List of EIP per China RoHS in English

2006-03-25 Thread Grace Lin
version has been posted by the Ministry of Informaiton Industry at http://www.mii.gov.cn/art/2006/03/16/art_722_8442.html http://www.mii.gov.cn/art/2006/03/16/art_722_8442.html. Best regards, Grace Lin Grace Compliance Specialist New Jersey, USA grace...@graspllc.com www.graspllc.com

[PSES] Protect An EMI Receiver

2011-12-27 Thread Grace Lin
below 150kHz? If yes, could you please refer me one? Thank you very much for your time and look forward to your advice. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion

Re: [PSES] Protect An EMI Receiver

2011-12-28 Thread Grace Lin
Tue, 27 Dec 2011, Grace Lin graceli...@gmail.com writes: Hi, Grace. I need your advice to prevent RS ESU receiver from damage. A service report (as a result of annual calibration) indicates frequency response out of specification below 10MHz. Adjusted frequency response. Adjusted

[PSES] Biconical Antenna Location During NSA for Off-Center Positions

2012-01-12 Thread Grace Lin
the chamber was built four years ago. Thank you very much and look forward to your comments. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message

Re: [PSES] [***] Biconical Antenna Location During NSA for Off-Center Positions

2012-01-13 Thread Grace Lin
NSA for Off-Center Positions In message CAJq2vagRL0G4aQuE=fyh7mqo-32jhnawkrndod2465zyr79...@mail.gmail.com, dated Thu, 12 Jan 2012, Grace Lin graceli...@gmail.com writes: . I cannot remember how NSA was performed when the chamber was built four years ago I can't answer your question

Re: [PSES] CCC mark on a router

2012-01-19 Thread Grace Lin
A broadband router (宽带路由器) is not under the scope of CCC, according to a document, 关于印发《〈第一批实施强制性产品认证的产品目录〉中部分产品详细适用范围》的通知 国认证[2003]46号, published by Chinese government on August 12, 2003. On Tue, Jan 17, 2012 at 2:10 PM, Christopher cksal...@yahoo.com wrote: Folks, is it necessary to have

[PSES] Transmitter Modular Approval in Korea

2012-01-27 Thread Grace Lin
/http://www.nwemc.com/news/2011/02/18/korea-rra-announces-new-emc-regulations-including-new-kc-mark/ ). Can someone confirm it and instruct how it works? Is it similar to the US (an end product labels Contains FCC ID: (the module's ID number)? Thank you very much. Best regards, Grace Lin

[PSES] Instrument for telecommunication port measurement per CISPR 22

2012-02-14 Thread Grace Lin
regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p...@ieee.org All emc-pstc postings are archived and searchable

[PSES] Isolation Transformers

2012-02-14 Thread Grace Lin
conducted emission outside of a shielded room. Thank you very much for your time and look forward to your comments. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list

Re: [PSES] Isolation Transformers

2012-02-14 Thread Grace Lin
of compliance testing. Please share your problem with us, I am really curious…. ** ** Gert Gremmen ** ** *Van:* emc-p...@ieee.org [mailto:emc-p...@ieee.org] *Namens *Grace Lin *Verzonden:* dinsdag 14 februari 2012 17:07 *Aan:* emc-p...@ieee.org *Onderwerp:* Isolation Transformers

Re: [PSES] FCC - Intentional Radiators, Restricted Bands and 960 MHz

2012-02-15 Thread Grace Lin
may wish to look the report under FCC ID: EROCWD6660 or FCC ID: EROCWD6782. These two applications were granted by the FCC. Conducted measurement was used to take -20dBc data (screen captures). With regards, Grace Lin On Wed, Feb 15, 2012 at 5:46 AM, Pawson, James james.paw...@echostar.comwrote

[PSES] EN/IEC Safety Standards for a Power Meter Control Unit

2012-03-01 Thread Grace Lin
. Thank you very much and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p

