Industry www.atcb.com 
http://www.atcb.com/ http://www.atcb.com/  
703-847-4700 fax 703-847-6888 
direct - 703-880-4841 




 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at 
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher  j.bac...@ieee.org
David Heald dhe...@gmail.com 


-

This message is from

Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
A tangential issue: those who rely on that algorithmic process often don't
know why certain things are required and  others left unsaid.  I've see a
manager forbid using a high-pass filter during CE testing because it appeared
nowhere in a standard's setup drawings. Demonstration was required!
 
 
Cortland
KA5S
 
 

- Original Message - 
From: Ken Javor mailto:ken.ja...@emccompliance.com  
To: Untitled mailto:emc-p...@ieee.org 
Sent: 8/11/2010 1:04:51 PM 
Subject: Re: Calibration supplier for signal generator with pulse 
modulation

Bingo.  Clearly another driver for inserting MU where it doesn't belong 
is a
desire to replace the need for competent personnel with an algorithmic process
that works for any personnel.  But the same personnel who don’t know how to
properly perform the test will also not know how to run the algorithm. Hence
Mr. Walton’s observations on how poorly MU is executed in reality.
 
Ken Javor

Phone: (256) 650-5261





From: Dennis Ward dw...@atcb.com
Reply-To: dw...@atcb.com
Date: Wed, 11 Aug 2010 09:50:21 -0700
To: lfresea...@aol.com, deniz.demi...@ntscorp.com, 
emc-p...@ieee.org
Subject: RE: Calibration supplier for signal generator with pulse 
modulation

I think I would only add that while measurement uncertainties for EMC is
nebulous at best, at the same time we do not want to get into the habit of a
slam dunk mentality of ‘oh, just a number, it doesn’t matter.”  
 
That is why Derek’s statement of “What’s really needed is a competent
individual with adequate equipment” is so important.  Where electromagnetic
compatibility is concerned, competence of the engineers doing the measurement
is probably much more importa! nt than uncertainties. I know that one of the
biggest benefits to testing in the radio approvals industry is competence of
test personnel.
 
Compliance does matter and the best way to keep unneeded uncertainties 
out of
the EMC measurement industry, is to keep competence of test personnel in.



 
Dennis Ward 
Director of Engineering
American TCB 
Certification Resource for the Wireless Industry www.atcb.com
http://www.atcb.com/ http://www.atcb.com/  
703-847-4700 fax 703-847-6888 
direct - 703-880-4841 



 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-12 Thread emc-p...@ieee.org
And of course note that for radiated measurements there is no control on
room accuracy effects outside of minimum room dimensions, and minimum
absorber coverage and minimum absorber attenuation (as specified by
manufacturer, not as measured installed).

HOWEVER, also note that EMI qualification in the military, aerospace and
automotive world is not the proof of the pudding. In all these areas, the
final product (integrated platform) is checked for electromagnetic
compatibility, i.e., it undergoes an EMC test.  A military EMC test often
includes a spectrum analyzer survey of the noise coupled into platform
antennas at frequencies where subsystems failed radiated emission
requirements.  That test is the ultimate high accuracy EMC test: it checks
the potential for rfi in precisely the configuration the integrated system
will be used.  The spectrum analyzer survey and the larger EMC test are the
proof of the pudding.

Note the difference between EMI qualification testing which is quantitative
in nature, and EMC testing which is part qualitative and part quantitative
(spectrum analyzer survey).  In any case, people in the military, aerospace
and automotive businesses know the difference between EMI and EMC testing.
The distinction seems to be lost on the commercial world, where an EMI
qualification test is almost always refereed to as an EMC test.
 
Ken Javor

Phone: (256) 650-5261


 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 22:02:17 -0400
 To: emc-pstc emc-p...@ieee.org
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 MIL-STD 461E does not usually ask we be particularly accurate, merely
 sufficient.
 
 QUOTE
 4.3.1 Measurement tolerances.
 Unless otherwise stated for a particular measurement, the tolerance shall
 be as follows:
 a. Distance: ±5%
 b. Frequency: ±2%
 c. Amplitude, measurement receiver: ±2 dB
 d. Amplitude, measurement system (includes measurement receivers,
 transducers, cables,
 and so forth): ±3 dB
 e. Time (waveforms): ±5%
 f. Resistors: ±5%
 e. Capacitors: ±20%
 END QUOTE
 
 Also note:
 QUOTE
 4.3.10.4.2  Modulation of susceptibility signals.
 Susceptibility test signals for CS114 and RS103 shall be pulse modulated
 (on/off ratio of 40 dB
 minimum) at a 1 kHz rate with a 50% duty cycle.
 END QUOTE
 
 On the civilian side, some years ago I was at a test lab I won't identify,
 and asked if we really had 80 percent modulation.  Sure, we did; there was
 one volt of audio going into the SG external moduation jack and the
 generator was set for 80 percent.  After a little griping they let me look
 on the SA. THEN they hauled out the 'scope. They were into both positive
 and negative peak clipping.  Some things you HAVE to check.
 
 (PS: We still didn't pass.)
 
 Cortland
 KA5S
 
 
 
 
 [Original Message]
 From: Ken Javor ken.ja...@emccompliance.com
 To: Untitled emc-p...@ieee.org
 Date: 8/11/2010 1:03:09 PM
 Subject: Re: Calibration supplier for signal generator with pulse
 modulation
 
 This gets back to Mr. Walton's differentiation between EMI testing and
 calibration laboratories.
 
 Clearly modulation, measured with an o'scope, can be measured to the
 tolerances available from the o'scope.  That's plenty good enough. It
 strains credulity that there is one brand of scope that would give
 sloppier
 results making it easier to pass a test.
 
 The essence of what Mr. Walton and I are saying is well-expressed by the
 rules for using significant digits: You don't get four digit accuracy as
 the
 result of computations using two digit accuracy inputs.
 
 EMI limits are quite arbitrary; trying to meet them with accuracy
 exceeding
 the limit placement process is unnecessary.  As stated earlier, the only
 reason for MU control is on the basic facility chambers/OATS so that there
 is some repeatability from facility to facility, and so that it isn't
 easier
 to pass at one facility than another.
 
 Anything beyond that is superfluous and an unnecessary expense.
 
 Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
 system integrity check does indeed check that the cable is properly
 accounted for in terms of attenuation. Mr. Demirci is correct that the
 signal generator can be expected to be a better match to the cable than is
 the actual antenna used.  However, to the limits of accuracy required for
 EMI testing, the antenna factor calibration takes care of the mismatch
 between antenna and cable, since the antenna is calibrated in a 50 Ohm
 system (albeit likely using pads between antenna and cable for
 calibration).
 If further accuracy is desired, most manufacturers provide vswr
 characteristics for their antennas.
 
 Fear isn't the issue.  The issue is a misapplication of a process where it
 isn't required, and the patina of precision and accuracy this dishonestly
 bestows on an inherently inaccurate and imprecise discipline.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Deniz

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
The MIL-STD-461 requirement to show 1% resolution is usually interpreted to
apply to outage conditions only. If you had a plot from dc to daylight that
was under the limit, it could be plotted on 8.5 x 11 paper (or electronic
equivalent) and that would work just fine.  Even if there outages present,
if they were listed numerically on another page with sufficient resolution,
that would work as well.
 
Ken Javor

Phone: (256) 650-5261


 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 22:15:00 -0400
 To: Sundstrom, Michael michael_sundst...@overheaddoor.com, emc-pstc
 emc-p...@ieee.org
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 I don't have the manual here at home, but a standard I DL'd I at work --
 and I had to hunt for it  -- asks (should) equipment be calibrated with a
 signal of four times the accuracy specified for the device in question.  If
 that accuracy is unattainable, it requires justification be added and a
 note in the calibration documents be added regarding the accuracy the
 calibrated test equipment is good for, regardless of its specifications.
 
 Given MIL-STD-461's generous accuracy requirements, that can't be hard to
 live with.
 
 (What I wonder about are requirements one be able to read 1% on a printed
 plot!)
 
 
 Cortland
 KA5S 
 
 [Original Message]
 From: Sundstrom, Michael michael_sundst...@overheaddoor.com
 To: Ken Javor ken.ja...@emccompliance.com; EMC-PSTC@LISTSERV.IEEE.ORG
 EMC-PSTC@LISTSERV.IEEE.ORG
 Date: 8/11/2010 1:25:38 PM
 Subject: RE: Calibration supplier for signal generator with pulse
 modulation
 
 Ken / Deniz,
 Speaking of significant digit's: I'm still looking for that EMI receiver
 that will measure to 1/100 of a dB. So I can report to a 1/10 of a dB in
 reports like I'm asked to.
 
 
 
 Michael Sundstrom
 OHD / TREQ Dallas
 Electronic Lab Analist, EMC Lead
 2170 French Settelment Rd, Suite B
 Dallas, Texas  75212
 (214) 579 6312
 
 
 -Original Message-
 From: Ken Javor [mailto:ken.ja...@emccompliance.com]
 Sent: Wednesday, August 11, 2010 11:59 AM
 To: EMC-PSTC@LISTSERV.IEEE.ORG
 Subject: Re: [PSES] Calibration supplier for signal generator with pulse
 modulation
 
 This gets back to Mr. Walton's differentiation between EMI testing and
 calibration laboratories.
 
 Clearly modulation, measured with an o'scope, can be measured to the
 tolerances available from the o'scope.  That's plenty good enough. It
 strains credulity that there is one brand of scope that would give
 sloppier
 results making it easier to pass a test.
 
 The essence of what Mr. Walton and I are saying is well-expressed by the
 rules for using significant digits: You don't get four digit accuracy as
 the
 result of computations using two digit accuracy inputs.
 
 EMI limits are quite arbitrary; trying to meet them with accuracy
 exceeding
 the limit placement process is unnecessary.  As stated earlier, the only
 reason for MU control is on the basic facility chambers/OATS so that there
 is some repeatability from facility to facility, and so that it isn't
 easier
 to pass at one facility than another.
 
 Anything beyond that is superfluous and an unnecessary expense.
 
 Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
 system integrity check does indeed check that the cable is properly
 accounted for in terms of attenuation. Mr. Demirci is correct that the
 signal generator can be expected to be a better match to the cable than is
 the actual antenna used.  However, to the limits of accuracy required for
 EMI testing, the antenna factor calibration takes care of the mismatch
 between antenna and cable, since the antenna is calibrated in a 50 Ohm
 system (albeit likely using pads between antenna and cable for
 calibration).
 If further accuracy is desired, most manufacturers provide vswr
 characteristics for their antennas.
 
 Fear isn't the issue.  The issue is a misapplication of a process where it
 isn't required, and the patina of precision and accuracy this dishonestly
 bestows on an inherently inaccurate and imprecise discipline.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Wed, 11 Aug 2010 08:35:06 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse
 modulation
 Subject: RE: Calibration supplier for signal generator with pulse
 modulation
 
 Could you define how precise?
 
 What is your acceptance criteria for the modulation dept?
 Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
 between 60 % to 90 % is good enough.
 There is more than a dB peak difference in the signal for 60 % AM and 80
 % AM modulations. You won't realize the difference with a field probe in
 radiated immunity tests with modulated signal. (Simple  math;
 20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me
 
 Another case;
 If you are using 6 meter cable

RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
I don't have the manual here at home, but a standard I DL'd I at work --
and I had to hunt for it  -- asks (should) equipment be calibrated with a
signal of four times the accuracy specified for the device in question.  If
that accuracy is unattainable, it requires justification be added and a
note in the calibration documents be added regarding the accuracy the
calibrated test equipment is good for, regardless of its specifications.

Given MIL-STD-461's generous accuracy requirements, that can't be hard to
live with.

(What I wonder about are requirements one be able to read 1% on a printed
plot!)


Cortland
KA5S 

 [Original Message]
 From: Sundstrom, Michael michael_sundst...@overheaddoor.com
 To: Ken Javor ken.ja...@emccompliance.com; EMC-PSTC@LISTSERV.IEEE.ORG
EMC-PSTC@LISTSERV.IEEE.ORG
 Date: 8/11/2010 1:25:38 PM
 Subject: RE: Calibration supplier for signal generator with pulse
modulation

 Ken / Deniz,
 Speaking of significant digit's: I'm still looking for that EMI receiver
that will measure to 1/100 of a dB. So I can report to a 1/10 of a dB in
reports like I'm asked to.



