at [EMAIL PROTECTED] for my cv or resume.
Kindest Regards,
Lloyd Good
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To leave this list visit:
* http://www.techservinc.com/protelusers/leave.html
*
* Contact the list manager
Hello all,
I have a client that is looking for a Protel 99SE license. Does anyone have
one for sale. Please email me off-line at [EMAIL PROTECTED]
Thanks,
Lloyd Good
Circuit Creations
92 Holly Street NW
Calgary AB Canada
T2K 2C8
ph: (403)282-6445
cell:(403)710-5077
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com/geharrisenergy/
NOTICE
Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com
this is V3.5, I
suspect that the translator expects PowerPCB 2000 format.
Has anyone had good results translating files from PADS 2000?
Regards,
GE Energy Services
__
Lloyd Good
Development Digitization
at position 32
Anyone seen this before and have any answers how to fix it.
Regards,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728
Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website
? Or the
alternative is to have it converted directly into Unidoc, which we can't do
either.
Any thoughts?
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General
and in copying and
rotating the component?
I may just be grasping at air here, but I'd be curious to know if the
metric/imperial conversion played any part.
Cheers,
GE Energy Services
__
Lloyd Good
Development
,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com/geharrisenergy/
NOTICE
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com/geharrisenergy/
NOTICE: The information contained
for it, it should be pretty cheap.
Regards,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7
for complex double
sided. It seems to me that you can't beat the proto-1 service at AP
Circuits. Just my opinion!
www.apcircuits.com
Cheers,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com
,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
General Electric Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax
__
Lloyd Good
Development Digitization
Substation Automation Solutions
GE Harris Energy Control Systems Canada, Inc.
2728 Hopewell Place N.E., Calgary, Alberta T1Y 7J7 CANADA
Tel: 403.214.4777, Dialcomm: 8.498.4777, Fax: 403.287.7946
Website: www.gepower.com/geharrisenergy/
NOTICE
to be
centered to start with, yet I had the problem?
Cheers,
GE Energy Services
__
Lloyd Good
Development Digitization
Substation Automation Solutions
GE Harris Energy Control Systems Canada, Inc.
2728 Hopewell
did work and passed FCC/DOC testing.
Regards,
Lloyd Good
Engineering Systems Co-ordinator
GE Substation Automation Systems
2728 Hopewell Place NE
Calgary, Alberta, Canada
T1Y 7J7
Tel: (403) 214-4777
Fax:(403) 287-7946
email: [EMAIL PROTECTED
to Windoze 2K Pro.
This OS seems to be very stable and will eliminate the pregant pause
problem.
Other than that, more information may be required.
Cheers,
...OLE_Obj...
GE Energy Services
__
Lloyd Good
Ahhh Mr Jenkins,
I was wondering when you would jump into the fray. I've missed your soft
demeanor and objectiveness. It has been so long since I've been indirectly
compared to an aging dweeb and twits. I should have explained that I do
not differentiate between PCB designer and Engineer as the
a slide rule that works just fine.
Sounds like some projects are not as complex as others.
IMHO
Lloyd Good
-Original Message-
From: robi artwork [mailto:[EMAIL PROTECTED]]
Sent: Thursday, February 07, 2002 5:29 AM
To: Protel EDA Forum
Subject: Re: [PEDA] Re[3]: View PCB 3D
Hallo Waldemar - tut
Brad,
I understand the sentiment of the Protel viewer by others in the forum. I
suppose the point that I am trying to make it that Protel is an EDA tool not
a 3D CAD package. I don't expect it to be. I use it for what it is intended,
not for what is not intended. Ergo, I use the 3D export utility
Many users will not want to have to convert all their libraries to include
3-D information
This is my point exactly. Some PCB designers have no interest in the 3D
world, so let's not create a proverbial white elephant inside of Protel. The
functionality you request would add cost, or possibly
Mr Lomax,
I don't believe that I missed your point at all, I just don't agree. There
is no such thing as a simple 3D model. If all you want is simple height,
you might want to follow Robi's advice and calculate the separations with a
pencil and paper. If you need interference checking as you
Sean,
I hope you charge this guy by the hour!!