[PSES] Test Setup for a Display Powered by a PoE Injector

2012-04-04 Thread Grace Lin
and LAN. PoE LAN port connects to the EUT. Need the LAN port of PoE injector be connected to LAN? 3. Need the LAN port of PoE injector be exercised? If yes, is Ping command good enough? Thank you very much for your time and look forward to hearing from you. Best regards, Grace Lin

Re: [PSES] FCC - Frequency Range of Investigation for Intentional Radiator

2012-04-12 Thread Grace Lin
15.33 (b) (1) use the 5th harmonic. * With regards, Grace Lin On Mon, Apr 9, 2012 at 12:01 PM, Larry Stillings la...@complianceworldwide.com wrote: ** Hello All, I need clarification on the following. If a wireless device, in this case a Zigbee transceiver uses a 16 MHz

[PSES] AC Power Adapter, IEC 60065 vs IEC 60950-1

2012-04-12 Thread Grace Lin
60950-1, not IEC 60065. The lab requests an IEC 60065 CB certificate for the power adapter (OEM). Thank you very much and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety

Re: [PSES] AC Power Adapter, IEC 60065 vs IEC 60950-1

2012-04-12 Thread Grace Lin
Of *Grace Lin *Sent:* Thursday, April 12, 2012 4:52 AM *To:* emc-p...@ieee.org *Subject:* AC Power Adapter, IEC 60065 vs IEC 60950-1 Dear Members, Can an IEC 60950-1 power adapter be used with an IEC 60065 device? Two of my collleagues told me yes. However, they couldn't find any

[PSES] Compliance Statement in French Language

2012-05-16 Thread Grace Lin
. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p...@ieee.org All emc-pstc postings are archived

Re: [PSES] Compliance Statement in French Language

2012-05-16 Thread Grace Lin
Thank you very much for those who helped. The translation of Compliance Statement in French is Déclaration de conformité. On Wed, May 16, 2012 at 11:13 AM, Grace Lin graceli...@gmail.com wrote: Dear Members, If you know French, could you please provide me with Compliance Statement in French

[PSES] When Did FCC Start Regulating FCC Part 15

2012-06-11 Thread Grace Lin
Dear Members, I am asked to find out when FCC started regulating FCC Part 15 devices, such as a garage door opener. Can anyone help me with the answer? Thank you very much. Best regards, Grace Lin - This message is from the IEEE

Re: [PSES] ETL Listed/certification

2012-06-12 Thread Grace Lin
ETL is owned by Intertek. Go to www.intertek.com. Or call the Duluth, Georgia's office at 678-775-2400 and ask the office number that you would like to work with. ETL is the number 2 safety mark in the US, next to UL. Some countries accept only ETL mark. On Tue, Jun 12, 2012 at 1:52 AM,

Re: [PSES] Chinese UL?

2012-06-19 Thread Grace Lin
, not 60950-1 for ITE) for the OEM power supply are available from the vendor. Or, it will take forever to complete the CCC process. With regards, Grace Lin On Mon, Jun 18, 2012 at 8:00 PM, McInturff, Gary gary.mcintu...@esterline.com wrote: Does CCC handle medical products – large X-ray

Re: [PSES] OATS vs FAR Radiated Emissions Limits

2012-10-18 Thread Grace Lin
James, please find the following Class B radiated emissions limits from CISPR 32 @ IEC:2012 for your reference. Thank you. -Grace Table A.4 - Requirements for radiated emissions at frequencies *up to 1 GHz*for Class B equipment Table clause: A4.1, Frequency range MHz: 30 - 230, Measurement

Re: [PSES] FCC IC and Product Information

2013-01-30 Thread Grace Lin
In my experience, some TCBs do charge extra for confidentiality. -Grace Lin On Wed, Jan 30, 2013 at 12:15 AM, itl-emc user group itl...@itl.co.ilwrote: In my experience, TCB’s don’t charge extra for confidentiality unlike the FCC. I have not heard of short term confidentiality

