Didn't Gamberale change the instrumentation in the DGT test that DGT put
back?

On Mon, May 16, 2016 at 4:25 PM, Jed Rothwell <jedrothw...@gmail.com> wrote:

> Axil Axil <janap...@gmail.com> wrote:
>
>
>> Doctoring of the instrumentation connected to the reactor under test
>> could have been done by either party. The only way to verify valid
>> instrumentation performance is through sealing it and getting post test
>> calibration performed by the manufacture.
>>
>
> That is nonsense. You can verify the instrumentation in 10 minutes using a
> hand-held thermocouple, a bucket and a weight scale. I have done that many
> times. It is a piece of cake.
>
> When I said I would do that with Rossi's original tests he immediately
> uninvited me. When I said I would do that at Defkalion, they immediately
> uninvited me. A pattern emerges . . . When Gamberale finally did that
> later, he immediately saw that the flowmeter was set up incorrectly and the
> test results were wrong. There was no excess heat.
>
> - Jed
>
>

Reply via email to