 Michael Sundstrom
 OHD / TREQ Dallas
 Electronic Lab Analist, EMC Lead
 2170 French Settelment Rd, Suite B
 Dallas, Texas  75212
 (214) 579 6312


 -Original Message-
 From: Ken Javor [mailto:ken.ja...@emccompliance.com] 
 Sent: Wednesday, August 11, 2010 11:59 AM
 To: EMC-PSTC@LISTSERV.IEEE.ORG
 Subject: Re: [PSES] Calibration supplier for signal generator with pulse
modulation

 This gets back to Mr. Walton's differentiation between EMI testing and
 calibration laboratories.

 Clearly modulation, measured with an o'scope, can be measured to the
 tolerances available from the o'scope.  That's plenty good enough. It
 strains credulity that there is one brand of scope that would give
sloppier
 results making it easier to pass a test.

 The essence of what Mr. Walton and I are saying is well-expressed by the
 rules for using significant digits: You don't get four digit accuracy as
the
 result of computations using two digit accuracy inputs.

 EMI limits are quite arbitrary; trying to meet them with accuracy
exceeding
 the limit placement process is unnecessary.  As stated earlier, the only
 reason for MU control is on the basic facility chambers/OATS so that there
 is some repeatability from facility to facility, and so that it isn't
easier
 to pass at one facility than another.

 Anything beyond that is superfluous and an unnecessary expense.

 Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
 system integrity check does indeed check that the cable is properly
 accounted for in terms of attenuation. Mr. Demirci is correct that the
 signal generator can be expected to be a better match to the cable than is
 the actual antenna used.  However, to the limits of accuracy required for
 EMI testing, the antenna factor calibration takes care of the mismatch
 between antenna and cable, since the antenna is calibrated in a 50 Ohm
 system (albeit likely using pads between antenna and cable for
calibration).
 If further accuracy is desired, most manufacturers provide vswr
 characteristics for their antennas.

 Fear isn't the issue.  The issue is a misapplication of a process where it
 isn't required, and the patina of precision and accuracy this dishonestly
 bestows on an inherently inaccurate and imprecise discipline.
  
 Ken Javor

 Phone: (256) 650-5261


  From: Deniz Demirci deniz.demi...@ntscorp.com
  Date: Wed, 11 Aug 2010 08:35:06 -0700
  To: Untitled emc-p...@ieee.org
  Conversation: Calibration supplier for signal generator with pulse
modulation
  Subject: RE: Calibration supplier for signal generator with pulse
modulation
  
  Could you define how precise?
  
  What is your acceptance criteria for the modulation dept?
  Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
  between 60 % to 90 % is good enough.
  There is more than a dB peak difference in the signal for 60 % AM and 80
  % AM modulations. You won't realize the difference with a field probe in
  radiated immunity tests with modulated signal. (Simple  math;
  20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me
  
  Another case;
  If you are using 6 meter cable for radiated emission at 10 GHz, your
  cable characterization uncertainty is more than 1.5 dB even with a quite
  high grade cable (Experimental measurements). Check the cable vswr
  figures in their specs measured in ideal conditions. Even a simple cable
  is a significant uncertainty contributor.
  Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site
  imperfection is another story. Those figures are not accounted for in
  the MIL-STD-461 RE102 verification. Everything seems to be very good
  when you terminate the measurement cable with a signal generator (50
  ohm) output.  I don't agree with this quote an ultimate
  proof-of-the-pudding, /quote
  
  You can use all your engineering skills for the tests but you have

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
MIL-STD 461E does not usually ask we be particularly accurate, merely
sufficient.

QUOTE
4.3.1 Measurement tolerances.
Unless otherwise stated for a particular measurement, the tolerance shall
be as follows:
a. Distance: 15%
b. Frequency: 12%
c. Amplitude, measurement receiver: 12 dB
d. Amplitude, measurement system (includes measurement receivers,
transducers, cables,
and so forth): 13 dB
e. Time (waveforms): 15%
f. Resistors: 15%
e. Capacitors: 120%
END QUOTE

Also note:
QUOTE
4.3.10.4.2  Modulation of susceptibility signals.
Susceptibility test signals for CS114 and RS103 shall be pulse modulated
(on/off ratio of 40 dB
minimum) at a 1 kHz rate with a 50% duty cycle.
END QUOTE

On the civilian side, some years ago I was at a test lab I won't identify,
and asked if we really had 80 percent modulation.  Sure, we did; there was
one volt of audio going into the SG external moduation jack and the
generator was set for 80 percent.  After a little griping they let me look
on the SA. THEN they hauled out the 'scope. They were into both positive
and negative peak clipping.  Some things you HAVE to check.  

(PS: We still didn't pass.)

Cortland
KA5S




 [Original Message]
 From: Ken Javor ken.ja...@emccompliance.com
 To: Untitled emc-p...@ieee.org
 Date: 8/11/2010 1:03:09 PM
 Subject: Re: Calibration supplier for signal generator with pulse
modulation

 This gets back to Mr. Walton's differentiation between EMI testing and
 calibration laboratories.

 Clearly modulation, measured with an o'scope, can be measured to the
 tolerances available from the o'scope.  That's plenty good enough. It
 strains credulity that there is one brand of scope that would give
sloppier
 results making it easier to pass a test.

 The essence of what Mr. Walton and I are saying is well-expressed by the
 rules for using significant digits: You don't get four digit accuracy as
the
 result of computations using two digit accuracy inputs.

 EMI limits are quite arbitrary; trying to meet them with accuracy
exceeding
 the limit placement process is unnecessary.  As stated earlier, the only
 reason for MU control is on the basic facility chambers/OATS so that there
 is some repeatability from facility to facility, and so that it isn't
easier
 to pass at one facility than another.

 Anything beyond that is superfluous and an unnecessary expense.

 Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
 system integrity check does indeed check that the cable is properly
 accounted for in terms of attenuation. Mr. Demirci is correct that the
 signal generator can be expected to be a better match to the cable than is
 the actual antenna used.  However, to the limits of accuracy required for
 EMI testing, the antenna factor calibration takes care of the mismatch
 between antenna and cable, since the antenna is calibrated in a 50 Ohm
 system (albeit likely using pads between antenna and cable for
calibration).
 If further accuracy is desired, most manufacturers provide vswr
 characteristics for their antennas.

 Fear isn't the issue.  The issue is a misapplication of a process where it
 isn't required, and the patina of precision and accuracy this dishonestly
 bestows on an inherently inaccurate and imprecise discipline.
  
 Ken Javor

 Phone: (256) 650-5261


  From: Deniz Demirci deniz.demi...@ntscorp.com
  Date: Wed, 11 Aug 2010 08:35:06 -0700
  To: Untitled emc-p...@ieee.org
  Conversation: Calibration supplier for signal generator with pulse
modulation
  Subject: RE: Calibration supplier for signal generator with pulse
modulation
  
  Could you define how precise?
  
  What is your acceptance criteria for the modulation dept?
  Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
  between 60 % to 90 % is good enough.
  There is more than a dB peak difference in the signal for 60 % AM and 80
  % AM modulations. You won't realize the difference with a field probe in
  radiated immunity tests with modulated signal. (Simple  math;
  20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me
  
  Another case;
  If you are using 6 meter cable for radiated emission at 10 GHz, your
  cable characterization uncertainty is more than 1.5 dB even with a quite
  high grade cable (Experimental measurements). Check the cable vswr
  figures in their specs measured in ideal conditions. Even a simple cable
  is a significant uncertainty contributor.
  Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site
  imperfection is another story. Those figures are not accounted for in
  the MIL-STD-461 RE102 verification. Everything seems to be very good
  when you terminate the measurement cable with a signal generator (50
  ohm) output.  I don't agree with this quote an ultimate
  proof-of-the-pudding, /quote
  
  You can use all your engineering skills for the tests but you have to
  quantify your risk using type B measurement uncertainty analysis and do
  the Type A if you can afford to see where you stand

RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
The one and only reason why EMI is “ not precise”, or “uncertain” is
exactly one

piece of equipment in the measurement chain….

 

The EUT and it’s physical set-up.

 

*All* other aspects can very well and relatively easy be controlled under a MU
system,

allowing customers to compare quality and performance of different labs and

and judge and compare the quality of measurement alternatives.

 

 

Defining a MU figure also implies that a round robin test using a well defined
EUT will get identical results

everywhere +/- the margin defined by the labs uncertainty figure.

 

It also makes it possible by accurately reproducing a real EUT setup in
another lab

to get comparable results.

 

I agree that this round robin test is not the definition of daily EMI work.

In real life you WILL have an undefined EUT with as many degrees of freedom 

of operation and setup as you can recognize, resulting in an uncertainty well
beyond the MU figures 

this discussion is about.

But that is no reason to neglect the accuracy specifications of the defined
chain.

 

There is also an additional skill required in EMI work, that is finding and
characterizing

cause of emissions or lack of immunity. Often a lack of EMC is caused by a
loophole

in the design, and a simple fix may virtually make the emissions disappear to
such

a degree that discussions about a few dB seem ridiculous.  That is real
engineering

work and should not be confused with the art of measuring for which MU is
meant.

 

In Europe the EMC requirements (read limits) in the standards have been 

raised to an importance level  (not by the European Commission but by the
market stakeholders

united in CENELEC/ISO/IEC) where an excess of 0.1 dB can make the difference 

between pass/fail and market-access or no-market-access. Hence a decision of

enormous economic value. Lab shopping has been a popular method to gain access
for equipment

that marginally failed. An unwanted situation that disturbs a level playing
field.

That is why the EMC labs have been brought under the regime of ISO 17025

(also a market driven standard) and metrology entered the labs to 

force them to create reproducible measurements .

 Metrology  assessors never saw an EUT and do not understand the EMI
measurement chain.

And if you are used to calibrate VOLTS and meters (SI ), the V/m

do not seem so very different. So they imposed their methods upon us.

 

And for each of the parts they recognized, they imposed us to make a MU.

How right they were and how wrong they are.

But one part cannot be subject to metrology methods:  the  EUT.

(never available when an audit is made)

 

But that does not imply that you cannot gain in quality and performance

by applying a relatively simple procedure to the inaccuracy figures

your equipment providers supply you with.

And it makes you think about the impact of all components

in the chain that affect accuracy.

 

But that is not the only thing to be said about EMC , as Derek emphasizes.

 

 

Gert

 

 

Van: emc-p...@ieee.org [mailto:emc-p...@ieee.org] Namens lfresea...@aol.com
Verzonden: woensdag 11 augustus 2010 18:00
Aan: deniz.demi...@ntscorp.com; emc-p...@ieee.org
Onderwerp: Re: Calibration supplier for signal generator with pulse modulation

 

Hi Deniz,

this is where real EMI guys differ from Metrology guys. We really don't need
to be piddling with little numbers with the exception of frequency. Most
of these modulations are compromises, and measuring a compromise accurately is
a silly thing to do: in reality.

 

You may want to get on board with the proof of the pudding phrase, it's OK in
EMI: otherwise we expend all sorts of effort for no VALUE in return. The
compliance world is obsessed with meeting a number, when the REAL reason for
doing this testing is to ensure successful operation in use.

I strongly disagree with Gerts statement MU is simple, it's not. Of the 140+
labs I've visited as an assessor, only a handful have a valid effort, and less
than 1/2 doz believe it was of real value.

Precision and EMI do not go together. I for one like it like that. Whats
really needed is a competent individual with adequate equipment.

If a committee would like MU, then as test labs we should isolate the cost
that adds, and identify it on peoples invoices when that test is run. It's an
effective way of making the standard unpopular. 


The reason I'm on a soap box about this is because unless silly requiremnts
like this re CHALLENGED, and not just carte-blanche accepted, they become
requirements. For calibration, I believe MU is useful, but for EMI, it has no
place.

Sincerely,

Derek.


From: Deniz Demirci deniz.demi...@ntscorp.com
To: Untitled emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 10:35 am
Subject: RE: Calibration supplier for signal generator with pulse modulation

Could you define how precise?