Re: [PSES] Korea standards in English

2013-02-14 Thread Grace Lin
) are similar to the EU's. Best regards, Grace Lin On Wed, Feb 13, 2013 at 3:42 PM, David barid61...@yahoo.com wrote: All, I am trying to find a reliable source for Korean standards in English. So far I can only get them in Korean, then would have to pay to have them translated(which is quite

[PSES] EU Group

2013-03-08 Thread Grace Lin
Dear Members, Is EU Group an international recognized term? I reviewed a CB report with EU Group listed. I requested to have each individual country listed. The reply was additional USD400 charge. I cannot be convinced for the charge. Thank you very much. Best regards, Grace Lin

[PSES] Summary of compliance with National Differences

2013-03-21 Thread Grace Lin
Safety expert, how to tell if a country is covered in a CB report? Thank you very much and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc

Re: [PSES] Summary of compliance with National Differences

2013-03-21 Thread Grace Lin
(only) to the countries listed? For a non Safety expert, how to tell if a country is covered in a CB report? Thank you very much and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE

[PSES] RS ENV216 Two-Line V-Network Reference Ground

2013-03-28 Thread Grace Lin
of reference ground connection B is shown in a diagram under Section 3.10. There is some difficulty to follow the instructions in a semi-anechoic chamber. I look forward to hear from you. Setup photos are of great help. You may wish to reply offline. Thank you very much. Best regards, Grace Lin

[PSES] emtest CWS 500N1 Continuous Wave Simulator, 80W

2013-03-29 Thread Grace Lin
have to be aware of ? Thank you very much and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list

[PSES] 61000-4-6 Immunity Test Systems

2013-04-01 Thread Grace Lin
)*, at this time, there are two systems on my list: AR CI00250A ( http://www.arww-rfmicro.com/html/18200.asp?id=655) and Teseq NSG 4070 ( http://www.teseq.com/products/NSG-4070.php). Thank you very much and look forward to hearing from you. Best regards, Grace Lin

[PSES] IEC 61000-4-6 Ed 2.2, IEC 61000-4-6 Ed 3.0, and IEC 61000-4-6 Ed 4.0

2013-04-01 Thread Grace Lin
much for your time and look forward to your comments. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p

Re: [PSES] FCC adding channels to 5G band

2013-05-01 Thread Grace Lin
Please check Federal Register, dated April 10, 2013. https://www.federalregister.gov/articles/2013/04/10/2013-08033/unlicensed-national-information-infrastructure-u-nii-devices-in-the-5-ghz-band On Tue, Apr 30, 2013 at 12:05 PM, Grasso, Charles charles.gra...@echostar.com wrote: Hello

[PSES] CISPR 32

2013-07-11 Thread Grace Lin
Dear Members, When will be the (proposed) date CISPR 32 replaces CISPR 13 and CISPR 22? The first edition of CISPR 32 was published last year. It seems EU has not adopted it (so does all other countries I believe). Thank you very much. Best regards, Grace Lin

[PSES] Regulatory Statement per Japan MIC

2013-07-22 Thread Grace Lin
Dear Members, Is there any regulatory statement need to be included in the manual per Japan MIC for wireless products? Thank you very much. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering

[PSES] Fwd: Regulatory Statement per Japan MIC

2013-07-23 Thread Grace Lin
FYI. Our agent in Asia informs us there is no regulatory statement required for 2.4 GHz devices. -- Forwarded message -- From: Grace Lin graceli...@gmail.com Date: Mon, Jul 22, 2013 at 7:15 AM Subject: Regulatory Statement per Japan MIC To: emc-p...@ieee.org emc-p...@ieee.org

[PSES] Ground Plane Grounding in the Immunity Lab

2013-08-23 Thread Grace Lin
to be cautious? Thank you very much and look forward to your help. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail

Re: [PSES] Retest because of supersded standard?