-Original Message-
From: Sean James [mailto:[EMAIL PROTECTED]]
Sent: Thursday, December 20, 2001 1:27 PM
To: Protel EDA Forum
Subject: Re: [PEDA] Altium preps topological autorouter
To quote Mike Reagan -
What could be simpler and faster
Dave,
With regard to the first item. Which service pack are you running. I seem to
remember this same issue with anything before service pack 4 or 5. I
remember the PAD net text being black and hard to read. Make sure you are
running at least service pack 5. There are some issues with SP6 that I
I'm with you Dennis, I never copy the whole board into the panel. I just use
another Mechanical layer (usually 3) to create a panelization drawing and
let the fab house deal with it. We always print out the panel drawing and
include it in the ECN package. Many of our test fixtures are created
While I have set this parameter, it seems that new netlist loading will
still see the new connections use a default grey color which is not the
color I have set. Has anyone else seen this? Possibly a bug?
-Original Message-
From: Thomas [mailto:[EMAIL PROTECTED]]
Sent: Thursday,
On Wed, 12 Dec 2001 18:02:23 -0600, Jon Elson wrote:
Abd ul-Rahman Lomax wrote:
Any comments on the level of support others have gotten?
I've not called for any tech support since Protel moved from California to
Utah. The last time I spoke to someone at Protel, Sam Cox and Vinh Ho were
Tim,
Under the CAM outputs, you have choices to generate gerbers, NC Drill, Pik
and Place etc. This the the section that you wish to use. Just choose to
generate Pick and Place which gives you two files a *.txt and a *.csv file
of the X/Y co-ordinates for the components. Also choose to generate a
Steve,
You can export the print preview parts out to a windows metafile, but for
small snips of pcb this is a real lengthy process. You're better to use a
utility (shareware) called Snag-it . This is a great little utility and
very easy to use, you can select portions of the screen or the whole
Further to this thread, does anyone know how to set the default color of the
ratsnest lines. I know how to edit them but would prefer that they came up
with the color of my choice everytime they were created.
Regards,
Lloyd
-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL
If possible I would love a copy too, Please.
[EMAIL PROTECTED]
-Original Message-
From: Georg Beckmann [mailto:[EMAIL PROTECTED]]
Sent: Wednesday, December 05, 2001 12:04 AM
To: 'Protel EDA Forum'
Subject: [PEDA] AW: CAMTASTIC GERBER TO PROTEL TRANSLATOR?
I sent it to Abdulrahman
Does anyone know how to get Camtastic to check for these hanging traces?
Cheers,
Lloyd
-Original Message-
From: Ian Capps [mailto:[EMAIL PROTECTED]]
Sent: Tuesday, December 04, 2001 3:53 PM
To: Protel EDA Forum
Subject: Re: [PEDA] Unconnected Traces
Nick
You will need to look into
Why would you want to take a step backwards!
-Original Message-
From: Watnoski, Michael [mailto:[EMAIL PROTECTED]]
Sent: Wednesday, November 21, 2001 7:12 AM
To: 'Protel EDA Forum'
Subject: Re: [PEDA] Pin gate swapping
My best recommendation would be to toss Protel out and use
programming (Xilinx Foundation or fascimile) dictate what pins get connected
to what signal.
Regards,
Lloyd Good
-Original Message-
From: Abd ul-Rahman Lomax [mailto:[EMAIL PROTECTED]]
Sent: Wednesday, November 21, 2001 12:51 PM
To: Protel EDA Forum
Subject: Re: [PEDA] Pin gate swapping
overall general opinion of the developments from AutoTrax 6.0 to DE
99SE?
Regards,
Lloyd Good
-Original Message-
From: Fred A Rupinski [mailto:[EMAIL PROTECTED]]
Sent: Tuesday, November 20, 2001 9:10 AM
To: Protel EDA Forum
Subject: Re: [PEDA] Protel usage
Most of us make the best
Bill,
Sounds like the exact type of situation we are in. We have old schematics in
Autocad, old pcbs in PCAD and even a few designs in old Orcad. Until
recently, we used the same file managment system you describe and frankly I
did everything I could to get rid of it. What nonsense it was to keep
Ralf,
I think what Mr Lomax was doing was trying to find a way for our unilingual
cousins to the South to remember what antwort means, not it's literal
translation.