 





 
What is your acceptance criteria for the modulation dept? 




 
Let's say for basic 80 % AM modulation

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Hi Gert, 

I'm sorry, but I don't see that analogy...

Cheers,

Derek.




From: ce-test, qualified testing bv - Gert Gremmen g.grem...@cetest.nl
To: dw...@atcb.com; lfresea...@aol.com; deniz.demi...@ntscorp.com; 
emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 1:45 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation


 
 
Van: emc-p...@ieee.org [mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org? ] 
Namens Dennis Ward
Verzonden: woensdag 11 augustus 2010 18:50
Aan: lfresea...@aol.com; deniz.demi...@ntscorp.com; emc-p...@ieee.org
Onderwerp: RE: Calibration supplier for signal generator with pulse modulation
 
 
What’s really needed is a competent individual with adequate equipment” is so 
important.  
 
That’s is exactly the human equivalent of MU; he (she?) knows when a 
measurement is in error.
 
 
Gert Gremmen
-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at 
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
In message c8885bbf.845c4%ken.ja...@emccompliance.com, dated Wed, 11 
Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:

If you live far from the broadcaster, something emitting right at the 
limit may cause objectionable interference.

Even below the limit. I am in a null area for TV from the London Crystal 
Palace transmitter and even with a high-gain antenna on a 9 m mast, I 
have EMI problems. People just a few tens of metres away, with less 
lavish antennas, do not.
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org

But the uncertainty in that process is huge. So the whole edifice rests 
on
feet of clay. 

  Agreed John, so why worry about a few dB here and there





From: John Woodgate j...@jmwa.demon.co.uk
To: emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 12:31 pm
Subject: Re: Calibration supplier for signal generator with pulse modulation


In message c88840fe.84571%ken.ja...@emccompliance.com, dated Wed, 11 Aug
2010, Ken Javor ken.ja...@emccompliance.com writes: 
 
EMI limits are quite arbitrary; 
 
Well, not quite. They are set, or re-set, so as to keep complaints of EMI to
an acceptable minimum. But the uncertainty in that process is huge. So the
whole edifice rests on feet of clay. 
-- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk 
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK 
If at first you don't succeed, delegate. 
But I support unbloated email http://www.asciiribbon.org/ 
 
- 
 
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org 
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 
Graphics (in well-used formats), large files, etc. can be posted to that URL. 
 
Website: http://www.ieee-pses.org/ 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators: 
Scott Douglas emcp...@socal.rr.com 
Mike Cantwell mcantw...@ieee.org 
 
For policy questions, send mail to: 
Jim Bacher: j.bac...@ieee.org 
David Heald: dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
My point exactly.  In particular, rfi limits have to be based on some
quality of reception that is achieved at some signal-to-noise ratio.  If you
live in an area with a strong radio signal, a device can emit way more EMI
than the limits allow and not cause rfi.  If you live far from the
broadcaster, something emitting right at the limit may cause objectionable
interference.

The placement of the limits was deliberate, as Mr. Woodgate states. But the
effect of the limits is all over the place.

There is simply no way to improve on Mr. Woodgate's closing comment, so I'm
not even going to try.

Ken Javor

Phone: (256) 650-5261


 From: John Woodgate j...@jmwa.demon.co.uk
 Date: Wed, 11 Aug 2010 18:31:43 +0100
 To: emc-p...@ieee.org
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 In message c88840fe.84571%ken.ja...@emccompliance.com, dated Wed, 11
 Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:
 
 EMI limits are quite arbitrary;
 
 Well, not quite. They are set, or re-set, so as to keep complaints of
 EMI to an acceptable minimum. But the uncertainty in that process is
 huge. So the whole edifice rests on feet of clay.
 -- 
 OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
 John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
 If at first you don't succeed, delegate.
 But I support unbloated email http://www.asciiribbon.org/
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
 

 

Van: emc-p...@ieee.org [mailto:emc-p...@ieee.org] Namens Dennis Ward
Verzonden: woensdag 11 augustus 2010 18:50
Aan: lfresea...@aol.com; deniz.demi...@ntscorp.com; emc-p...@ieee.org
Onderwerp: RE: Calibration supplier for signal generator with pulse modulation

 

 

What’s really needed is a competent individual with adequate equipment” is
so important.  

 

That’s is exactly the human equivalent of MU; he (she?) knows when a
measurement is in error.

 

 

Gert Gremmen

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
In message c88840fe.84571%ken.ja...@emccompliance.com, dated Wed, 11 
Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:

EMI limits are quite arbitrary;

Well, not quite. They are set, or re-set, so as to keep complaints of 
EMI to an acceptable minimum. But the uncertainty in that process is 
huge. So the whole edifice rests on feet of clay.
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Ken / Deniz,
Speaking of significant digit's: I'm still looking for that EMI receiver that
will measure to 1/100 of a dB. So I can report to a 1/10 of a dB in reports
like I'm asked to.



Michael Sundstrom
OHD / TREQ Dallas
Electronic Lab Analist, EMC Lead
2170 French Settelment Rd, Suite B
Dallas, Texas  75212
(214) 579 6312



From: Ken Javor [mailto:ken.ja...@emccompliance.com] 
Sent: Wednesday, August 11, 2010 11:59 AM
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] Calibration supplier for signal generator with pulse
modulation

This gets back to Mr. Walton's differentiation between EMI testing and
calibration laboratories.

Clearly modulation, measured with an o'scope, can be measured to the
tolerances available from the o'scope.  That's plenty good enough. It
strains credulity that there is one brand of scope that would give sloppier
results making it easier to pass a test.

The essence of what Mr. Walton and I are saying is well-expressed by the
rules for using significant digits: You don't get four digit accuracy as the
result of computations using two digit accuracy inputs.

EMI limits are quite arbitrary; trying to meet them with accuracy exceeding
the limit placement process is unnecessary.  As stated earlier, the only
reason for MU control is on the basic facility chambers/OATS so that there
is some repeatability from facility to facility, and so that it isn't easier
to pass at one facility than another.

Anything beyond that is superfluous and an unnecessary expense.

Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
system integrity check does indeed check that the cable is properly
accounted for in terms of attenuation. Mr. Demirci is correct that the
signal generator can be expected to be a better match to the cable than is
the actual antenna used.  However, to the limits of accuracy required for
EMI testing, the antenna factor calibration takes care of the mismatch
between antenna and cable, since the antenna is calibrated in a 50 Ohm
system (albeit likely using pads between antenna and cable for calibration).
If further accuracy is desired, most manufacturers provide vswr
characteristics for their antennas.

Fear isn't the issue.  The issue is a misapplication of a process where it
isn't required, and the patina of precision and accuracy this dishonestly
bestows on an inherently inaccurate and imprecise discipline.
 
Ken Javor

Phone: (256) 650-5261


 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Wed, 11 Aug 2010 08:35:06 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 Could you define how precise?
 
 What is your acceptance criteria for the modulation dept?
 Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
 between 60 % to 90 % is good enough.
 There is more than a dB peak difference in the signal for 60 % AM and 80
 % AM modulations. You won't realize the difference with a field probe in
 radiated immunity tests with modulated signal. (Simple  math;
 20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me
 
 Another case;
 If you are using 6 meter cable for radiated emission at 10 GHz, your
 cable characterization uncertainty is more than 1.5 dB even with a quite
 high grade cable (Experimental measurements). Check the cable vswr
 figures in their specs measured in ideal conditions. Even a simple cable
 is a significant uncertainty contributor.
 Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site
 imperfection is another story. Those figures are not accounted for in
 the MIL-STD-461 RE102 verification. Everything seems to be very good
 when you terminate the measurement cable with a signal generator (50
 ohm) output.  I don't agree with this quote an ultimate
 proof-of-the-pudding, /quote
 
 You can use all your engineering skills for the tests but you have to
 quantify your risk using type B measurement uncertainty analysis and do
 the Type A if you can afford to see where you stand.
 
 As Mr. Gremmen said  MU is not difficult
 No need to be afraid,
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci 
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken
 Javor
 Sent: Wednesday, August 11, 2010 7:55 AM
 To: Untitled
 Subject: Re: Calibration supplier for signal generator with pulse
 modulation
 
 Precisely.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 08:27:34 -0400
 To: emc-pstc emc-p...@ieee.org
 Subject: re: Calibration supplier for signal generator with pulse
 modulation
 
 Not quite what you need to know but I've used signal taps

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Bingo.  Clearly another driver for inserting MU where it doesn't belong is a
desire to replace the need for competent personnel with an algorithmic process
that works for any personnel.  But the same personnel who don’t know how to
properly perform the test will also not know how to run the algorithm. Hence
Mr. Walton’s observations on how poorly MU is executed in reality.
 
Ken Javor

Phone: (256) 650-5261





From: Dennis Ward dw...@atcb.com
Reply-To: dw...@atcb.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Wed, 11 Aug 2010 09:50:21 -0700
To: lfresea...@aol.com, deniz.demi...@ntscorp.com, emc-p...@ieee.org
Subject: RE: Calibration supplier for signal generator with pulse modulation

I think I would only add that while measurement uncertainties for EMC is
nebulous at best, at the same time we do not want to get into the habit of a
slam dunk mentality of ‘oh, just a number, it doesn’t matter.”  
 
That is why Derek’s statement of “What’s really needed is a competent
individual with adequate equipment” is so important.  Where electromagnetic
compatibility is concerned, competence of the engineers doing the measurement
is probably much more important than uncertainties. I know that one of the
biggest benefits to testing in the radio approvals industry is competence of
test personnel.
 
Compliance does matter and the best way to keep unneeded uncertainties out of
the EMC measurement industry, is to keep competence of test personnel in.



 
Dennis Ward 
Director of Engineering
American TCB 
Certification Resource for the Wireless Industry www.atcb.com
http://www.atcb.com/ http://www.atcb.com/  
703-847-4700 fax 703-847-6888 
direct - 703-880-4841 


From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of
lfresea...@aol.com
Sent: Wednesday, August 11, 2010 9:00 AM
To: deniz.demi...@ntscorp.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


Hi Deniz,

this is where real EMI guys differ from Metrology guys. We really don't need
to be piddling with little numbers with the exception of frequency. Most
of these modulations are compromises, and measuring a compromise accurately is
a silly thing to do: in reality.



You may want to get on board with the proof of the pudding phrase, it's OK in
EMI: otherwise we expend all sorts of effort for no VALUE in return. The
compliance world is obsessed with meeting a number, when the REAL reason for
doing this testing is to ensure successful operation in use.

I strongly disagree with Gerts statement MU is simple, it's not. Of the 140+
labs I've visited as an assessor, only a handful have a valid effort, and less
than 1/2 doz believe it was of real value.

Precision and EMI do not go together. I for one like it like that. Whats
really needed is a competent individual with adequate equipment.

If a committee would like MU, then as test labs we should isolate the cost
that adds, and identify it on peoples invoices when that test is run. It's an
effective way of making the standard unpopular. 


The reason I'm on a soap box about this is because unless silly requiremnts
like this re CHALLENGED, and not just carte-blanche accepted, they become
requirements. For calibration, I believe MU is useful, but for EMI, it has no
place.

Sincerely,

Derek.


From: Deniz Demirci deniz.demi...@ntscorp.com
To: Untitled emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 10:35 am
Subject: RE: Calibration supplier for signal generator with pulse modulation
Could you define how precise?









What is your acceptance criteria for the modulation dept? 




Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or




between 60 % to 90 % is good enough. 




There is more than a dB peak difference in the signal for 60 % AM and 80




% AM modulations. You won't realize the difference with a field probe in




radiated immunity tests with modulated signal. (Simple  math;




20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me









Another case;




If you are using 6 meter cable for radiated emission at 10 GHz, your




cable characterization uncertainty is more than 1.5 dB even with a quite




high grade cable (Experimental measurements). Check the cable vswr




figures in their specs measured in ideal conditions. Even a simple cable




is a significant uncertainty contributor.




Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site




imperfection is another story. Those figures are not accounted for in




the MIL-STD-461 RE102 verification. Everything seems to be very good




when you terminate the measurement cable with a signal generator (50




ohm) output.  I don't agree with this quote an ultimate




proof-of-the-pudding, /quote









You can use all your engineering skills for the tests but you have to




quantify your risk using type B measurement uncertainty analysis

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
This gets back to Mr. Walton's differentiation between EMI testing and
calibration laboratories.

Clearly modulation, measured with an o'scope, can be measured to the
tolerances available from the o'scope.  That's plenty good enough. It
strains credulity that there is one brand of scope that would give sloppier
results making it easier to pass a test.

The essence of what Mr. Walton and I are saying is well-expressed by the
rules for using significant digits: You don't get four digit accuracy as the
result of computations using two digit accuracy inputs.

EMI limits are quite arbitrary; trying to meet them with accuracy exceeding
the limit placement process is unnecessary.  As stated earlier, the only
reason for MU control is on the basic facility chambers/OATS so that there
is some repeatability from facility to facility, and so that it isn't easier
to pass at one facility than another.

Anything beyond that is superfluous and an unnecessary expense.

Regarding the example of the cable at 10 GHz.  The MIL-STD-461 measurement
system integrity check does indeed check that the cable is properly
accounted for in terms of attenuation. Mr. Demirci is correct that the
signal generator can be expected to be a better match to the cable than is
the actual antenna used.  However, to the limits of accuracy required for
EMI testing, the antenna factor calibration takes care of the mismatch
between antenna and cable, since the antenna is calibrated in a 50 Ohm
system (albeit likely using pads between antenna and cable for calibration).
If further accuracy is desired, most manufacturers provide vswr
characteristics for their antennas.

Fear isn't the issue.  The issue is a misapplication of a process where it
isn't required, and the patina of precision and accuracy this dishonestly
bestows on an inherently inaccurate and imprecise discipline.
 
Ken Javor

Phone: (256) 650-5261


 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Wed, 11 Aug 2010 08:35:06 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 Could you define how precise?
 
 What is your acceptance criteria for the modulation dept?
 Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
 between 60 % to 90 % is good enough.
 There is more than a dB peak difference in the signal for 60 % AM and 80
 % AM modulations. You won't realize the difference with a field probe in
 radiated immunity tests with modulated signal. (Simple  math;
 20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me
 
 Another case;
 If you are using 6 meter cable for radiated emission at 10 GHz, your
 cable characterization uncertainty is more than 1.5 dB even with a quite
 high grade cable (Experimental measurements). Check the cable vswr
 figures in their specs measured in ideal conditions. Even a simple cable
 is a significant uncertainty contributor.
 Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site
 imperfection is another story. Those figures are not accounted for in
 the MIL-STD-461 RE102 verification. Everything seems to be very good
 when you terminate the measurement cable with a signal generator (50
 ohm) output.  I don't agree with this quote an ultimate
 proof-of-the-pudding, /quote
 
 You can use all your engineering skills for the tests but you have to
 quantify your risk using type B measurement uncertainty analysis and do
 the Type A if you can afford to see where you stand.
 
 As Mr. Gremmen said  MU is not difficult
 No need to be afraid,
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci 
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken
 Javor
 Sent: Wednesday, August 11, 2010 7:55 AM
 To: Untitled
 Subject: Re: Calibration supplier for signal generator with pulse
 modulation
 
 Precisely.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 08:27:34 -0400
 To: emc-pstc emc-p...@ieee.org
 Subject: re: Calibration supplier for signal generator with pulse
 modulation
 
 Not quite what you need to know but I've used signal taps or
 directional
 couplers with a 'scope to watch the RF waveform and set modulation
 depth,
 and a calibrated counter, or even a receiver or analyzer will for
 frequency. One always has recourse to calibrated devices to monitor
 another, uncalibrated one. It's a good idea anyway! If a detector must
 be
 used whose linearity is unknown, one can use calibrated attenuators to
 find
 out. 
 
 
 Cortland Richmond
 KA5S 
 
 
 [Original Message]
 From: Wendy Nya wendy...@yahoo.com
 To: emc-p...@ieee.org
 Date: 8/10/2010 4:23:29 AM
 Subject

RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
I think I would only add that while measurement uncertainties for EMC is
nebulous at best, at the same time we do not want to get into the habit of a
slam dunk mentality of ‘oh, just a number, it doesn’t matter.”  

 

That is why Derek’s statement of “What’s really needed is a competent
individual with adequate equipment” is so important.  Where electromagnetic
compatibility is concerned, competence of the engineers doing the measurement
is probably much more important than uncertainties. I know that one of the
biggest benefits to testing in the radio approvals industry is competence of
test personnel.

 

Compliance does matter and the best way to keep unneeded uncertainties out of
the EMC measurement industry, is to keep competence of test personnel in.



 

 

Dennis Ward 
Director of Engineering

American TCB 
Certification Resource for the Wireless Industry www.atcb.com
http://www.atcb.com/  
703-847-4700 fax 703-847-6888 
direct - 703-880-4841 

 

From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of
lfresea...@aol.com
Sent: Wednesday, August 11, 2010 9:00 AM
To: deniz.demi...@ntscorp.com; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

Hi Deniz,

this is where real EMI guys differ from Metrology guys. We really don't need
to be piddling with little numbers with the exception of frequency. Most
of these modulations are compromises, and measuring a compromise accurately is
a silly thing to do: in reality.

 

You may want to get on board with the proof of the pudding phrase, it's OK in
EMI: otherwise we expend all sorts of effort for no VALUE in return. The
compliance world is obsessed with meeting a number, when the REAL reason for
doing this testing is to ensure successful operation in use.

I strongly disagree with Gerts statement MU is simple, it's not. Of the 140+
labs I've visited as an assessor, only a handful have a valid effort, and less
than 1/2 doz believe it was of real value.

Precision and EMI do not go together. I for one like it like that. Whats
really needed is a competent individual with adequate equipment.

If a committee would like MU, then as test labs we should isolate the cost
that adds, and identify it on peoples invoices when that test is run. It's an
effective way of making the standard unpopular. 


The reason I'm on a soap box about this is because unless silly requiremnts
like this re CHALLENGED, and not just carte-blanche accepted, they become
requirements. For calibration, I believe MU is useful, but for EMI, it has no
place.

Sincerely,

Derek.


From: Deniz Demirci deniz.demi...@ntscorp.com
To: Untitled emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 10:35 am
Subject: RE: Calibration supplier for signal generator with pulse modulation

Could you define how precise?




 





 
What is your acceptance criteria for the modulation dept? 




 
Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or




 
between 60 % to 90 % is good enough. 




 
There is more than a dB peak difference in the signal for 60 % AM and 80




 
% AM modulations. You won't realize the difference with a field probe in




 
radiated immunity tests with modulated signal. (Simple  math;




 
20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me




 





 
Another case;




 
If you are using 6 meter cable for radiated emission at 10 GHz, your




 
cable characterization uncertainty is more than 1.5 dB even with a quite




 
high grade cable (Experimental measurements). Check the cable vswr




 
figures in their specs measured in ideal conditions. Even a simple cable




 
is a significant uncertainty contributor.




 
Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site




 
imperfection is another story. Those figures are not accounted for in




 
the MIL-STD-461 RE102 verification. Everything seems to be very good




 
when you terminate the measurement cable with a signal generator (50




 
ohm) output.  I don't agree with this quote an ultimate




 
proof-of-the-pudding, /quote




 





 
You can use all your engineering skills for the tests but you have to




 
quantify your risk using type B measurement uncertainty analysis and do




 
the Type A if you can afford to see where you stand.




 





 
As Mr. Gremmen said  MU is not difficult




 
No need to be afraid,




 





 
OOO (Own opinions only)




 





 
Best regards,




 





 
Deniz Demirci 




 
National Technical Systems (NTS Canada)




 
Phone: 403-568-6605 ext 244




 
fax: 403-568-6970




 
email:deniz.demi...@ntscorp.com




 
web: http://www.ntscorp.com/about/locations




 





 





 





 





 
From: emc-p...@ieee.org [mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org?
] On Behalf Of Ken




 
Javor




 
Sent: Wednesday, August 11, 2010 7:55 AM




 
To: Untitled




 
Subject: Re: Calibration supplier for signal generator with pulse




 
modulation




 





 
Precisely

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Hi Deniz,

this is where real EMI guys differ from Metrology guys. We really don't need
to be piddling with little numbers with the exception of frequency. Most
of these modulations are compromises, and measuring a compromise accurately is
a silly thing to do: in reality.


You may want to get on board with the proof of the pudding phrase, it's OK in
EMI: otherwise we expend all sorts of effort for no VALUE in return. The
compliance world is obsessed with meeting a number, when the REAL reason for
doing this testing is to ensure successful operation in use.

I strongly disagree with Gerts statement MU is simple, it's not. Of the 140+
labs I've visited as an assessor, only a handful have a valid effort, and less
than 1/2 doz believe it was of real value.

Precision and EMI do not go together. I for one like it like that. Whats
really needed is a competent individual with adequate equipment.

If a committee would like MU, then as test labs we should isolate the cost
that adds, and identify it on peoples invoices when that test is run. It's an
effective way of making the standard unpopular. 


The reason I'm on a soap box about this is because unless silly requiremnts
like this re CHALLENGED, and not just carte-blanche accepted, they become
requirements. For calibration, I believe MU is useful, but for EMI, it has no
place.

Sincerely,

Derek.



From: Deniz Demirci deniz.demi...@ntscorp.com
To: Untitled emc-p...@ieee.org
Sent: Wed, Aug 11, 2010 10:35 am
Subject: RE: Calibration supplier for signal generator with pulse modulation


Could you define how precise?





What is your acceptance criteria for the modulation dept? 


Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or


between 60 % to 90 % is good enough. 


There is more than a dB peak difference in the signal for 60 % AM and 80


% AM modulations. You won't realize the difference with a field probe in


radiated immunity tests with modulated signal. (Simple  math;


20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me





Another case;


If you are using 6 meter cable for radiated emission at 10 GHz, your


cable characterization uncertainty is more than 1.5 dB even with a quite


high grade cable (Experimental measurements). Check the cable vswr


figures in their specs measured in ideal conditions. Even a simple cable


is a significant uncertainty contributor.


Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site


imperfection is another story. Those figures are not accounted for in


the MIL-STD-461 RE102 verification. Everything seems to be very good


when you terminate the measurement cable with a signal generator (50


ohm) output.  I don't agree with this quote an ultimate


proof-of-the-pudding, /quote





You can use all your engineering skills for the tests but you have to


quantify your risk using type B measurement uncertainty analysis and do


the Type A if you can afford to see where you stand.





As Mr. Gremmen said  MU is not difficult


No need to be afraid,





OOO (Own opinions only)





Best regards,





Deniz Demirci 


National Technical Systems (NTS Canada)


Phone: 403-568-6605 ext 244


fax: 403-568-6970


email:deniz.demi...@ntscorp.com


web: http://www.ntscorp.com/about/locations














From: emc-p...@ieee.org [mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org?
] On Behalf Of Ken


Javor


Sent: Wednesday, August 11, 2010 7:55 AM


To: Untitled


Subject: Re: Calibration supplier for signal generator with pulse


modulation





Precisely.


 


Ken Javor





Phone: (256) 650-5261








 From: Cortland Richmond k...@earthlink.net


 Reply-To: k...@earthlink.net


 Date: Wed, 11 Aug 2010 08:27:34 -0400


 To: emc-pstc emc-p...@ieee.org


 Subject: re: Calibration supplier for signal generator with pulse


modulation


 


 Not quite what you need to know but I've used signal taps or


directional


 couplers with a 'scope to watch the RF waveform and set modulation


depth,


 and a calibrated counter, or even a receiver or analyzer will for


 frequency. One always has recourse to calibrated devices to monitor


 another, uncalibrated one. It's a good idea anyway! If a detector must


be


 used whose linearity is unknown, one can use calibrated attenuators to


find


 out. 


 


 


 Cortland Richmond


 KA5S 


 


 


 [Original Message]


 From: Wendy Nya wendy...@yahoo.com


 To: emc-p...@ieee.org


 Date: 8/10/2010 4:23:29 AM


 Subject: Calibration supplier for signal generator with pulse


modulation


 


 Dear All,


 


 I am looking for a calibration supplier that can provide accredited


 service for 


 AR SG6000. It has built-in pulse modulation option (for Radiated


Immunity


 use).