2013-09-03 Thread Grace Lin
as the product rated 50W (not greater than 75W). I believe the process for the lab is similar to a simple update to the test report is all that is needed as Ghery stated. Best regards, Grace Lin On Fri, Aug 30, 2013 at 4:25 PM, Crane, Lauren lauren.cr...@kla-tencor.comwrote: Thanks for the helpful

EN50428 or EN60669-1 (and EN60669-2-1)

2008-05-05 Thread Grace Lin
Dear Members, For an electronic dimmer module, which standard(s) applies: EN50428 or EN60669-1 (and EN60669-2-1)? I list the title of standards below for reference: EN 50428:2005 Switches for household and similar fixed electrical installations — Collateral standard — Switches and related

Re: EN50428 or EN60669-1 (and EN60669-2-1)

2008-05-05 Thread Grace Lin
j...@jmwa.demon.co.uk wrote: In message 2a93eb060805050348y65dedd3axd70a38ee5b984...@mail.gmail.com, dated Mon, 5 May 2008, Grace Lin graceli...@gmail.com writes: For an electronic dimmer module, which standard(s) applies: EN50428 or EN60669-1

FCC Labelling

2008-05-05 Thread Grace Lin
Dear Members, Is there any addtitional information need to accompany the product if the user manual (including FCC warning/caution statement) is provided over the Internet? According to the Guildlines for Labelling and User Information for Devices Subject to Part 15 and Part 18 (a link can be

Re: Electrical Safety regulations regarding PLUGS for DIRECT PLUG-IN TRANSGFORMERS in CHINA

2008-05-06 Thread Grace Lin
Constantin, The implementation rule, governing CCC approval process, for the standards Ted pointed out is CNCA-01C-003. An English version of this implementation rule is available from the CNCA web site at www.cnca.gov.cn. Click ENGLISH (upper right corner) to go to English web page. The CQC

EMI Data Table

2008-05-12 Thread Grace Lin
Dear Members, Is Excel is the easiest way to create data table (for six data points required) and merge to the Word document for reports? I did Google search this morning. Once I have an Excel data table, I am able to export it to a Word document by opening a Word document and Insert- object -

Table Location for RE Measurement

2008-05-15 Thread Grace Lin
Dear Members, Is there any test standard indicating the location of 1-meter by 1.5-meter table in the (2-meter) turntable? Legend 6) of Figure 11a of ANSI C63.4: 2003 states: Rear of EUT, including peripherals, shall all be aligned and flush with rear of tabletop. I assume this legend

EU DoC on 2.4GHz TX Modules

2008-05-20 Thread Grace Lin
Dear Members, Is there any EU rule specified reqirements for a transmitter module? My questions are: 1). Does CE mark apply to a transmitter module? 2). If yes from 1), does a DoC need to include Low Voltage Directive and EMC Directive? Thank you and look forward to hear from you. Best

Power Spectral Density Measurement

2008-06-18 Thread Grace Lin
Dear Members, I need your help to find out what may be wrong/inaccurate for the power spectral density measurement per 47 CFR 15.247. I was told the data I took was about 6 dB higher. I follow the measurement procedure (PSD Option 1) for the digital transmission system, published by the FCC (

Re: Power Spectral Density Measurement

2008-06-27 Thread Grace Lin
, Grace Lin graceli...@gmail.com wrote: Dear Members, I need your help to find out what may be wrong/inaccurate for the power spectral density measurement per 47 CFR 15.247. I was told the data I took was about 6 dB higher. I follow the measurement

Re: CCC processes

2008-07-03 Thread Grace Lin
Dear Richard, The location of an agent maybe not important as the CCC application process is online. CQC (the only CCC certification center for ITE)mails out CCC certificates worldwide, through international express mail (EMS), without additional charge to an applicant. Best regards, Grace

Re: Power Spectral Density Measurement

2008-07-03 Thread Grace Lin
...@cubic.com wrote: From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Friday, June 27, 2008 7:01 AM To: emc-p...@ieee.org Subject: Re: Power Spectral

