Thanks Auld.Timer. The power tracks are a real hassle when you discover from the DRC you've missed out a via and you have to start shunting things around.
BTW, I'm getting (non-power) nodes that the DRC reports are not connected but which most assuredly are (I've even relaid the relevant tracks)... Regards, Robert. ron brown wrote: > Robert, > > Thanks for the reply. Power and ground on a two layer can be a > challenge, especially if you have to do it last. Good luck. > > Auld.Timer -- No virus found in this outgoing message. Checked by AVG Free Edition. Version: 7.5.485 / Virus Database: 269.13.6/991 - Release Date: 9/5/2007 14:55