 


 By the way - Is anyone using this model? It seems to be OEM from


Agilent


 (it 


 came in an agilent box) but the equipment is marked AR


 and works with Agilent N5181A driver. Agilent is saying that it is


not


 able to 


 provide

RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Could you define how precise?

What is your acceptance criteria for the modulation dept? 
Let's say for basic 80 % AM modulation.  Is your tolerance 0.1 % or
between 60 % to 90 % is good enough. 
There is more than a dB peak difference in the signal for 60 % AM and 80
% AM modulations. You won't realize the difference with a field probe in
radiated immunity tests with modulated signal. (Simple  math;
20*Log(1.6/1.8) = -1.02 dB) It seems not very insignificant to me

Another case;
If you are using 6 meter cable for radiated emission at 10 GHz, your
cable characterization uncertainty is more than 1.5 dB even with a quite
high grade cable (Experimental measurements). Check the cable vswr
figures in their specs measured in ideal conditions. Even a simple cable
is a significant uncertainty contributor.
Your measurement antenna is not exactly 50 Ohm at 10 GHz also. Site
imperfection is another story. Those figures are not accounted for in
the MIL-STD-461 RE102 verification. Everything seems to be very good
when you terminate the measurement cable with a signal generator (50
ohm) output.  I don't agree with this quote an ultimate
proof-of-the-pudding, /quote

You can use all your engineering skills for the tests but you have to
quantify your risk using type B measurement uncertainty analysis and do
the Type A if you can afford to see where you stand.

As Mr. Gremmen said  MU is not difficult
No need to be afraid,

OOO (Own opinions only)

Best regards,

Deniz Demirci 
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations




From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken
Javor
Sent: Wednesday, August 11, 2010 7:55 AM
To: Untitled
Subject: Re: Calibration supplier for signal generator with pulse
modulation

Precisely.
 
Ken Javor

Phone: (256) 650-5261


 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 08:27:34 -0400
 To: emc-pstc emc-p...@ieee.org
 Subject: re: Calibration supplier for signal generator with pulse
modulation
 
 Not quite what you need to know but I've used signal taps or
directional
 couplers with a 'scope to watch the RF waveform and set modulation
depth,
 and a calibrated counter, or even a receiver or analyzer will for
 frequency. One always has recourse to calibrated devices to monitor
 another, uncalibrated one. It's a good idea anyway! If a detector must
be
 used whose linearity is unknown, one can use calibrated attenuators to
find
 out. 
 
 
 Cortland Richmond
 KA5S 
 
 
 [Original Message]
 From: Wendy Nya wendy...@yahoo.com
 To: emc-p...@ieee.org
 Date: 8/10/2010 4:23:29 AM
 Subject: Calibration supplier for signal generator with pulse
modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited
 service for 
 AR SG6000. It has built-in pulse modulation option (for Radiated
Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from
Agilent
 (it 
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is
not
 able to 
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 -
 
 This message is from the IEEE Product Safety Engineering Society
emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to
that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list. To post a message to the list, send your
e-mail to emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that
URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived

Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
In message c88815fd.844e8%ken.ja...@emccompliance.com, dated Wed, 11 
Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:

Precisely.

... or should that be 'accurately'. We must use these meteorological 
terms correctly! (;-)
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Precisely.
 
Ken Javor

Phone: (256) 650-5261


 From: Cortland Richmond k...@earthlink.net
 Reply-To: k...@earthlink.net
 Date: Wed, 11 Aug 2010 08:27:34 -0400
 To: emc-pstc emc-p...@ieee.org
 Subject: re: Calibration supplier for signal generator with pulse modulation
 
 Not quite what you need to know but I've used signal taps or directional
 couplers with a 'scope to watch the RF waveform and set modulation depth,
 and a calibrated counter, or even a receiver or analyzer will for
 frequency. One always has recourse to calibrated devices to monitor
 another, uncalibrated one. It's a good idea anyway! If a detector must be
 used whose linearity is unknown, one can use calibrated attenuators to find
 out. 
 
 
 Cortland Richmond
 KA5S 
 
 
 [Original Message]
 From: Wendy Nya wendy...@yahoo.com
 To: emc-p...@ieee.org
 Date: 8/10/2010 4:23:29 AM
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited
 service for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent
 (it 
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not
 able to 
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Absolutely incorrect.  The signal simply needs to be measured with a
calibrated instrument.  
 
Ken Javor

Phone: (256) 650-5261





From: Gärdin Petter petter.gar...@saabgroup.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Wed, 11 Aug 2010 13:18:05 +
To: EMC-PSTC@LISTSERV.IEEE.ORG EMC-PSTC@LISTSERV.IEEE.ORG
Conversation: Calibration supplier for signal generator with pulse modulation
Subject: RE: Calibration supplier for signal generator with pulse modulation

And now almost getting back to the original question and a quote from Ken,
the measurement system integrity check in MIL-STD-461 in which a calibrated
input signal corresponding to a level 6 dB below the limit is applied at the
transducer end of the measurement system, and the EMI receiver must measure
that signal accurately within +/- 3 dB.
 
And the calibrated input signal should come from a calibrated signal
generator, meaning that the signal generator need to be calibrated.
 
Petter Gärdin
 




From: Ken Javor [mailto:ken.ja...@emccompliance.com] 
Sent: den 10 augusti 2010 23:05
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] Calibration supplier for signal generator with pulse
modulation

This excerpt from Mr. Demirci‘s message below is the kernel of the issue:

“I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then, manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report.”

In the days of OATS and ANSI C63,4, an NSA correlation of +/- 4 dB sufficed. 
In the days of SACS and FACS, some sort of similar measurement is clearly
required. But this facility certification in no way extends to mundane
measurements that are made with an ordinary instrument such as an o’scope,
or handheld meter, or for that matter, an EMI receiver. Those measurements are
controlled by using a calibrated device, and even better, much better: the
measurement system integrity check in MIL-STD-461 in which a calibrated input
signal corresponding to a level 6 dB below the limit is applied at the
transducer end of the measurement system, and the EMI receiver must measure
that signal accurately within +/- 3 dB. That is the ultimate
“proof-of-the-pudding,” with the exception that it doesn’t account for
chamber effects for radiated emissions.

There are a couple reasons that military and automotive and commercial
aerospace EMI testing do not require measurement uncertainty. 

One is the ancient dictum, “If you can’t stand the answer, don’t ask the
question.” That is, we know a priori, before performing the exercise, that
one meter separation radiated measurements from an extended test set-up in an
imperfectly anechoic chamber are not going to result in pretty uncertainty
numbers.

The reason that this is ultimately acceptable goes back to the above excerpt
from the message below from Mr. Demirci.  In the commercial world, you must
EMI qualify before going to market.  In that case, you need all EMI test
facilities to be equal.  In the world of military, automotive and aerospace,
the EMI qualification is usually done as a collaborative effort between vendor
and customer, and is performed after a decision has been made that the
customer will do business with the vendor.

That is all background.  The unalterable fact, regardless of how MU has been
misapplied and perverted, is that it applies to the measurement facility
itself; something that inherently will have an uncertainty on the order of
several dB. It does not apply to things that can be measured to tenths of a
dB, or are not even spec’d in dB, such as the modulation waveform of a
signal generator, or its frequency accuracy.
 
Ken Javor

Phone: (256) 650-5261





From: Deniz Demirci deniz.demi...@ntscorp.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Tue, 10 Aug 2010 10:39:37 -0700
To: emc-p...@ieee.org
Conversation: Calibration supplier for signal generator with pulse modulation
Subject: RE: Calibration supplier for signal generator with pulse modulation

I guess the equipments in Apollo project hasn’t  only pass the tests with no
margin :-) They may have required quite a big margin so MU is not an issue at
all…   
Commercial world can be quite a bit different in that matter. They can’t
afford 10 dB margin.  
Has anyone seen a consumer electronic product will pass 10 dB Class B emission
 limits ?
 
I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then,  manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report. 
 
OOO (Own opinions only)
 
Best regards

RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
And now almost getting back to the original question and a quote from Ken,
the measurement system integrity check in MIL-STD-461 in which a calibrated
input signal corresponding to a level 6 dB below the limit is applied at the
transducer end of the measurement system, and the EMI receiver must measure
that signal accurately within +/- 3 dB.
 
And the calibrated input signal should come from a calibrated signal
generator, meaning that the signal generator need to be calibrated.
 
Petter Gärdin
 




From: Ken Javor [mailto:ken.ja...@emccompliance.com] 
Sent: den 10 augusti 2010 23:05
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] Calibration supplier for signal generator with pulse
modulation


This excerpt from Mr. Demirci‘s message below is the kernel of the issue:

“I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then, manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report.”

In the days of OATS and ANSI C63,4, an NSA correlation of +/- 4 dB sufficed. 
In the days of SACS and FACS, some sort of similar measurement is clearly
required. But this facility certification in no way extends to mundane
measurements that are made with an ordinary instrument such as an o’scope,
or handheld meter, or for that matter, an EMI receiver. Those measurements are
controlled by using a calibrated device, and even better, much better: the
measurement system integrity check in MIL-STD-461 in which a calibrated input
signal corresponding to a level 6 dB below the limit is applied at the
transducer end of the measurement system, and the EMI receiver must measure
that signal accurately within +/- 3 dB. That is the ultimate
“proof-of-the-pudding,” with the exception that it doesn’t account for
chamber effects for radiated emissions.

There are a couple reasons that military and automotive and commercial
aerospace EMI testing do not require measurement uncertainty. 

One is the ancient dictum, “If you can’t stand the answer, don’t ask the
question.” That is, we know a priori, before performing the exercise, that
one meter separation radiated measurements from an extended test set-up in an
imperfectly anechoic chamber are not going to result in pretty uncertainty
numbers.

The reason that this is ultimately acceptable goes back to the above excerpt
from the message below from Mr. Demirci.  In the commercial world, you must
EMI qualify before going to market.  In that case, you need all EMI test
facilities to be equal.  In the world of military, automotive and aerospace,
the EMI qualification is usually done as a collaborative effort between vendor
and customer, and is performed after a decision has been made that the
customer will do business with the vendor.

That is all background.  The unalterable fact, regardless of how MU has been
misapplied and perverted, is that it applies to the measurement facility
itself; something that inherently will have an uncertainty on the order of
several dB. It does not apply to things that can be measured to tenths of a
dB, or are not even spec’d in dB, such as the modulation waveform of a
signal generator, or its frequency accuracy.
 
Ken Javor

Phone: (256) 650-5261





From: Deniz Demirci deniz.demi...@ntscorp.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Tue, 10 Aug 2010 10:39:37 -0700
To: emc-p...@ieee.org
Conversation: Calibration supplier for signal generator with pulse modulation
Subject: RE: Calibration supplier for signal generator with pulse modulation

I guess the equipments in Apollo project hasn’t  only pass the tests with no
margin :-) They may have required quite a big margin so MU is not an issue at
all…   
Commercial world can be quite a bit different in that matter. They can’t
afford 10 dB margin.  
Has anyone seen a consumer electronic product will pass 10 dB Class B emission
 limits ?
 
I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then,  manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report. 
 
OOO (Own opinions only)
 
Best regards,
 
Deniz Demirci 
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations
http://www.ntscorp.com/about/locations
http://www.ntscorp.com/about/locations  

 

From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of
lfresea...@aol.com
Sent: Tuesday, August 10, 2010 11:07 AM
To: j...@jmwa.demon.co.uk; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


HI John,

just stressing Ken's use of the word unwarranted. I'm

re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Not quite what you need to know but I've used signal taps or directional
couplers with a 'scope to watch the RF waveform and set modulation depth,
and a calibrated counter, or even a receiver or analyzer will for
frequency. One always has recourse to calibrated devices to monitor
another, uncalibrated one. It's a good idea anyway! If a detector must be
used whose linearity is unknown, one can use calibrated attenuators to find
out. 