Re: Query on dealing with BSMI for EMC

2008-07-08 Thread Grace Lin
Jim, You don't need a number if you follow the instruction Bob provided (to have NVLAP include the CNS 13438 scope). BSMI does conduct laboratory assessment for labs located outside of Taiwan. There is no benefit to go through this route if your lab is NVLAP/A2LA accredited. For Taiwan's

Re: Low Loss Coax Cable

2008-07-16 Thread Grace Lin
Hi Brian, MegaPhase carries low loss cables (http://www.megaphase.com/test06.html). Several commercial labs in the northeast of the US use its cable. Order EM40 for flexibility even you don't need performance up to 40GHz. EM18 is not flexible and too difficult to connect to instrument. The

Re: Low Loss Coax Cable

2008-07-17 Thread Grace Lin
to 6Ghz) so I'm really dancing a line between insertion loss vs flexibility. The other Brian From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Wednesday, July 16, 2008 7:23 AM

Re: Commercial EMI test software, need opinions on

2008-07-22 Thread Grace Lin
Ken, I just went through this choosing process and would like to share my experience. My former employer uses TILE. It was excellent as Mike set up everthing for a customer to start with. Due to the transfer of the ownership, It was not on the market early this year. Last May, a technician

FCC Part 15 Certification Application

2008-07-29 Thread Grace Lin
regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to emc-p...@ieee.org Instructions

Re: Class A antenna distance

2008-07-31 Thread Grace Lin
Greetings John, What is the possibility to have CISPR accept 3m measurement distance, unconditionally, for Class B devices? I feel 3m is more realistic in the residential environment. I argue with (friendly) BSMI (Taiwan's authority). The BSMI regulator tells me if CISPR accepts 3m

Re: Copies of CNS standards

2008-08-13 Thread Grace Lin
the cnsonline and bsmi.gov.tw sites and got a multitude of 404 errors, and a 301 (moved). Also, perhaps Grace Lin could advise, as she once wrote an article on comparing this std to CISPR. -Original Message- From: emc-p...@ieee.org

Re: Copies of CNS standards

2008-08-13 Thread Grace Lin
John, I have to agree with you. An engineer from CESI, the publisher for GB standards, told me that China does not issue an official English version of GB standards to avoid any issue that may arise due to translation. Best regards, Grace On 8/13/08, John Woodgate j...@jmwa.demon.co.uk

Re: CCC Requirements for Harnesses and Manuals

2008-08-25 Thread Grace Lin
Craig, I will respond to your first question offline. For the question regarding manuals, from my understanding, the answer is yes. A manufacturer must ship a manual in Chinese with a product. I hope this helps. Grace On 8/25/08, Petrie, Craig D cp185...@ncr.com wrote: Dear

EN 62133

2008-08-26 Thread Grace Lin
Dear Members, Is EN 62133: 2003 identical to IEC 62133: 2002? Is it an EU harmonized standard? If yes, which directive is this standard being categorized to? Thank you and look forward to your help. Best regards, Grace Lin

Re: EN 62133

2008-08-27 Thread Grace Lin
standard will be sufficient for products sold in Europe. Ted Eckert The opinions expressed are my own and do not necessarily reflect those of my employer. --- On Tue, 8/26/08, Grace Lin graceli...@gmail.com wrote: From: Grace Lin graceli...@gmail.com Subject: EN 62133

UL Recognized Component

2008-09-08 Thread Grace Lin
Dear Members, Can someone direct me URLs to find information for UL recognized components? More specifically, is MH29816 a valid UL recognized Li-on battery? If yes, is there any possibility to find its test report online? Thank you very much. Best regards, Grace Lin

Re: Labeling Requirements per Industry Canada

2008-09-10 Thread Grace Lin
://www.atcb.com/ 703-847-4700 fax 703-847-6888 direct - 703-880-4841 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Tuesday, September 09, 2008 11:17 AM To: emc-p...@ieee.org Subject: Labeling Requirements per