Auf wiedersehen,
-Original Message-
From: Ralf Gütlein [mailto:[EMAIL PROTECTED]]
Sent: Monday, November 19, 2001 10:12
there,
I am making the best of the current situation.
Regards,
Lloyd Good
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To leave this list visit:
* http://www.techservinc.com/protelusers/leave.html
*
* Contact the list manager:
* mailto
I'm with you, Tony. You couldn't pay me to go backwards into the old
separated file method. Our designs use a numbering scheme which in the past
meant having to look up on paper records which version of schematic matched
what version of pcb. The ddb file system makes it fast and idiot proof.
Colin et al,
Further to your point, if Altium / Protel or whatever you want to call them
now were smart, they would buy out the 3D export features from Desktop-eda
and incorporate them into the next version.
The 3D viewer that Protel offered with the SE version is what prompted me to
contact
Rob,
If you send me the file I have a PCAD file convertor, you may lose some hole
information but most everything comes across okay. What ever doesn't can be
fixed in Protel.
Regards,
Lloyd Good
Engineering Systems Co-ordinator
GE Substation Automation Systems
2728 Hopewell Place NE
Calgary
Hello all,
Has anyone had any success in converting old (versions 2 3) PADs files
into Protel?
We have a company that we purchased whose old files are in these formats and
need some conversion utility to do many file conversions.
Please advise.
Lloyd Good
Engineering Systems Co-ordinator
GE
of his dept and into the released section of files,
which would be disastrous.
Regards,
Lloyd Good
Engineering Systems Co-ordinator
GE Substation Automation Systems
2728 Hopewell Place NE
Calgary, Alberta, Canada
T1Y 7J7
Tel: (403) 214-4777
Fax:(403) 287-7946
email: [EMAIL PROTECTED]
-Original
to see some
Designator conventions used by all of you. Please include as many as
possible in your replies. The more ammunition the better.
Note- I would prefer more North Amercian conventions as we are a N.A
company.
Thanks,
Lloyd Good
GE Harris Energy Control Systems Canada Inc.
2728 Hopewell
of the footprint first after its
creation.
When we use outside contractors, the same rules apply, we supply our pcb
footprint library on CD.
Just what we are doing. Seems to be working.
Lloyd Good
GE Harris Energy Control Systems Canada Inc.
2728 Hopewell Place NE
Calgary, AB, Canada T1Y 7J7
(403) 214
Hello all,
One thing I have never figured out is how to arrange the order of the sheets
in a project so that they are in the order that I want, and that they print
in that order. Has anyone ever bothered to figure it out and could you
please enlighten me?!
Regards,
Lloyd Good
GE Harris Energy
I may be wrong but as I understand it, gerber layers don't have holes in the
pads. So it would seem reasonable to assume that your total 2030 is 0mm.
Unless your talking about the NC drill files in which case I'm talking
through my hat and you're in trouble.
Regards,
Lloyd Good
GE Harris Energy
.
Thanks in advance.
Lloyd Good
Engineering Systems Co-ordinator
GE Harris Energy Control Systems Canada Inc.
2728 Hopewell Place NE
Calgary, AB, Canada T1Y 7J7
* +1 (403) 214-4777
* +1 (403) 287-7946
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL
but not enough to do
adequate research.
Any comments?
Lloyd Good
Engineering Systems Co-ordinator
GE Harris Energy Control Systems Canada Inc.
2728 Hopewell Place NE
Calgary, AB, Canada T1Y 7J7
* +1 (403) 214-4777
* +1 (403) 287-7946
-Original Message-
From: Brad Velander [mailto:[EMAIL
is that the power ports which should be
global aren't being connected.
Any suggestions?!
Lloyd Good
Engineering Systems Co-ordinator
GE Harris Energy Control Systems Canada Inc.
2728 Hopewell Place NE
Calgary, AB, Canada T1Y 7J7
* +1 (403) 214-4777
* +1 (403) 287-7946
the wrong
connections. Viola.fixed. Apparently Protels ERC checker did not pick up
the multiple connections for what ever reason. I even made sure the multiple
net name check was on. It may have to do with the sheet not having many net
labels on the connectionsnot sure.
Thanks again,
Lloyd Good
55 matches
Mail list logo