Cortland Richmond
KA5S 


 [Original Message]
 From: Wendy Nya wendy...@yahoo.com
 To: emc-p...@ieee.org
 Date: 8/10/2010 4:23:29 AM
 Subject: Calibration supplier for signal generator with pulse modulation

 Dear All,

 I am looking for a calibration supplier that can provide accredited
service for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
use).

 By the way - Is anyone using this model? It seems to be OEM from Agilent
(it 
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not
able to 
 provide accredited calibration service for this model.

 Thanks  Regards,
 Wendy Nya

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


RE: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
Not quite what you need to know but I've used signal taps or directional
couplers with a 'scope to watch the RF waveform and set modulation depth,
and a calibrated counter, or even a receiver or analyzer will for
frequency.  One always has recourse to calibrated devices to monitor
another, uncalibrated one.  It's a good idea anyway!   If a detector must
be used whose linearity is unknown, one can use calibrated attenuators to
find out.  


Cortland Richmond
KA5S 


 [Original Message]
 From: Wendy Nya wendy...@yahoo.com
 To: emc-p...@ieee.org
 Date: 8/10/2010 4:23:29 AM
 Subject: Calibration supplier for signal generator with pulse modulation

 Dear All,

 I am looking for a calibration supplier that can provide accredited
service for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
use).

 By the way - Is anyone using this model? It seems to be OEM from Agilent
(it 
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not
able to 
 provide accredited calibration service for this model.

 Thanks  Regards,
 Wendy Nya


   

 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that
URL.

 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html

 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org

 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-11 Thread emc-p...@ieee.org
There is a fundamental difference between assigning an uncertainty factor
that is in fact a hard number, like NSA, vs. something that has to be
wagged, like the effect of cable placement on radiation efficiency in the
direction of an antenna.

In fact, this is an excellent example of when a large, but uncontrolled
uncertainty points us in the direction of another control altogether.  The
radiation efficiency of a cable, relative to its max efficiency, will vary
from something close to zero, up to one. Obviously some assumptions are made
that place the actual efficiency somewhere in the vicinity of unity, with
some uncertainty as to how close unity is approached, based on assumptions
about the quality of test personnel, and the time they take to do the
maximizing.

This is an area where human engineering, or perhaps human factors has to be
factored into the test equation.  If a test sample is very quiet, some quick
cable manipulations can be performed, and if no significant changes are
observed, there is no point in further effort. Likewise, if a test sample is
very noisy, there isn't any point in maximizing emissions. It is only when
something is just passing that it is important to take time to move the
cables to maximize emissions. It is precisely here, that to the test
customer, it appears the test house is spending his money (time to
manipulate cables and scan and re-scan) to fail him.

A much better approach was promoted about thirty years ago by a European EMC
engineer named Balint Szentkuti: control cable common mode emissions over
the 30 - 1000 MHz band, perhaps using the absorbing clamp to give better
accuracy at these frequencies than a current probe. The limit, in dBuA,
would be derived to yield the radiated emission limit at three or ten meters
based on a perfectly maximized cable radiation pattern.

Once that test had been performed and passed, it would be on to the radiated
emission test, where cable manipulation would no longer be part of the test
regime, and any emissions in excess of the limit could be dealt with by
looking at the test sample enclosure and or the circuitry within.
 
Ken Javor

Phone: (256) 650-5261


 From: John Woodgate j...@jmwa.demon.co.uk
 Date: Tue, 10 Aug 2010 22:33:13 +0100
 To: emc-p...@ieee.org
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 In message c8872923.84265%ken.ja...@emccompliance.com, dated Tue, 10
 Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:
 
 That is all background.  The unalterable fact, regardless of how MU has
 been misapplied and perverted, is that it applies to the measurement
 facility itself; something that inherently will have an uncertainty on
 the order of several dB. It does not apply to things that can be
 measured to tenths of a dB, or are not even spec?d in dB, such as the
 modulation waveform of a signal generator, or its frequency accuracy.
 
 CISPR 16-4-1 appears to disagree, citing things like the height of the
 antenna and even 'routing of cables' as having uncertainty assessment
 applied to them (clause 4.2.4).
 -- 
 OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
 John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
 If at first you don't succeed, delegate.
 But I support unbloated email http://www.asciiribbon.org/
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
In message c8872923.84265%ken.ja...@emccompliance.com, dated Tue, 10 
Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:

That is all background.  The unalterable fact, regardless of how MU has 
been misapplied and perverted, is that it applies to the measurement 
facility itself; something that inherently will have an uncertainty on 
the order of several dB. It does not apply to things that can be 
measured to tenths of a dB, or are not even spec?d in dB, such as the 
modulation waveform of a signal generator, or its frequency accuracy.

CISPR 16-4-1 appears to disagree, citing things like the height of the 
antenna and even 'routing of cables' as having uncertainty assessment 
applied to them (clause 4.2.4).
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
This excerpt from Mr. Demirci‘s message below is the kernel of the issue:

“I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then, manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report.”

In the days of OATS and ANSI C63,4, an NSA correlation of +/- 4 dB sufficed. 
In the days of SACS and FACS, some sort of similar measurement is clearly
required. But this facility certification in no way extends to mundane
measurements that are made with an ordinary instrument such as an o’scope,
or handheld meter, or for that matter, an EMI receiver. Those measurements are
controlled by using a calibrated device, and even better, much better: the
measurement system integrity check in MIL-STD-461 in which a calibrated input
signal corresponding to a level 6 dB below the limit is applied at the
transducer end of the measurement system, and the EMI receiver must measure
that signal accurately within +/- 3 dB. That is the ultimate
“proof-of-the-pudding,” with the exception that it doesn’t account for
chamber effects for radiated emissions.

There are a couple reasons that military and automotive and commercial
aerospace EMI testing do not require measurement uncertainty. 

One is the ancient dictum, “If you can’t stand the answer, don’t ask the
question.” That is, we know a priori, before performing the exercise, that
one meter separation radiated measurements from an extended test set-up in an
imperfectly anechoic chamber are not going to result in pretty uncertainty
numbers.

The reason that this is ultimately acceptable goes back to the above excerpt
from the message below from Mr. Demirci.  In the commercial world, you must
EMI qualify before going to market.  In that case, you need all EMI test
facilities to be equal.  In the world of military, automotive and aerospace,
the EMI qualification is usually done as a collaborative effort between vendor
and customer, and is performed after a decision has been made that the
customer will do business with the vendor.

That is all background.  The unalterable fact, regardless of how MU has been
misapplied and perverted, is that it applies to the measurement facility
itself; something that inherently will have an uncertainty on the order of
several dB. It does not apply to things that can be measured to tenths of a
dB, or are not even spec’d in dB, such as the modulation waveform of a
signal generator, or its frequency accuracy.
 
Ken Javor

Phone: (256) 650-5261





From: Deniz Demirci deniz.demi...@ntscorp.com
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
List-Post: emc-pstc@listserv.ieee.org
Date: Tue, 10 Aug 2010 10:39:37 -0700
To: emc-p...@ieee.org
Conversation: Calibration supplier for signal generator with pulse modulation
Subject: RE: Calibration supplier for signal generator with pulse modulation

I guess the equipments in Apollo project hasn’t  only pass the tests with no
margin :-) They may have required quite a big margin so MU is not an issue at
all…   
Commercial world can be quite a bit different in that matter. They can’t
afford 10 dB margin.  
Has anyone seen a consumer electronic product will pass 10 dB Class B emission
 limits ?
 
I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then,  manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report. 
 
OOO (Own opinions only)
 
Best regards,
 
Deniz Demirci 
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations
http://www.ntscorp.com/about/locations
http://www.ntscorp.com/about/locations  

 

From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of
lfresea...@aol.com
Sent: Tuesday, August 10, 2010 11:07 AM
To: j...@jmwa.demon.co.uk; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation


HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently
opposed to MU in EMC measurements: the reason why is that end to end even 10
dB is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU
contributes is an academic exercise and lines pockets of
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts
are needed to address more important problems.



Just for the record, Automotive EMC does not require MU, US Military to not
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.




From: John Woodgate j...@jmwa.demon.co.uk

RE: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
. IT DOES NOT GIVE YOU ACCURATE NUMBERS.




That is the basis of MU, instead of not knowing how inaccurate,

nobody introduces MU for the sake of ACCURATE numbers, just to

define how INACCURATE they are.

CISPR16 get a range of obtainable inaccuracy, in practice +/- 6 dB (50-200%)

I admit, using a defined EUT only.

But +/- 6 dB is pretty compatible to your example of the jello.

And nobody said we’d introduce a micrometer accuracy instrument in EMC

by introducing MU.

 

For the low hanging fruit… regarding measurement methods…. please learn us 
something

 

Gert

 

Van: lfresea...@aol.com [mailto:lfresea...@aol.com] 
Verzonden: dinsdag 10 augustus 2010 21:16
Aan: ce-test, qualified testing bv - Gert Gremmen; j...@jmwa.demon.co.uk; 
emc-p...@ieee.org
Onderwerp: Re: Calibration supplier for signal generator with pulse modulation

 

Hi Gert,

I think you would be better saying MU muddies the water on what you might be 
measuring. IT DOES NOT GIVE YOU ACCURATE NUMBERS.

Anyone that thinks EMC is metrology, especially when they only focus on a small 
part of the big picture, is unnecessary adding cost and complexity to a 
measurement process.

Can anyone put their hand on their heart and say +/-10 db on an OATS really 
makes a difference in use? What about complying with a limit when there's never 
going to be anything in the are to be interfered with?

 

Before MU needs to be used in EMC, there are many other low hanging fruit to 
pick first with much better payback in cost reductions or reproducibility.

I like the measure jello with a micrometer analogy

Cheers,

Derek. 

 


From: ce-test, qualified testing bv - Gert Gremmen g.grem...@cetest.nl
To: lfresea...@aol.com; j...@jmwa.demon.co.uk; emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 12:34 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation

MU is of course the only way of knowing what you do/measure and ultimately test.

 

But if it need to be taken into account…. is another story.

But if you do not know  where your errors are, I guess

you can better stop measuring.

 

In most metrological approaches only the hardware measurement chain

is evaluated (antenna-cabling-measuring device), and  default value 

is used for the transfer between EUT through OATS/SAR/FAR.

And –as all of you know- the EMC community itself came up

with a MU criterion (sort of) for that:  the Normalized  Site Attenuation with

it’s +/4 dB margins (using a well defined simple source)

This can be combined with the standard uncertainty of your measurement

chain to get a total MU value. Most calcs result in 4-6 dB of MU

More can be found in the appropriate part of CISPR 16 (part -4-2) of

which I don’t have the exact reference at hand… someone ??

 

Gert Gremmen

ce-test, qualified testing bv

 

 

 

Van: emc-p...@ieee.org mailto:emc-p...@ieee.org  [mailto:emc-p...@ieee.org 
mailto:emc-p...@ieee.org? ] Namens lfresea...@aol.com 
mailto:lfresea...@aol.com 
Verzonden: dinsdag 10 augustus 2010 19:07
Aan: j...@jmwa.demon.co.uk mailto:j...@jmwa.demon.co.uk ; emc-p...@ieee.org 
mailto:emc-p...@ieee.org 
Onderwerp: Re: Calibration supplier for signal generator with pulse modulation

 

HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently 
opposed to MU in EMC measurements: the reason why is that end to end even 10 dB 
is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU 
contributes is an academic exercise and lines pockets of 
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts 
are needed to address more important problems.

 

Just for the record, Automotive EMC does not require MU, US Military to not 
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt 
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.

 


From: John Woodgate j...@jmwa.demon.co.uk mailto:j...@jmwa.demon.co.uk 
To: emc-p...@ieee.org mailto:emc-p...@ieee.org 
Sent: Tue, Aug 10, 2010 11:46 am
Subject: Re: Calibration supplier for signal generator with pulse modulation

In message c886e31f.841a0%ken.ja...@emccompliance.com 
mailto:ken.ja...@emccompliance.com , dated Tue, 10 Aug 2010, Ken Javor 
ken.ja...@emccompliance.com mailto:ken.ja...@emccompliance.com  writes: 
 
Uncertainty for modulation parameters of depth or pulse on-off ratio and time 
duration? Uncertainty applies to things like field intensity, where the 
construction of the room or OATS and near field effects combine to provide 
significant uncertainty. 
 