Labeling Requirements per Industry Canada

2008-09-09 Thread Grace Lin
. If yes for the above question, is there any procedure we or our OEM supplier has to follow (permissive change, etc.) ? Thank you and look forward to hear from you. Best regards, Grace Lin All Category I radio equipment intended for use in Canada shall permanently display on each

Voltage Probe

2008-09-17 Thread Grace Lin
Dear Members, I am looking for the infomation (brochure, specifications, user's manual, etc.) on the following voltage probe. Manufacturer: TASTKOPF Model: TK9416 Your help is highly appreciated. Best regards, Grace Lin

Economic RE Turntable

2008-09-17 Thread Grace Lin
to help. I don't need to build it by myself. Thank you very much for your time and look for your help. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website

Re: CCC Standard - IEC Equivalent request (60950 topic)

2008-09-19 Thread Grace Lin
Hi Craig, China has been open. Many engineers are young and accept the latest version of the standards. If you know which lab your application will be forwarded to, you (or your people) may contact that lab to double check. This was the way I did several years ago. Please let me know if you

Speakers for EMC Regulatory Requirements

2008-09-29 Thread Grace Lin
the travel expenses. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to emc-p

Re: Labeling Requirements per Industry Canada

2008-10-10 Thread Grace Lin
...@elliottlabs.com To: Grasso, Charles charles.gra...@echostar.com, Grace Lin graceli...@gmail.com, emc-p...@ieee.org Subject: Re: Labeling Requirements per Industry Canada Date: Thu, 9 Oct 2008 08:35:54 -0700 (PDT

Re: Compliance of 3G Equipment

2008-10-17 Thread Grace Lin
Kevin, If you need answers from the authorities, for FCC, you can submit an inquiry through the FCC OET web site at https://fjallfoss.fcc.gov/oetcf/kdb/index.cfm. Click the Submit an Inquiry under the Site Options on the left. I submitted one inquiry last Monday around noon and received a

Antenna Calibration

2008-10-24 Thread Grace Lin
to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to emc-p...@ieee.org Instructions: http://listserv.ieee.org/request

Cell and Battery Designation in IEC 61960

2008-10-24 Thread Grace Lin
Dear Members, Can someone confirm the following Cell and battery designation under 5.1 of IEC 61960: 2003? Battery shall be designated with the following form: N 1 A1 A2 A3 N2 / N3 / N4 – N5 Cells shall be designated with the following form: A 1 A2 A3 N2 / N3 / N4 The Japanes

Re: Cell and Battery Designation in IEC 61960

2008-10-24 Thread Grace Lin
Never mind. I mess up the definition/translation of cell and batteries. My fault. On 10/24/08, Grace Lin graceli...@gmail.com wrote: Dear Members, Can someone confirm the following Cell and battery designation under 5.1 of IEC 61960: 2003? Battery

Re: Cell and Battery Designation in IEC 61960

2008-10-24 Thread Grace Lin
404.387.1224 C 847.761.3145 F From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Friday, October 24, 2008 10:21 AM To: emc-p...@ieee.org Subject: Cell

Antenna Calibration

2008-10-27 Thread Grace Lin
Dear Jonathan, Thank you very much for sharing. I have a 3m chamber. What is your or members' comment I should request three or ten meter calibration distance? My concern is: Section 5.1 of ANSI C63.5-2006 (two paragraphs excerpted below for convenience) states For either use, the

Re: Cell and Battery Designation in IEC 61960

2008-10-27 Thread Grace Lin
From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Friday, October 24, 2008 10:21 AM To: emc-p...@ieee.org Subject: Cell and Battery Designation in IEC 61960

Re: Cell and Battery Designation in IEC 61960

2008-10-28 Thread Grace Lin
phone: 508-766-1502 fax: 508-766-1145 From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Monday, October 27, 2008 3:18 PM

Re: Cell and Battery Designation in IEC 61960

2008-10-28 Thread Grace Lin
/ From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Leber Jody-G19980 Sent: Tuesday, October 28, 2008 6:49 AM To: Grace Lin; emc-p...@ieee.org Subject: RE: Cell and Battery Designation in IEC 61960 Grace

Re: CCC Question - alternate parts

2008-10-29 Thread Grace Lin
Hi Craig, For alternate parts, the certificate holder submits an application for change (or application for modification, depending on translation) to CQC (not a new application), according to a vice president of the CQC. Please let me know if I can be of any further assistance. Regards,

Re: Radiated Emission Measurements above 1GHz

2008-10-30 Thread Grace Lin
BSMI (Taiwan), the publisher for the CNS 13438, is more likely to follow the VCCI's time frame for the site requirement above 1 GHz. Grace On 10/29/08, Larry Stillings la...@complianceworldwide.com wrote: Currently Australia / New Zealand and VCCI have put a tempory stay on

Re: China CCC-S Label

2008-11-18 Thread Grace Lin
Go to CNCA website at http://219.238.178.8/20040420/column/227.htm. Section 6.1 of each implementation rule shows the mark for the products. On 11/17/08, Gartman, Richard rgart...@ti.com wrote: Members, I am looking for what products need the CCC-S mark for China?

Re: EMI Receivers

2008-11-24 Thread Grace Lin
Tim, Many members answered your questions. Regarding calibration, I attach RS response from the sales manager, who sold me an ESU40 early this year, for your reference. In spite of what you may have read or heard, the ESU40 is calibrated in our Columbia Maryland facility unless you require

3701 Line Probe

2008-12-04 Thread Grace Lin
Dear Members, I purchased and received a 3701 line probe. I need your help to learn this probe. I attach its calibration data below for reference. Two types of calibration data, Impedance and Insertion Loss, come with the probe. Question 1: The impedance varies a lot over the frequency

Re: Mobile Phones in EMC Labs

2008-12-09 Thread Grace Lin
Hi Luke, My opinion is yes. Years ago when I worked for a commercial lab using a RS receiver, the pre-scan data pick up noise from a cell phone. The lab bans the use of cell phones (all cell phones have to be off). Regards, Grace On 12/9/08, Luke Turnbull luke.turnb...@trw.com wrote:

Re: 5 Meter Chamber For EMI Qualification Testing

2009-01-06 Thread Grace Lin
David, Tim, and Others: It is still an issue in Taiwan. BSMI do not feel comfortable to accept 3m data due to the near field concern. If CISPR 22 (or its replacement) committee explicitly accepts 3m data, BSMI will accept 3m data. Regards, Grace On 1/6/09, Heald, David

Re: 5 Meter Chamber For EMI Qualification Testing

2009-01-09 Thread Grace Lin
Hi Charles and others, BSMI confirms data taken at 3m per CNS13439 requirements is acceptable. Regards, Grace Lin On 1/8/09, Grasso, Charles charles.gra...@echostar.com wrote: Hi Grace – CNS13439 requires a 3m test to prove compliance. Do you know if this will be an issue

Re: 5 Meter Chamber For EMI Qualification Testing

2009-01-09 Thread Grace Lin
From: emc-p...@ieee.org [mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Friday, January 09, 2009 8:45 AM To: Grasso, Charles Cc: emcp...@aol.com; emc-p...@ieee.org Subject: Re: 5 Meter Chamber For EMI Qualification Testing

Re: In house test equipment

2009-01-23 Thread Grace Lin
You may address your question to the third department of BSMI. - Grace On 1/19/09, codymil...@micron.com codymil...@micron.com wrote: Hi all, I have a question regarding Taiwan regulatory requirements. We have some in house custom bench top test equipment we have

Ground Plane per CISPR 15

2009-01-23 Thread Grace Lin
Dear Members, Are vertical and horizontal groundplanes required for measuring disturbance voltages per Section 4.3 of CISPR 15? CISPR 15 doesn't mention any groundplane while CISPR 22 does. My colleague concludes that groundplanes are not required. Do you agree with the conclusion? Thank