But something easily measured with an o'scope of modest (audio) performance? 
That is a totally unwarranted extension of the concept. 
 
Unfortunately, it isn't. The metrologists have inflicted formal uncertainty 
assessment on us and it's like death and taxes - always with us. Everything has 
to have its uncertainty assessed

Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Hi Gert,

I think you would be better saying MU muddies the water on what you might be 
measuring. IT DOES NOT GIVE YOU ACCURATE NUMBERS.

Anyone that thinks EMC is metrology, especially when they only focus on a small 
part of the big picture, is unnecessary adding cost and complexity to a 
measurement process.

Can anyone put their hand on their heart and say +/-10 db on an OATS really 
makes a difference in use? What about complying with a limit when there's never 
going to be anything in the are to be interfered with?


Before MU needs to be used in EMC, there are many other low hanging fruit to 
pick first with much better payback in cost reductions or reproducibility.

I like the measure jello with a micrometer analogy

Cheers,

Derek. 



From: ce-test, qualified testing bv - Gert Gremmen g.grem...@cetest.nl
To: lfresea...@aol.com; j...@jmwa.demon.co.uk; emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 12:34 pm
Subject: RE: Calibration supplier for signal generator with pulse modulation


MU is of course the only way of knowing what you do/measure and ultimately test.
 
But if it need to be taken into account…. is another story.
But if you do not know  where your errors are, I guess
you can better stop measuring.
 
In most metrological approaches only the hardware measurement chain
is evaluated (antenna-cabling-measuring device), and  default value 
is used for the transfer between EUT through OATS/SAR/FAR.
And –as all of you know- the EMC community itself came up
with a MU criterion (sort of) for that:  the Normalized  Site Attenuation with
it’s +/4 dB margins (using a well defined simple source)
This can be combined with the standard uncertainty of your measurement
chain to get a total MU value. Most calcs result in 4-6 dB of MU
More can be found in the appropriate part of CISPR 16 (part -4-2) of
which I don’t have the exact reference at hand… someone ??
 
Gert Gremmen
ce-test, qualified testing bv
 
 
 
Van: emc-p...@ieee.org [mailto:emc-p...@ieee.org mailto:emc-p...@ieee.org? ] 
Namens lfresea...@aol.com
Verzonden: dinsdag 10 augustus 2010 19:07
Aan: j...@jmwa.demon.co.uk; emc-p...@ieee.org
Onderwerp: Re: Calibration supplier for signal generator with pulse modulation
 
HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently 
opposed to MU in EMC measurements: the reason why is that end to end even 10 dB 
is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU 
contributes is an academic exercise and lines pockets of 
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts 
are needed to address more important problems.
 
Just for the record, Automotive EMC does not require MU, US Military to not 
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt 
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.
 

From: John Woodgate j...@jmwa.demon.co.uk
To: emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 11:46 am
Subject: Re: Calibration supplier for signal generator with pulse modulation
In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10 Aug 
2010, Ken Javor ken.ja...@emccompliance.com writes: 
 
Uncertainty for modulation parameters of depth or pulse on-off ratio and time 
duration? Uncertainty applies to things like field intensity, where the 
construction of the room or OATS and near field effects combine to provide 
significant uncertainty. 
 
But something easily measured with an o'scope of modest (audio) performance? 
That is a totally unwarranted extension of the concept. 
 
Unfortunately, it isn't. The metrologists have inflicted formal uncertainty 
assessment on us and it's like death and taxes - always with us. Everything has 
to have its uncertainty assessed. 
-- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk 
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK 
If at first you don't succeed, delegate. 
But I support unbloated email http://www.asciiribbon.org/ 
 
- 
 
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
emc-p...@ieee.org 
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 
Graphics (in well-used formats), large files, etc. can be posted to that URL. 
 
Website: http://www.ieee-pses.org/ 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators: 
Scott Douglas emcp...@socal.rr.com 
Mike Cantwell mcantw...@ieee.org 
 
For policy questions, send mail to: 
Jim Bacher: j.bac...@ieee.org 
David Heald: dhe...@gmail.com 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc

Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
In message 8cd06c5a43f24be-12a8-...@webmail-m087.sysops.aol.com, dated 
Tue, 10 Aug 2010, lfresea...@aol.com writes:

just stressing Ken's use of the word unwarranted. I'm personally 
vehemently opposed to MU in EMC measurements: the reason why is that 
end to end even 10 dB is a trivial error...

I entirely agree. I have defined the term 'measuring jelly (Jello) with 
a micrometer' to describe the application of MU to EMC.

Just because the Stds committee says so does not make it warranted. All 
MU contributes is an academic exercise and lines pockets of 
individuals/organizations pushing it.

Agreed.

We as an EMC community need to push back and say enough already. Our 
efforts are needed to address more important problems.

But ISO, IEC and CISPR have accepted it and I doubt that it can be 
eradicated now.

Just for the record, Automotive EMC does not require MU, US Military to 
not require MU. If MU wasn't needed to put a man on the moon it sure as 
heck isnt needed in washing machines, computers etc.

You make a strong point. Now make it to ANSI and the IEEE and see 
whether the might of the USA standards bodies can convince ISO and IEC 
to re-think (or even to think, never mind the 're'!).
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


RE: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
I guess the equipments in Apollo project hasn’t  only pass the tests with no
margin J They may have required quite a big margin so MU is not an issue at
all…   

Commercial world can be quite a bit different in that matter. They can’t
afford 10 dB margin.  

Has anyone seen a consumer electronic product will pass 10 dB Class B emission
 limits ?

 

I believe a proper measurement uncertainty assessment will decrease the
different measurement / test results between accredited laboratories for the
same product. Then,  manufacturer / designer will not shop for a laboratory
which he / she will get an easy pass test report. 

 

OOO (Own opinions only)

 

Best regards,

 

Deniz Demirci 

National Technical Systems (NTS Canada)

Phone: 403-568-6605 ext 244

fax: 403-568-6970

email:deniz.demi...@ntscorp.com

web: http://www.ntscorp.com/about/locations
http://www.ntscorp.com/about/locations 

 

 

From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of
lfresea...@aol.com
Sent: Tuesday, August 10, 2010 11:07 AM
To: j...@jmwa.demon.co.uk; emc-p...@ieee.org
Subject: Re: Calibration supplier for signal generator with pulse modulation

 

HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently
opposed to MU in EMC measurements: the reason why is that end to end even 10
dB is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU
contributes is an academic exercise and lines pockets of
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts
are needed to address more important problems.

 

Just for the record, Automotive EMC does not require MU, US Military to not
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.

 


From: John Woodgate j...@jmwa.demon.co.uk
To: emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 11:46 am
Subject: Re: Calibration supplier for signal generator with pulse modulation

In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10 Aug
2010, Ken Javor ken.ja...@emccompliance.com writes: 
 
Uncertainty for modulation parameters of depth or pulse on-off ratio and
time duration? Uncertainty applies to things like field intensity, where the
construction of the room or OATS and near field effects combine to provide
significant uncertainty. 
 
But something easily measured with an o'scope of modest (audio) performance?
That is a totally unwarranted extension of the concept. 
 
Unfortunately, it isn't. The metrologists have inflicted formal uncertainty
assessment on us and it's like death and taxes - always with us. Everything
has to have its uncertainty assessed. 
-- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk 
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK 
If at first you don't succeed, delegate. 
But I support unbloated email http://www.asciiribbon.org/ 
 
- 
 
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org 
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 
Graphics (in well-used formats), large files, etc. can be posted to that URL. 
 
Website: http://www.ieee-pses.org/ 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators: 
Scott Douglas emcp...@socal.rr.com 
Mike Cantwell mcantw...@ieee.org 
 
For policy questions, send mail to: 
Jim Bacher: j.bac...@ieee.org 
David Heald: dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user

RE: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
MU is of course the only way of knowing what you do/measure and ultimately
test.

 

But if it need to be taken into account…. is another story.

But if you do not know  where your errors are, I guess

you can better stop measuring.

 

In most metrological approaches only the hardware measurement chain

is evaluated (antenna-cabling-measuring device), and  default value 

is used for the transfer between EUT through OATS/SAR/FAR.

And –as all of you know- the EMC community itself came up

with a MU criterion (sort of) for that:  the Normalized  Site Attenuation with

it’s +/4 dB margins (using a well defined simple source)

This can be combined with the standard uncertainty of your measurement

chain to get a total MU value. Most calcs result in 4-6 dB of MU

More can be found in the appropriate part of CISPR 16 (part -4-2) of

which I don’t have the exact reference at hand… someone ??

 

Gert Gremmen

ce-test, qualified testing bv

 

 

 

Van: emc-p...@ieee.org [mailto:emc-p...@ieee.org] Namens lfresea...@aol.com
Verzonden: dinsdag 10 augustus 2010 19:07
Aan: j...@jmwa.demon.co.uk; emc-p...@ieee.org
Onderwerp: Re: Calibration supplier for signal generator with pulse modulation

 

HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently
opposed to MU in EMC measurements: the reason why is that end to end even 10
dB is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU
contributes is an academic exercise and lines pockets of
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts
are needed to address more important problems.

 

Just for the record, Automotive EMC does not require MU, US Military to not
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.

 


From: John Woodgate j...@jmwa.demon.co.uk
To: emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 11:46 am
Subject: Re: Calibration supplier for signal generator with pulse modulation

In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10 Aug
2010, Ken Javor ken.ja...@emccompliance.com writes: 
 
Uncertainty for modulation parameters of depth or pulse on-off ratio and
time duration? Uncertainty applies to things like field intensity, where the
construction of the room or OATS and near field effects combine to provide
significant uncertainty. 
 
But something easily measured with an o'scope of modest (audio) performance?
That is a totally unwarranted extension of the concept. 
 
Unfortunately, it isn't. The metrologists have inflicted formal uncertainty
assessment on us and it's like death and taxes - always with us. Everything
has to have its uncertainty assessed. 
-- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk 
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK 
If at first you don't succeed, delegate. 
But I support unbloated email http://www.asciiribbon.org/ 
 
- 
 
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org 
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 
Graphics (in well-used formats), large files, etc. can be posted to that URL. 
 
Website: http://www.ieee-pses.org/ 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators: 
Scott Douglas emcp...@socal.rr.com 
Mike Cantwell mcantw...@ieee.org 
 
For policy questions, send mail to: 
Jim Bacher: j.bac...@ieee.org 
David Heald: dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org

Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
HI John,

just stressing Ken's use of the word unwarranted. I'm personally vehemently
opposed to MU in EMC measurements: the reason why is that end to end even 10
dB is a trivial error...

Just because the Stds committee says so does not make it warranted. All MU
contributes is an academic exercise and lines pockets of
individuals/organizations pushing it.

We as an EMC community need to push back and say enough already. Our efforts
are needed to address more important problems.


Just for the record, Automotive EMC does not require MU, US Military to not
require MU. If MU wasn't needed to put a man on the moon it sure as heck isnt
needed in washing machines, computers etc.

I'm guessing this is more than 10 cents worth!

Derek Walton
L F Research.



From: John Woodgate j...@jmwa.demon.co.uk
To: emc-p...@ieee.org
Sent: Tue, Aug 10, 2010 11:46 am
Subject: Re: Calibration supplier for signal generator with pulse modulation


In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10 Aug
2010, Ken Javor ken.ja...@emccompliance.com writes: 
 
Uncertainty for modulation parameters of depth or pulse on-off ratio and
time duration? Uncertainty applies to things like field intensity, where the
construction of the room or OATS and near field effects combine to provide
significant uncertainty. 
 
But something easily measured with an o'scope of modest (audio) performance?
That is a totally unwarranted extension of the concept. 
 
Unfortunately, it isn't. The metrologists have inflicted formal uncertainty
assessment on us and it's like death and taxes - always with us. Everything
has to have its uncertainty assessed. 
-- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk 
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK 
If at first you don't succeed, delegate. 
But I support unbloated email http://www.asciiribbon.org/ 
 
- 
 
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org 
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 
Graphics (in well-used formats), large files, etc. can be posted to that URL. 
 