Re: Ground Plane per CISPR 15

2009-01-23 Thread Grace Lin
2009, Grace Lin graceli...@gmail.com writes: Are vertical and horizontal groundplanes required for measuring disturbance voltages per Section 4.3 of CISPR 15? CISPR 15 doesn't mention any groundplane while CISPR 22 does. My colleague concludes that groundplanes

Re: In house test equipment

2009-01-23 Thread Grace Lin
[mailto:emc-p...@ieee.org] On Behalf Of Grace Lin Sent: Friday, January 23, 2009 5:54 AM To: emc-p...@ieee.org Subject: Re: In house test equipment You may address your question to the third department of BSMI. - Grace On 1/19/09, codymil

Re: Ground Plane per CISPR 15

2009-01-26 Thread Grace Lin
Thank you very much, John. One more question: What is the role of CISPR 16 series to CISPR family standards, such as CISPR 15? For example, I though disturbance voltage measurement mentioned in CISPR 15 should follow CISPR 16-2-1. From what I have learned from you, it seems CISPR 16 series are

Calibration Standards for LISN

2009-01-27 Thread Grace Lin
. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p...@ieee.org All emc-pstc postings are archived and searchable on the web at http://www.ieeecommunities.org/emc-pstc Graphics

Does CE Apply to Infrared Emitter Probes

2009-01-30 Thread Grace Lin
Dear Members, Does CE apply to infrared emitter probes? The probe is designed adhere directly over the sensor window of TV providing a 1-way IR control interface to the TV. Thank you and look forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product

[PSES] Surge Generator per UL 244A

2013-10-04 Thread Grace Lin
forward to hearing from you. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p...@ieee.org All emc-pstc

[PSES] Rated Power vs Active Input Power per 61000-3-2

2013-10-10 Thread Grace Lin
equipment; Clause 7.3 of IEC 61000-3-2: 2005 uses Active Input Power. How are rated power and active input power related? Thank you very much. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc

Re: [PSES] RS FSP Spectrum Analyzer

2015-02-18 Thread Grace Lin
Thank you very much, Ken. After reading your comments, I did Google search using the word of pre-compliance. Pages 68-69 of an RS presentation file ( http://www.rohde-schwarz.com.vn/file_15628/EMC_Precompliance_Solutions.pdf) provides some hints. The FSP (replaced by FSV) is a precompliance

Re: [PSES] RS FSP Spectrum Analyzer

2015-02-16 Thread Grace Lin
required by standards that are ever changing to keep up with wireless technology, and the personnel qualified to operate the equipment and perform the testing. Naturally all of this must be done on a lab's shoestring budget. Bill -Original Message- From: Grace Lin [mailto:graceli

[PSES] RS FSP Spectrum Analyzer

2015-02-16 Thread Grace Lin
devices). I am looking/searching for justifications to request a new one. Thank you very much. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message

Re: [PSES] RS FSP Spectrum Analyzer

2015-03-06 Thread Grace Lin
that are intermittent or erratic. 2. The spectrum analyzer has to be able to measure pulse repetition frequencies as low as 20 Hz I know we have many experts in the group to answer my next questions: how these factors affects the measurement? Thank you and have a nice weekend! Best regards, Grace Lin

[PSES] EN Test Standards for Sous Vide Water Immersion Circulator System

2015-03-04 Thread Grace Lin
advice. Best regards, Grace Lin - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to emc-p...@ieee.org All emc-pstc postings are archived

[PSES] Preamplifiers

2015-02-25 Thread Grace Lin
) Are there any other parameters to be consider when choosing a preamplifier? I did note a lot of spectrum analyzers and EMI receivers have a built in preamplifier. Thank you very much for your time and I look forward to hearing from you. Best regards, Grace Lin 8449B Microwave Preamplifier, 26.5

  1   2   >