Website: http://www.ieee-pses.org/ 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators: 
Scott Douglas emcp...@socal.rr.com 
Mike Cantwell mcantw...@ieee.org 
 
For policy questions, send mail to: 
Jim Bacher: j.bac...@ieee.org 
David Heald: dhe...@gmail.com 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org 

For policy questions, send mail to:
Jim Bacher j.bac...@ieee.org
David Heald dhe...@gmail.com 




Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Regardless of what has been done, it is still technically unwarranted.
 
Ken Javor

Phone: (256) 650-5261


 From: John Woodgate j...@jmwa.demon.co.uk
 Date: Tue, 10 Aug 2010 17:46:08 +0100
 To: emc-p...@ieee.org
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10
 Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:
 
 Uncertainty for modulation parameters of depth or pulse on-off ratio
 and time duration?  Uncertainty applies to things like field intensity,
 where the construction of the room or OATS and near field effects
 combine to provide significant uncertainty.
 
 But something easily measured with an o'scope of modest (audio)
 performance? That is a totally unwarranted extension of the concept.
 
 Unfortunately, it isn't. The metrologists have inflicted formal
 uncertainty assessment on us and it's like death and taxes - always with
 us. Everything has to have its uncertainty assessed.
 -- 
 OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
 John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
 If at first you don't succeed, delegate.
 But I support unbloated email http://www.asciiribbon.org/
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
In message c886e31f.841a0%ken.ja...@emccompliance.com, dated Tue, 10 
Aug 2010, Ken Javor ken.ja...@emccompliance.com writes:

Uncertainty for modulation parameters of depth or pulse on-off ratio 
and time duration?  Uncertainty applies to things like field intensity, 
where the construction of the room or OATS and near field effects 
combine to provide significant uncertainty.

But something easily measured with an o'scope of modest (audio) 
performance? That is a totally unwarranted extension of the concept.

Unfortunately, it isn't. The metrologists have inflicted formal 
uncertainty assessment on us and it's like death and taxes - always with 
us. Everything has to have its uncertainty assessed.
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
If at first you don't succeed, delegate.
But I support unbloated email http://www.asciiribbon.org/

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Uncertainty for modulation parameters of depth or pulse on-off ratio and
time duration?  Uncertainty applies to things like field intensity, where
the construction of the room or OATS and near field effects combine to
provide significant uncertainty.

But something easily measured with an o'scope of modest (audio) performance?
That is a totally unwarranted extension of the concept.
 
Ken Javor

Phone: (256) 650-5261


 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Tue, 10 Aug 2010 08:55:27 -0700
 To: Ken Javor ken.ja...@emccompliance.com, Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 Is there an acceptable method in any immunity standards, or the tolerance
 specified anywhere for checking the modulation?
 You need to come up with an uncertainty number if you are performing a
 compliance test.
 It should be pretty painful if you are not a ISO 17025 calibration
laboratory.
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci 
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
 Sent: Tuesday, August 10, 2010 9:39 AM
 To: Untitled
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 Amplitude and pulse modulation parameters are adequately checked with a
 calibrated o'scope.
 
 And even frequency could be checked with your EMI receiver, assuming it is
 calibrated.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Tue, 10 Aug 2010 08:30:17 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse
modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 The amplitude of signal source may not need calibration because you
calibrate
 the field at the end with calibrated probes.
 You should at least check or get the signal generator calibrated if your
 verification procedure is not checking (characterizing) the modulation.
 EN 61000-4-3 gives some hints about amplitude modulation but the other
 modulation types can be difficult to measure (Pulse, burst, phase etc.)
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
 Sent: Tuesday, August 10, 2010 7:05 AM
 To: Wendy Nya; Untitled
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 Why would the signal source need calibration? Normally, it is the signal
 measurement devices that require calibration. Further, this signal source
 likely requires some amplification in order to provide the required signal
 for EMI testing, so that it is the amplified output which must be measured,
 not the signal generator itself.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent
(it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
 to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
   
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that
 URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org

RE: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Is there an acceptable method in any immunity standards, or the tolerance
specified anywhere for checking the modulation?
You need to come up with an uncertainty number if you are performing a
compliance test.
It should be pretty painful if you are not a ISO 17025 calibration laboratory.

OOO (Own opinions only)

Best regards,

Deniz Demirci 
National Technical Systems (NTS Canada)
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations




From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
Sent: Tuesday, August 10, 2010 9:39 AM
To: Untitled
Subject: Re: Calibration supplier for signal generator with pulse modulation

Amplitude and pulse modulation parameters are adequately checked with a
calibrated o'scope.

And even frequency could be checked with your EMI receiver, assuming it is
calibrated.
 
Ken Javor

Phone: (256) 650-5261


 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Tue, 10 Aug 2010 08:30:17 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 The amplitude of signal source may not need calibration because you calibrate
 the field at the end with calibrated probes.
 You should at least check or get the signal generator calibrated if your
 verification procedure is not checking (characterizing) the modulation.
 EN 61000-4-3 gives some hints about amplitude modulation but the other
 modulation types can be difficult to measure (Pulse, burst, phase etc.)
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
 Sent: Tuesday, August 10, 2010 7:05 AM
 To: Wendy Nya; Untitled
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 Why would the signal source need calibration? Normally, it is the signal
 measurement devices that require calibration. Further, this signal source
 likely requires some amplification in order to provide the required signal
 for EMI testing, so that it is the amplified output which must be measured,
 not the signal generator itself.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
 to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
   
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that
URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org

Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Amplitude and pulse modulation parameters are adequately checked with a
calibrated o'scope.

And even frequency could be checked with your EMI receiver, assuming it is
calibrated.
 
Ken Javor

Phone: (256) 650-5261


 From: Deniz Demirci deniz.demi...@ntscorp.com
 Date: Tue, 10 Aug 2010 08:30:17 -0700
 To: Untitled emc-p...@ieee.org
 Conversation: Calibration supplier for signal generator with pulse modulation
 Subject: RE: Calibration supplier for signal generator with pulse modulation
 
 The amplitude of signal source may not need calibration because you calibrate
 the field at the end with calibrated probes.
 You should at least check or get the signal generator calibrated if your
 verification procedure is not checking (characterizing) the modulation.
 EN 61000-4-3 gives some hints about amplitude modulation but the other
 modulation types can be difficult to measure (Pulse, burst, phase etc.)
 
 OOO (Own opinions only)
 
 Best regards,
 
 Deniz Demirci
 National Technical Systems (NTS Canada)
 Phone: 403-568-6605 ext 244
 fax: 403-568-6970
 email:deniz.demi...@ntscorp.com
 web: http://www.ntscorp.com/about/locations
 
 -Original Message-
 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
 Sent: Tuesday, August 10, 2010 7:05 AM
 To: Wendy Nya; Untitled
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 Why would the signal source need calibration? Normally, it is the signal
 measurement devices that require calibration. Further, this signal source
 likely requires some amplification in order to provide the required signal
 for EMI testing, so that it is the amplified output which must be measured,
 not the signal generator itself.
  
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
 to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
   
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that
URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc

RE: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
The amplitude of signal source may not need calibration because you calibrate
the field at the end with calibrated probes. 
You should at least check or get the signal generator calibrated if your
verification procedure is not checking (characterizing) the modulation. 
EN 61000-4-3 gives some hints about amplitude modulation but the other
modulation types can be difficult to measure (Pulse, burst, phase etc.)

OOO (Own opinions only)

Best regards,

Deniz Demirci
National Technical Systems (NTS Canada)   
 
Phone: 403-568-6605 ext 244
fax: 403-568-6970
email:deniz.demi...@ntscorp.com
web: http://www.ntscorp.com/about/locations


From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Ken Javor
Sent: Tuesday, August 10, 2010 7:05 AM
To: Wendy Nya; Untitled
Subject: Re: Calibration supplier for signal generator with pulse modulation

Why would the signal source need calibration? Normally, it is the signal
measurement devices that require calibration. Further, this signal source
likely requires some amplification in order to provide the required signal
for EMI testing, so that it is the amplified output which must be measured,
not the signal generator itself.
 
Ken Javor

Phone: (256) 650-5261


 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
   
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Given your list of equipment, the only thing you should need to calibrate
about the signal source is the frequency accuracy.
 
Ken Javor

Phone: (256) 650-5261


 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 06:17:17 -0700 (PDT)
 To: Ken Javor ken.ja...@emccompliance.com, Untitled emc-p...@ieee.org
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 
 
 In Radiated Immunity, the amplifier output is not calibrated. Rather it is
the
 signal generator, power meter, power heads and field probe.
 
 - Original Message 
 From: Ken Javor ken.ja...@emccompliance.com
 To: Wendy Nya wendy...@yahoo.com; Untitled emc-p...@ieee.org
 Sent: Tue, 10 August, 2010 21:04:33
 Subject: Re: Calibration supplier for signal generator with pulse modulation
 
 Why would the signal source need calibration? Normally, it is the signal
 measurement devices that require calibration. Further, this signal source
 likely requires some amplification in order to provide the required signal
 for EMI testing, so that it is the amplified output which must be measured,
 not the signal generator itself.
 
 Ken Javor
 
 Phone: (256) 650-5261
 
 
 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
 to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
       
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that
URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com
 
 
 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
In Radiated Immunity, the amplifier output is not calibrated. Rather it is the 
signal generator, power meter, power heads and field probe.


From: Ken Javor ken.ja...@emccompliance.com
To: Wendy Nya wendy...@yahoo.com; Untitled emc-p...@ieee.org
Sent: Tue, 10 August, 2010 21:04:33
Subject: Re: Calibration supplier for signal generator with pulse modulation

Why would the signal source need calibration? Normally, it is the signal
measurement devices that require calibration. Further, this signal source
likely requires some amplification in order to provide the required signal
for EMI testing, so that it is the amplified output which must be measured,
not the signal generator itself.

Ken Javor

Phone: (256) 650-5261


 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
      
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com


  

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com


Re: Calibration supplier for signal generator with pulse modulation

2010-08-10 Thread emc-p...@ieee.org
Why would the signal source need calibration? Normally, it is the signal
measurement devices that require calibration. Further, this signal source
likely requires some amplification in order to provide the required signal
for EMI testing, so that it is the amplified output which must be measured,
not the signal generator itself.
 
Ken Javor

Phone: (256) 650-5261


 From: Wendy Nya wendy...@yahoo.com
 Date: Tue, 10 Aug 2010 01:23:29 -0700 (PDT)
 To: emc-p...@ieee.org
 Subject: Calibration supplier for signal generator with pulse modulation
 
 Dear All,
 
 I am looking for a calibration supplier that can provide accredited service
 for 
 AR SG6000. It has built-in pulse modulation option (for Radiated Immunity
 use).
 
 By the way - Is anyone using this model? It seems to be OEM from Agilent (it
 came in an agilent box) but the equipment is marked AR
 and works with Agilent N5181A driver. Agilent is saying that it is not able
to
 provide accredited calibration service for this model.
 
 Thanks  Regards,
 Wendy Nya
 
 
   
 
 -
 
 This message is from the IEEE Product Safety Engineering Society emc-pstc
 discussion list. To post a message to the list, send your e-mail to
 emc-p...@ieee.org
 
 All emc-pstc postings are archived and searchable on the web at:
 http://www.ieeecommunities.org/emc-pstc
 Graphics (in well-used formats), large files, etc. can be posted to that URL.
 
 Website:  http://www.ieee-pses.org/
 Instructions:  http://listserv.ieee.org/request/user-guide.html
 List rules: http://www.ieee-pses.org/listrules.html
 
 For help, send mail to the list administrators:
 Scott Douglas emcp...@socal.rr.com
 Mike Cantwell mcantw...@ieee.org
 
 For policy questions, send mail to:
 Jim Bacher:  j.bac...@ieee.org
 David Heald: dhe...@gmail.com

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
emc-p...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas emcp...@socal.rr.com
Mike Cantwell mcantw...@ieee.org

For policy questions, send mail to:
Jim Bacher:  j.bac...@ieee.org
David Heald: dhe...@gmail.com